HomeMy WebLinkAbout1960-12-28 37-N ORDER3]-a
Introduced Dec.15, 1960 by Councilor Bram
o-- CITY OF BANGOR
(TITLE,) MiklE;i.-Acceptingawport.nf. the City Engineer on Costof-----
Construction of School Street for a Distance of 650 feet easterly
from Broadway
By the City embol ofche City ofBa"m
ORDERED,
TEAT the attached report showing the coat of the construction
of School Street for a die tance of 6$0 feet easterly from B cadway
together with a list of possible assessments be and hereby is
accepted and it is further
ORDERED that a date be set for a public hearing on the proposed
assessments.
IN CITY COUNCIL
Dec. 28, 19W
Clerk directed to advertise Public
Hearing to be held Jan. 9, 1961,
tabled.
WTL 13.71
IN CITY COUNCIL.
Jan. 9, 1961
Taken from table, Hearin held,
referred to Public Warks Committee,
and Hearing continued, retabled.
ORDER
11 le,
_Accepting. Report. of _City..Engineer ..on
Cost of Construction of School Street
fora Pistance of 6W Ft,_9asterly__
from Broadway
Intredawd and filed by
novNmae
IN CITY COUNCIL
Jan. 23, 1961
Taken from table, PASSED
CITY CL K
Cm M BAmm
PUBLIC NOTICE
Notice is hereby given that there is Pending before the City Counell of the Cit, of
Bangor, Wine, the following Orders
MmA(TITLE.) BROWN, Accepting Report of the City Fnd-crr ce Coat of
School Street for a Distance of 650 Feet Easterly from Broadway.
By the City Council of the City of Bangor:
ORDERED,
THAT the attached report ahwing the test of the construction of School
Street for a distance of 650 feet easterly from Broadway together with a
list of possible assessments be and hereby Is accepted and it is further
ORDERED, that a date be set for a public hearing on the proposal assess-
ments.
CITY OF SAACR9 WINE
Engineering Department
December 13, 19W
To, The Municipal Officers
Pursuant to City Council order #145-M, passed on June 13, 1960, directing the
City Engineer to lay out by metes and bounds and establish grades for School Street,
together with a list of possible assessments to cover the Proportionate share of
the cost of the construction of said School Street, the City Engineer submits the
following report
The construction of this street was completed on Cclober 23, 1960, and this
construction involved the required excavation, furnishing base and surface gravel
and the construction of the necessary drainage structures to properly drain the
street. Total length of the construction amounted to 650 fast, at a total cost
of foe thousand three hundred twenty dollars ($a,=). Of this amount, 50%, or
two thousand one hundred sixty dollars ($2,160), may be assessed against the
property benefited.
A list of possible assessments followsn
North Side
j1amM
Lot Frontage AssassmeM
M. L. Coffin Co. 6 150' 8255.43
M. L. Coffin Co. 62 90' 153.26
M. L. Coffin Co. 63 90' 153.26
P.R. of D„ Vol. 1280, page 55
James will" 139 104.6' 178.11
P.R. of D„ Vol. 1734, page 254
Millard Coffin 139 part of 3.35' 5.70
D., Vol-. 1586. page 120
aCa�._. ,. ,,. 39 par
Vol. 1677, page 355 & 361
Vol. 1684, page lel
Vol. 1712, page 190 & 305
Vol. 1702, page 109
Vol. 1714, page 392
South Side
Lougee -Fredericks
2
150'
255.43
Lougee -Fredericka
3
100'
170.29
Lougee -Fredericks
4
135'
229.88
P.R. of D., Vol. 1692,
Page
280
Clyde Lougee
5 part of
109.11'
185.80
P.R. of D., Vol. 1016,
page
258
Vol. 1118,
page
324
and 325
Ry Winer
5 part of
168.20'
286.42
P.R. of D., Vol. 1674,
page
318
Vol. 16770
page
355
& 361
Vol. 1684,
page
141
Vol. 1712,
page
190
& 305
Vol. 1702,
page
109
Vol. 1714,
Page
392
An accurate plan accompanies this report.
Respectfully submitted,
James I. MacLeod
City Engineer
1961vA Public Hearing
oc will W held in the Council City Hall Bangor, Wine, January 9,
heard at Bnhe o'clock P. M, All Persons for or%against the approval of this Order may be
heard, if they tluln.
Jan. 31 1961 PER MER CITY COUNCIL
Jay E. Allay, City Clerk
m l;�
I � Ii
r f = )-
'I l 41
I
It
I' L076 I L07 6Z _oT / i...<I�a LoT 155
F
i
10 ]
B ra
se JC
RCrhi F _ c
1-10
Hk
� LOT Z I
_Ll
L—LG�, Dr LOVGE
L.�v GEe_
i
CITY OF BANGOR
ENGINEERING DEPARTMENT
I - bGHO)'— T-
RE FLT
REE.T F- "A
1
e / alw BY _ L I AVPRG
W J.: l•r ___ /� Bo LRKE BY _ _ .`
CHECKED BY
/ SHEET-Oi L MEEtS
� XILLf I J J
DATE _ PLAN NO
mx ST NOMD. — STANDARD NEW
PRKEUFFEW ERR co. PF D FEI4NEW NRFER CO. _ PRD LF'm
CITY OF BANGOR, MAINE
Engineering Department
December 13, 1960
To: The Munieipal Officers
Pursuant to City Council Order #145-142 passed on June 13,
1960, directing the City Engineer to lay out by metes and bounds
and ea tablish grades for School Street, together with a list of
possible assessments to cover the proportionate share of the met
of the construction of said School Street, the City Engineer
submits the following report:
The construction of this Street was completed on October 23,
1960, and this construction involved the required excavation,
furnishing base and surface gravel and the construction of the
necessary drainage structures to properly drain the street. Total
length of the construction amounted to 650 feed at a total cost
Of four thousand threehundredtwenty dollars (14.320). Of this
amount, 50%, or two thousand one hundred sixty dollars ($2,160),
may be assessed against the property benefited.
A list of possible assessments follows:
North
Side
Name
Lot No,
Frontage
Assessment
M. I. Coffin Co.
6
150,
`255.43
62
901
153.26
" " " "
63
90:
153.26
P.R.of D., Vol. 1280,
page 55
James Willey
138
104.61
178.11
P. R.of D., Vol. 1734,
page 254
Millard Coffin
139 part
of 3.35
5.70
P.R.of D., Vol. 15860
page 120
Hy Winer
139 part
of 168.201
286.41
P.R.of D., Va1.1674, .318
1677 '
355 & 361
1684 "
141
" 1712 "
190 & 3o5
e 1702 "
109
" 1714 "
392
To: The Nunl cipal Officers Page 2
South Side
Name Lot NO.
Frontage
Assessment
Lougee -Fredericka 2j
150'
$255.43
INT
10.2
4
135'
229.88
P.R.of D.,"Vol. 1692,
page 280
Clyde Lougee 5 part of
109.11'
185.80
P.R.of D., Vol. 1016,
258, Vol. 1118, page
32µe
and
Hy Winer 5 part of
168.20'
286.42
P.R.of D., Vol. 1674 .318
1677'' 355 & 361
1712 " 190 & 305
1702 " 109
" 1714 " 392
An accurate plan acoompanies this
report.
eepoctfully sub"ted,
Samoa Leod
City Engineer
MM:l
Att.