HomeMy WebLinkAbout1962-06-25 169-P ORDERee-v
Introduced by councilor erounxas, June 25, L912
CITY OF BANGOR
(TITLE.) (Jorbrrr, ......_A tb rt SnN.co,.a9tr,mt,on o, -,,. s or on limon sxroot
BY the City Cmowii of Vs City ofBaegor:
ORDERED,
THAT the City Engineer is hereby directed to construct a
new sewer along the easterly side of the Union Street right-of-way
southerly from the location of the Chuck Wagon" restaurant to
the existing brook, a distance of about 600 feet, all in accordance
with an agreement Signed by Paul R. Nadeau, and dated June 19,
1962, and the City Engineer Is further
ORDERED, to Submit a written report upon completion of the new
construction to the City Council for further action.
169-P
RECEIVED 08p61
1962 JUN 20 PM 4:20 tido _
CITY CLERK'S OFFICE sewes.9v.
.QTY OP BANGOR. MAKE
union Sveet.......................
IN CITY COUNCIL _
June 25, 1962 ... a oed sed filed by
PASSED
tTfCRYO
N°. 9456 STATE HIGHWAY COMMISSION
State of Maine Permit No. 142-Day.3
1812 Estimated Fee Paid None
In accordance with application for format, permission is hereby granted City of Besmear
to open in the Town of Banner
State maiae Highway No. as follows:
ESTIMATED SQUARE YARDAGE TO BE OPENED
Bituminous on Concrete Ease Bituminous treated shoulder or sur.
Portland Cement Concrete Plain gravel surface or shoulder undeterkned
Bituminous concrete m macadam
Pnrpoee of opening(1on,txv,,Lm, Off v -c- pipe sewer
opeaing to be closed within
10 days from permit date and actual square yards opened will be measured by Supervisor
Llgvn Rmberts and permittee wiI be billedfor difference between
estimated fee paid and final fee determined by measurement of opening.
This parent is issued in accordance with Cbap. 23, See. 30, Chap. 50, Sed. 16, 19, and 21, Chap.
96, See. 112 to 120, R. S.1954, and under the following conditions:
The opening shall be fenced off with proper Barricades and shall be adequately lighted from sunset
he sunrise and not less than one-half of the width of the travelled way shall be open to tralfie at all
Usage.
That all backfill materials shall be thoroughly compacted and that the top of the trench shall be of
dean gravel to the depth of the base and in no rase less then 12 inches, also all surplus material re-
aining after excavation has been properly backfilled shall be removed from surface, shoulder am
ditches.
THAT ALL SURFACE AREA COVERED BY THIS PERMIT WILL BE REPLACED ONLY
BY CREWS OF TBE STATE HIGHWAY COMMISSION.
STATE HIGHWAY COMMISSION
Division of Mainteneme
By
Ral N. -Amb ar, Div. Eng.
�z
TO APPLICANT
KEVFFEL LESSER CO, �
NEW VVRN PR iLATE Aq'4 V NEVfFELe ESEEP CO.
NEW ryPN
wz STANDARD m
i
t
jj
I,
-------
Gro
�
.3ac
3/mss
-:�
*G
�iN
gs�
5'ro Gan
'i
--
KEVFFEL LESSER CO, �
NEW VVRN PR iLATE Aq'4 V NEVfFELe ESEEP CO.
NEW ryPN
wz STANDARD m