Loading...
HomeMy WebLinkAbout1962-05-14 136-P ORDER1962 Introduced by Councilor Bla lsdelh May 16, 3962 _ CITY OF BANGOR (TITLE,) 00Era :, ceptirg report of city Engine Essex Street sever _... Extension By W City Consul of C1tx of Bass"; OBDfIOLED, THAT the attached report of the City Engineer showing the costs of a proposed sewer extension on Essex Street together with a list of possible assessments is hereby accepted. 136-P RECEIVED ORDER 1962 MAY -3 2M 3: 46 "21u ' CITY CLERK'S OFFICE :?c.FSRtigg !?seNct �f �itx E!wlassr. °!TY 8P RANCOR, MAINE IN CITY COMIL May 14, 1962 Clark directed to advertise a public hearing for May 28th. Referrsd to Public Works Committee, tabled. CLERK IN CITY COUNCIL May 28, 1962 Taken from table, Hearing held and PASSED Essex St. Sewer Extension. ............................. �lvbeadveM W ri by l� G CS TY OF BANGOR, MAINE Engineering Department May 29 1962 To: The Municipal Officers Pursuant to Council Order No. 122-P, passed April 23, 1962, directing the City Engineer to make the necessary surveys, prepare plans and coat estimates together with a list ofpossible asmees- menta for a sewer extension northerly on Essex Street, the follow - Ing report is submitted. The requested extension will require the construction of one hundred ninety (190) feet of 8 inch vitrified clay pipe. The estimated cost of this construction amounts to eight hundred ninety dollars ($890). This estimate does not include the cost of ledge removal should it be encountered. Of the total esti- mated costo 75% or six hundred sixty-seven dollars and fifty cents ($667.50) may be assessed against the property benefited. A list of possible assessments follows: Essex Street East Side MemeEstimated Frontage Assessment Carroll E. Cakes 1501 $435.33 West Side Grace B. & Stanley E. Shannon 80t 232.17 Plan accompanies this report. Reepecttfull7 sukbmmiiitt�eedd, James L. MaeL od City Engineer MM:1 Notice is CITY OF BAN.iCR " PUBLIC NOTICE Risen that those is POMisg before the City Council of No the following orders (TITLE.) ORDER, Accepting Report o: City Engineer - Essex Street Sewer Extension, By the City Council of the City of Bangor: ORDERED, THAT the attached report of the City Engineer showing the costs of a proposed sewer extension on Essex Street together with a list of possible assessments is hereby accepted. Engineering Department May 2, 1962 To: The Municipal Officers pursuant to Council Dreher No. 122-P, passed April 23, 1962, directing the City Engineer to make the necessary surveys, prepare plans and cost estimates together with a list of possible assessments sments for a sewer extension northerly on Essex Street, the following report Is submitted. The requested extension will require the construction of one hundred ninety (190) feet of 8 inch vitrified clay pipe. The estimated cost of this construct- ion amounts to eight hundred ninety dollars ($ago). This estimate does not Include the cost of ledge removal should it be encountered. Of the total estimated cost, 75% or six hundred sixty-seven dollars aha fifty cents ($667.50) may he assessed against the property benefited. A list of possible assessments follows: Essex Street East Side More Frontage Estimated Assessment Carroll E. Oakes 150' $435.33 West Side Grace B. A Stanley E. Shannon 80' 232.17 Plan accompanies this report. Respectfully submitted, James L. MacLeod[ (s) City Engineer JLM:1 A Public Hearing will be hold in the Council Raw, City Nall, May 2B, 1962 at 8900 o'clock P.M. All parsons for per against the approval of this oder way be hoard, if they desire. PER ORDER CITY COUNJIL May 18, 1962 Jay E. Alleys City Clerk t�.:.F9!.{(.W rt..:PNW>::+tli'4A11PH1M8ubiGye j{`G" > eiYl�iD'A@MT".!-'I CO,, or BANGOR %at NAI . dumare Wake we rare Blurt a VAN BMW a. r` "°°tea r.4.�{��aM Me .a..".. RA m`.:Y :' . am a tell ...��.. w.wrTHAT Barrel., Fee Net B "WO BAN Trek Ter 11 .1 1 ok Alterreeka dealer Bar. IT ANN or 'N AIR" R Oberearded aw Bell Eddral I) raw "Nard, HIMAN B" AdNN m A°:maAINUM. oa BAR G. Near N, .._..