HomeMy WebLinkAbout1962-05-14 136-P ORDER1962
Introduced by Councilor Bla lsdelh May 16, 3962
_ CITY OF BANGOR
(TITLE,) 00Era :, ceptirg report of city Engine Essex Street sever _...
Extension
By W City Consul of C1tx of Bass";
OBDfIOLED,
THAT the attached report of the City Engineer showing the
costs of a proposed sewer extension on Essex Street together with
a list of possible assessments is hereby accepted.
136-P
RECEIVED ORDER
1962 MAY -3 2M 3: 46 "21u '
CITY CLERK'S OFFICE :?c.FSRtigg !?seNct �f �itx E!wlassr.
°!TY 8P RANCOR, MAINE
IN CITY COMIL
May 14, 1962
Clark directed to advertise a public
hearing for May 28th. Referrsd to
Public Works Committee, tabled.
CLERK
IN CITY COUNCIL
May 28, 1962
Taken from table, Hearing held and
PASSED
Essex St. Sewer Extension.
.............................
�lvbeadveM W ri by
l� G
CS TY OF BANGOR, MAINE
Engineering Department
May 29 1962
To: The Municipal Officers
Pursuant to Council Order No. 122-P, passed April 23, 1962,
directing the City Engineer to make the necessary surveys, prepare
plans and coat estimates together with a list ofpossible asmees-
menta for a sewer extension northerly on Essex Street, the follow -
Ing report is submitted.
The requested extension will require the construction of
one hundred ninety (190) feet of 8 inch vitrified clay pipe.
The estimated cost of this construction amounts to eight hundred
ninety dollars ($890). This estimate does not include the cost
of ledge removal should it be encountered. Of the total esti-
mated costo 75% or six hundred sixty-seven dollars and fifty
cents ($667.50) may be assessed against the property benefited.
A list of possible assessments follows:
Essex Street
East Side
MemeEstimated
Frontage Assessment
Carroll E. Cakes 1501 $435.33
West Side
Grace B. & Stanley E. Shannon 80t 232.17
Plan accompanies this report.
Reepecttfull7 sukbmmiiitt�eedd,
James L. MaeL od
City Engineer
MM:1
Notice is
CITY OF BAN.iCR "
PUBLIC NOTICE
Risen that those is POMisg before the City Council of No
the following orders
(TITLE.) ORDER, Accepting Report o: City Engineer - Essex Street Sewer Extension,
By the City Council of the City of Bangor:
ORDERED,
THAT the attached report of the City Engineer showing the costs of a
proposed sewer extension on Essex Street together with a list of possible
assessments is hereby accepted.
Engineering Department
May 2, 1962
To: The Municipal Officers
pursuant to Council Dreher No. 122-P, passed April 23, 1962, directing the
City Engineer to make the necessary surveys, prepare plans and cost estimates
together with a list of possible assessments
sments for a sewer extension northerly
on Essex Street, the following report Is submitted.
The requested extension will require the construction of one hundred ninety
(190) feet of 8 inch vitrified clay pipe. The estimated cost of this construct-
ion amounts to eight hundred ninety dollars ($ago). This estimate does not
Include the cost of ledge removal should it be encountered. Of the total
estimated cost, 75% or six hundred sixty-seven dollars aha fifty cents ($667.50)
may he assessed against the property benefited. A list of possible assessments
follows:
Essex Street
East Side
More Frontage Estimated
Assessment
Carroll E. Oakes 150' $435.33
West Side
Grace B. A Stanley E. Shannon 80' 232.17
Plan accompanies this report.
Respectfully submitted,
James L. MacLeod[ (s)
City Engineer
JLM:1
A Public Hearing will be hold in the Council Raw, City Nall, May 2B, 1962
at 8900 o'clock P.M. All parsons for per against the approval of this oder way
be hoard, if they desire.
PER ORDER CITY COUNJIL
May 18, 1962 Jay E. Alleys City Clerk
t�.:.F9!.{(.W rt..:PNW>::+tli'4A11PH1M8ubiGye j{`G" > eiYl�iD'A@MT".!-'I
CO,, or BANGOR
%at NAI . dumare Wake we rare Blurt a VAN
BMW
a.
r` "°°tea
r.4.�{��aM
Me .a..".. RA m`.:Y :' . am a tell
...��.. w.wrTHAT
Barrel., Fee Net
B
"WO BAN
Trek Ter 11 .1 1
ok
Alterreeka
dealer Bar. IT
ANN
or 'N AIR" R Oberearded aw Bell
Eddral I)
raw "Nard,
HIMAN B" AdNN m
A°:maAINUM.
oa BAR
G.
Near N,
.._..