Loading...
HomeMy WebLinkAbout1961-12-11 33-P ORDERaa_w • �• Introduced by Coumil9z Blaisdell, Dec. 11. 1961 CITY OF BANGOR (TITLE.)a (jDrur------ -Accepting Retort of City Evggincer I R Industrial. Park TrjN Sewer By he CityC ssol of to CTEV of Bnnpoz: ORDERED, THAT the attached report showing the costs for the construction of the Industrial Perk trunk sewer, together with lista of possible assessments, be and hereby is accepted. It is further ORD$RED, that a date be set for a public hearing on the possible assessments. RECEIVED 1991 OEC -7 PH 3:59 CITY CLERK'S OFFICE PITY OF RANGOR. MAINE IN CITY COUNCIL Dec. 11, 1961 Referred to Public Works Committee. Clerk directed to advertise public hearing to be held Dec. 27th. Tabled ICITYQKRK IN CITY COUNCIL Dec. 27, 1961 Taken from table, Nearing held and referred to Public Works Committee, tabled CI CLERK IN C Y COUWIILL San. 8, 1962 Voted to remain on table. 1 . n 33-P O RD RR Title, Acceptlnp� Report of C8Y Enq. Rei Induwtrial Park Trunk Sewer Introduced and riled by �lmm IN CITY COUNCIL )AN. 22, 1962 Taken from table, Engineer's report accepted and PASSED As IAIL .. 71:11ni-af Aid TE PITTLEI LIPP IMLI '_ w,.,CM, IV 111011 I'll" EMVI JET 11" 111. PAIMPEE loslo FAIR "INK 5KEECAL VE 1.11 11 w I too 11 111 LT 11 00 IMANIA MITI. 140 39 108 so A IT, 21 AM 51 PEI II Isol. 91 A Pit no it' IT IT IA PEI III 111111, 11 AT EPA 11 1111 1 ME 11 1 113, 1 INIIN 211.1 11, AT 1 1.115 1 PEI .01 11 1211 11 1 1111 VVU.11I.,Vt 11 111 IT 11 418 IN PMFLME IV 3 ALI 00 2 AN so l ,.I IT ;o„ri :;.:; :.„i III NEAR ITT' CITTIVoij CITY OF BANGOR, MAINE Engineering Department December 1, 1961 To: The Municipal Officers Pursuant to City Council Order #158-J, passed July 229 1957 as amended, directing the City Engineer to lay out and proceed with the construction of a new sanitary sewer to serve the Industrial Park area and extending from the City Farm trunk sewer near Farm Road througb the Industrial Park area to the Odlin Road and thence to and along a portion of relocated Hammond Street, the following report is submitted. This Job was awarded to Hughes Bros., Inc., the lowest of several bidders,on Sept. 199 1957 and work was started on Sept. 23, 1957• The project was finally completed after innumerable delays, on Sept. 202 1960 with final settlement of all claims and disputes on Aug. 2, 1961. The total length of the sewer as completed consists of 8,148 feet of 18" reinforced concrete pipe, 692 feet of 12" vitrified clay pipe, 2,168 feet of 8" vitrified clay pipe, together with 30 manhole ventilators. Total cost of this project amounted to two hundred forty-one thousand four hundred sixty-seven dollars and fifty-nine cents (1241,467.59). Of this amount, 75%, or one hundred eighty-one thousand one hundred dollars and sixty-nine cents (1181,100.69) may be assessed against the property benefited. A total coat for assessment purposes based on using 12" pipe in place of the 1811 pipe has been figured and is shown ea follows: Total actual cost 0241J67.59 Savings had 1211 pipe been used 11,836.55 Total cost based on use of 12" pipe 229, 631.0�y 75% of the 1229,631.04 1172,223.26 Separate sheets are attached hereto and made a part of the report on which is shown a list of assessments based on three sep- arate determinations. The first list is based on 75% of the actual cost of the project. The second list is based an 75% of the cost of the project bad 1211 pipe been used in place of the 1811 pipe. This procedure is in accord with established policy. To: The Municipal Officers Page 2 The third list is based on the revised rate used in the supplemental report for figuring assessments on the Mildreth Street trunk sewer project. This third list is suggested as the basis for possible assessments such that the abutting owners would not be penalized by the excessive coats on the Project due to the inefficiency and ineptitude of the contractor. M accurate plan accompanies this report. pectfully su/lzaitted. Jemea L, MacLeod OSty Zineer JLM:1 Enc. INDUSTRIAL PARK TRUNK SEWER A List of Passible Assessments NORTH AND EAST SIDE Sheet 1 Based on Revised Cost Lot Based on Based on Cost Hildreth St. Name No. Frontage Total Coat 1211 Pipe Trube Sewer Paan Road to Thatcher St. Irwin Stanley Realty Corp. 252.001 $2,219.50 $2,110.71 $1,426.94 99 Farm Road Bangor, Maine vol. 1582, pale 286 1599, 27 1603, ' 334 " 1619, ' 232 1705, 53 " 1712, IT 142 City of Bangor 160.00, 1,409.21 1,340.13 906.00 Noilmark Carp. 402.901 3,548.56 3,374.62 2,281.41 12 Howard Lane Bangor, Maine Vol. 1596, page 356 7o5, 56 Along Thatcher St. Neilmark Corp. vol. 1596, 356 395.00' 3,478.98 3,308.45 20236.68 page 705, 56 INDUSTRIAL PARK TRUNN SDR A List of Possible Assessments Sheet 2 NORTH AND EAST SIDE Based an Revised Cost Based on Based on Cost Hildreth St. Name got Frontage Total Cost 12" Pipe Trmffi Sewer Along Perry Road Lydia A. Godsoe 140.32' 1,235.88 1,175.29 794.59 Belfast Road Camden, Maine Vol. 794, pegs 1557, 307 " 16039 334 Lydia A. 0odsoe & F. H. Drummond Heirs 132.64' 1,168.23 1,110.97 751.07 Vol. 885, page 467 307 " 1603, 334 Lydia A. codsce 270.00' 2078.04 2,261.47 1$28.87 Vol. 1603, page 334 Katandin Council, Inc. Boy Scouts of America 789.701 6,955.33 69614.38 4,471.65 38 Columbia St. Bangor, Maine Vol. 1189, page 329 " 1603, 334 & 98 " 1624, 369 INDUSTRIAL PARK TRUNK SEWER A List of Possible Assessments Sheet 3 NORTH AND EAST SIDE Based on Revised Cost Lot, Based on Based on Cost Hildreth St. Nems No. Frontage Total Cost 12" Pipe Trunk Sewer Frank H. Drummond Heirs 481.53' 4,241.10 4,033.21 2,726.65 Era. Roland G. Holley, Agent 91 West Broadway Ranger, Maine Vol. 611, page 390 603, 334 Lydia A. Godson 481.53' 4,241.10 4,033.21 20726.65 Vol. 611, nage 390 603, pr 334 Valerie E. Jordan, at ala 545.75' 41806.72 4,571.10 3,090.29 East Hampden, Maine Vol. 1656, page 232 Along Sewall Road Valerie E. Jordan, at els 422.00i 3,716.79 3,534.59 2,389.56 Vol. 1656, page 232 City of Bangor 508.88' 4,481.99 49262.29 2,881.52 Pearl R. Graffam E 378.50' 3033.66 3,170.25 2,143.24 124 Essex St. Bangor, Maine Vol. page 364 56, 29 3 926, " 1071, 72 " 16039 334 INDUSTRIAL PARA TRUNK SEWER A List of Possible Assessments Sheet 4 NORTH AND EAST SIDE Based on Revised Cost Lot Based on Based on Cost Rildreth St. Name No. Frontage Total Cost 12" Pipe Trunk Server Webster Ave. crosses Pearl R. Graffam D 134.54' 1,184.97 1,126.88 761.83 Vol, 636, page 369 563, 294 1071s 72 " 1603, 334 Pearl R. Greffam C 275.00' 2,422_08 2003.35 1,557.18 Vol. 636, page 369 563, 2I9yy4 1071, 72 1603, " 334 Pearl R. Draffam B 408.66' 3,599.30 3,422.86 2,314.02 Vol. 636, page 369 563,11 294 IT 926, P 47 071, IT 72 It 1603, " 334 Mary K. Bragg, et ale 695.13' 6,122.40 5,822.28 3,936.15 c/o Gerald Rudman 15 Columbia St. Bangor, Maine Vol. page 84 1849. IT 1603, " 334 INDUSTRIAL PARK TRUNK SEWER A List o4 Possible Assessments Sheet 5 NORTF AND BAST SIDE Rased on Revised Cost Lot Based on Based on Cost Hildreth St. Name No. Frontage Total Cost lY' Pipe Trunk Sewer Interstate crosses Along Perry Road Barbara Simpson 836.721 7,369.46 7,008.28 4,737.90 R.F.D. #2 Od11n Road Bangor, Maine Vol. 1154, page 118 603, 334 Along odlln Road Barbara Simpson 425.00' 3,743.21 3,559.72 2,406.55 Vol. 1154, page 118 1603, 334 Along Hammond Street Airline Motors 437.001 3,848.90 3,660.23 2,474.50 /o F. A. Finnegan 6 State St. BanguMaine Vol. 1516, page 119 Max Etaeovitz 5o0.00l 4,403.78 4,187.91 2,831.24 Houlton, Maine Vol. 1620, page 119 570, 57 INDUSTRIAL PARK TRUNK SEWER A List of Possible Assessments Sheet 6 NORTH AND EAST SIDE Based on Revised Cost Lot Basad on Based on Coat HSldreth St. Name No. Frontage Total Coat 12" Pine Trunk Sewer Barbara Simpson 50.00' 440.38 418.79 283.12 Vol. 1275, page 3498 9d3, 494 94, 221 570, PT 57 " 1578, 149 Donald A. RStholz 276.00' 2,430.89 2011.73 1,562.84 0/0 International Harvester Co. 1105 Hammond St. Bangor, Maine Vol. 1743, page 254 Walter B. Allen 309.31' 2,724 26 2,590.72 1,751.4& 76 Savage St. Bangor, Maine vol. 1603, page 240 761, tt110 M. A. Parsons & Sons Lumber Co. 230.69' 2,031.81 1,932.22 1006.28 York, Maine vol. 1795, Page 384 James A. D'Orsay 370.00, 3,258.80 3,099.05 2,095.11 Lynnefleld, Maes. vol. 1713, Page 140 Lot Name No. Farm Road to Thatcher St. Bren-Rich Corp. Vo Julius Stone 185 Norfolk St. Bangor, Maine Vol. 1609, page 260 & 259 709, 11 270 City of Bangor Earl C. Drew 127 Thatcher St. Bangor, Maine vol. 1049,page 356 " 1596, " 356 1704, " 68 City of Bangor Along Thatcher St. Penobscot Development Corp. c/o Maine Savings Bank Portland, Maine Vol. 1707, page 91 Along Perry Road Penobscot Development Corp. Vol. 1707, nage 91 INDUSTRIAL PARK TRUNK SEWER A List of Possible Assessments SOUTH AND WEST SIZE Based on Frontage Total Cost Sheet 7 Based on Revised Cost Based on Cost Hlldreth St. 12" Pine Trunk Sewer 174.50' $1,536.92 $1,461.58 - $ 988.10 32.30' 284.48 270.54 162.90 307.55' 2,708.76 2,575.98 1,741.49 248.14' 2,185.51 2,078.37 1,405.09 195.00) 1,717.47 1,633.28 1,104.18 272.46' 2,399.71 2,282.07 1,542.80 Lot Name No, Lydia A. Godsoe Vol. 1603, page 334 Katandin Council, Inc. Boy Scouts of America Vol. 1169, page 329 1603; 334 a 98 1624, " 369 Frank H. Drummond Beira Mrs. Roland B. Colley, Agent 91 West Broadway Bangor, Maine Vol. 611, nage 390 603, 334 Lydia A. Godsoe Vol. 611, page 390 603, 334 Valerie E. Jordan, at file Vol. 1656, page 232 Along Sewall Road Valerie E. Jordan, et als Vol. 1656, page 232 INDCSTRIAL PARK TRUK SEWER A List of Possible Assessments SODTH AND WEST SIDE Based on Frontage Total Cost 270.00' 2,378.04 776.70' 6,840.83 6;5o5.5o 4,398.04 481.53' 4,241.10 4,033.21 2,726.65 481.53' 4,241.10 4,033.21 2,726.65 599.03' 59275.99 5,017.37 3,391.99 918.34' 8,088.33 7,691.85 5,200.07 Sheet 8 Based on Revised Cost Based on Cost Hildreth St. 12" Pipe Trunk Sower 2,261.47 1,528.87 776.70' 6,840.83 6;5o5.5o 4,398.04 481.53' 4,241.10 4,033.21 2,726.65 481.53' 4,241.10 4,033.21 2,726.65 599.03' 59275.99 5,017.37 3,391.99 918.34' 8,088.33 7,691.85 5,200.07 INDUSTRIAL PARK TRUNK SEWER A List of Possible Assessments Sheet 9 SOUTH AND WEST SIDE Based on Revised Cost Lot. Based on Based on Coat Hildreth St. Nerve No. Frontage Total Cost 12" Pipe Track Sewer Pearl R. Graffam 1 406.95' 3$84.23 3,408.54 2004.34 Vol. 636, page 369 - 563, 294 926, 47 1071, 72 " 1603, 334 Pearl R. Graffam I 275.00, 2,422.08 2,303.35 1,557.18 Vol. 636, page 369 563, 294 926, 47 1071, 72 " 16039 334 Webster Ave. crosses Pearl R. Graff am H 275.00' 20422.06 2,303.35 1,557.18 Vol. 636, page 369 563, 294 PT 926, 47 071, P 72 " 1603, " 334 Pearl R. Graffem G 275.00' 29422.08 2,303.35 1,557.18 Vol. 636, page 369 563, 2914 926, 1071, 72 " 1603, 11 334 INDUSTRIAL PARK TRUNK SEINER A List of Possible Assessments Sheet 11 SODTH AND WEST SIM Based on Revised cost Lot Based on Based on Cost Hildeath St. Name No. Frontage Total Cost 12" Pipe Trunk Sewer The Riverside Co. 250.00' 2,201.89 2,093.95 =,415.61 c/o Roughton -Arnold Co. 1070 Henuaond St. Bangor, Maine Vol. 1 96, page 184 1603, 334 1638, 375 Along Hasesond Street The Riverside Co. 366.001 3,223.57 3,065.55 2,072.46 Vol. 1 96, page 184 K7, 47, 2122 1638, 375 Barbara Simpson 686.14' 6,043.22 5,746.98 39885.25 Vol. 11245, page 494, 221 1$00, " 232 Joseph R. & Edward J. Cianchstte 1,060.00' 9,336.00 8.878.36 6,002.22 Pittsfield, Maine Vol. page 255 7569, 297 366, 11 416 1500, 232 " 1501, " 260 S" > ryry J.J' CITY OF ^BANGOR TO THE CITY COUNCIL: to whom was referred the matter oE.... Clxsuiuil...AS.dax_d31-P...SspePi._oS..tim.lndust vial Park trunk sewer togetherwith.lints. of.. possible.. assessments _. have considered the subjeet matter of said a otand herewith submit the following reams thereon: The various recormrended lists of assessments were thoroughly discussed and the entire history of the project was completely re- viewed. From this, it 1s recommended that established policy be followed and that the assessments listed int the report based om the cost of the project had 12" pipe been used in place of the larger sizes be approved for the record except that the assessment against abutting owners who previously have been granted the right to enter the sewer shall be levied and become due when billed. The payment of all ether approved assessments to be deferred until such time as the owner or occupant requests a right of entry into the sewer at which time the assessment will be lawfully levied and shall be paid before entry is granted. As a condition for the deferment of payment, each property owner shall deliver to the City Imgineer a recordable instrument showing the smount of approved assessments as ma outstanding lia- bility against the property. Failure on the part of any property owner to deliver the recordable instrument within 60 days of Council approval shall be cause for the assessment to be lawfully levied mrd thus become payable according to law. ,tto✓� 'i`°✓ //,Z/?% REPORT of the COMMITTEE — A A�33 P CITY HANG MAINE Engineering Dep Department January 19, 196E To: The Municipal Officers On December 1, 19619 the City Engineer submitted a report to the City Council Order #33-P showing the coat of the construction of the Industrial Park trunk sewer, together with lists of possible assessments. A public hearing on the assessments was held by the City Council on Dec. 11, 1961. Following the public hearing, Order d33 -P was referred to the Public Works Committee for further study. The Public Works Committee met on January 9, 1962 with the property owners and their representatives relative to the proposed assessments. Various aspects of the problem was discussed at this meeting and the Public Works Committee voted to give the problem additional study and meet at a later date to make a final recom- mendation. On Januery 16, 1962, the Public Works Committee met again end, after due consideration, voted to recommend to the Council that the assessments against the property benefited be based on the same cost per foot front which were approved for eases sments on the Hildreth Street trunk sewer extension and that this amount be approved for the record but that the payment of these assess- ments be deferred until such time as the owner or tenant requests a right of entry into the sewer, at which time, the assessments will be lawfully levied and became payable before entry is granted, except that the assessments against owners to whom entry has been granted shall be considered lawfully levied and shall become pay- able in accordance with the law. As a tOmer who already has consideration f done shall or the deferment, An, the p City rEngineer a recordable instrument showing the amount of the approved Assess- ment AS an outstanding liability against the property. Failure on the part of any property owner to deliver the above described instrument within ninety days from the date of Council approval shall be cause for the assessment to be lawfully levied at that time and thus become payable according to law. When sewer easements were taken for the location of the Indross rivate property, that thel Park trunk sewer amount allowed for dpemegeapTr these easements was it was agreed be deducted from the assessments. Accordingly, the list show. these ed fromunts where applicable, one-half of the amount being Of the from each sl de where a owner has property on bath aides Of the looatl on. n o0,�V, //Z/ Z. TO: The Municipal Officers Page 2 Two lists Of embossments are included in this report, the first list shows the owners and amounts of assessments against those who have been granted the right of entry into the sewer and, accordingly, the assessments are hereby lawfully levied. The second list shows the owners and the mounts of assessments that are approved for the record but which are not to be lawfully levied until such time as the owner Or tenant necuesta entry into the sewer. JLM:1 aspectful aunmit �1t� James L. MacLeod City Engineer INDUSTRIAL PARK TRUNK SEWER The following list of assessments are approved And lawfully levied: NORTH AND EAST SIDE Name Pam Road to Thatcher Street City of Bangor Along Thatcher Street Neilmavk Corp. Vol. 1596, page 356 Along Sewall Road City of Reagan Along Hammond Street Donald A. Rithola c/o International Harvester Co. Vol. 17439 page 254 N. A. Persons & Sona Lumber Co, Vol. 1795, page 384 SOUTH AND WEST SIDE Farm Road to Thatcher Street Bran -Rich Corp. c/o Sulius Stone Vol. 1609, pages 260 & 259 1709, 270 Sheet 1 Frontage Assessment 160.00, $ 906.00 % 395.001 2,236.68 508.88F 2,881.52 — 276.001 1,562.84 A 230.69' 1006.28 174.501 988.10 N City of Bangor 32.30u 182.90 � INDUSTRIAL PARK TRUNK SEWER Nems City of Bangor Along Perry Road Penobscot Developmsnt Corp. Vol. 1707, page 91 Along Odlin Road Cheater & Gladys Magnuson Vol. 1608, page 81 R. Rankin Grant Vol. 1463, page 75, Vol. 1496, page, 184 Vol. 15147, page 232, Vol. 1608, page 814 Vol. 1655, page 79 The Riverside Co. C/oRoughton-Arnold Co. Vol. 1496, page 184, Vol. 1547, page 232 Vol. 1603, page 334, Vol. 1638, page 375 Along Hammond Street Joseph R. & Edward S. Cianchette Vol. 206, page 255, Vol. 759, page 297 Vol. 3669 page 4160 Vol. 1500, page 232 Vol. 1501, page 260 Sheet 2 Frontage Assessment 248.14, $1.405.09 n 272.46, 1,542.80 88.001 496.30 c. Q 192.001 1,087.19 QA 250.00 1,415.61 Vk 1,o6o.o01 69002.22 V4 t INDUSTRIAL PARK TRUNK SEWER Sheet 3 The following list of assessments are approved for the record but are net to ba lawfully levied until the owner or tenant requests entry into the sewer: NORTH AND EAST SIDE Allowance for Net Name Lot No. Proatage Assessment Easement Assessments Faxen Rd. to Thatcher St. Neilmark Corp. Vol. 1596, page 356 705. 56 Along Perry Rd. Lydia A. Godsoe Vol 7941557, page 307 " 16039 " 334 Lydia A. Godsoe & F. H. Drummond Heirs Vol. 1665, page 3067 " 16039 " 334 Lydia A. Godsoe Vol. 1603, page 334 Katandin Carroll, Inc. Boy Scouts of America Vol. 1189, page 329 1603, 334 & 98 " 1624, " 369 Frank H. Drummond Heirs Mrs. Roland G. Dolley, Agent Vol. 611, page 390 1603, 11 334 402.901 $2,281.41 $29281.41 140.321 794.58 16.00 778.58 132.64' 751.07 15.00 736.07 270.001 1,528.87 31.00 1,497.87 789.70? 4,471.65 90.00 4081.65 481.53' 2,726.65 55.00 2,671.65 INDUSTRIAL PARA TRUNK SUMS Sheet 4 Allowance for Net Name Lot. No. Frontage Assessment Emmert Assessments Lydia A. Godsoe 481.53 $2,726.65 $55.00 $2,671.65 Vol. 611, page 390 603, ft 334 Valerie E. Jordan, at ale Vol. 1656, page 232 Along Sewall Rd. Valerie R. Jordan, at ale Vol. 1656, page 232 Pearl R. Graffan Vol. 636, page 369 563, 244 926, 7 1071, 72 " 1603, 334 Pearl R. Graffain Sane references Pearl R. Graffsm S ems references Pearl R. Graff am Bane references Mary X. Bragg, at ale c/o Gerald Rudman Vol. 849, page 64 1494, 221 it 1603, " 334 Along Perry Rd. Barbara Simpson Vol. 1154, page 11 1603, . _337w 545.75' 3,090.29 80.00 3010.29 422' 29389.56 62.00 2,327.56 E 378.501 2,143.24 50.00 2,093.24 D 134.54' 761.83 17.00 744.83 0 275' 1,557.18 35.00 10522.18 B 408.66' 2014.02 52.00 20262.02 695.13' 3,936.15 75.00 3061.15 836.72' 4,737.90 196.00 4,541.90 INDDSTRIAL PARK TRUNK SEWER Sheet 5 Allowance for Net N me Lot No. Frontage Assessment Easement Assessment Along Odlin Rd. Barbara Simpson 425.00' $29406.55 $2,406.55 Same references Along Hasmmnd St. Airline Motors 437.001 2,474.50 21474.50 c/o F. A. Finnegan Vol. 1516, page 119 Max Etecovitz 500.00T 20831.24 2,631.24 Vol. 1620, page 119 1570, 57 Barbara Simpson 50.001 283.12 283.12 Vol. 1170, page 340 1245, 98 494 I94�9443, 257 It 157b, if 15789 " 149 Walter B. Allen 309.311 1,751.4.6 1,751.46 Vol. 1603, page 240 761, 110 James A. DtOrsay 370.001 21095.11 29095.11 Vol. 1713. page 140 SOUTH AND WEST SIDE Along Farm Road Earl C. Drew 307.55, 1,741.49 1,741.49 V11 ol. 1596, page 356 To 1704, 68 Vol. 1707, page 91 Along Perry Rd. 4 din1A. Godsoe INDUSTRIAL PAIS{ TRUNK SEWER Sheat 6 1,497.87 334 Allowance for Net s Name Lot.No. Frontage Assessment Easement Assessment Penobscot Development 195.00, $1,104.18 $31.00 $1,073.18 Vol. 1707, page 91 Along Perry Rd. 4 din1A. Godsoe 270.00' 1,528.87 31.00 1,497.87 334 Katandin Counall,. Inc. 776.70, 4,398.04 90.00 4008.04 Roy Scouta of America Vol. 1189, page 329 1603, 334 & 98 " 1624, " 369 Frank H. Drummond Heirs 481.53' 2,726.65 55.00 2,671.65 Mrs. Roland G. Dopey, Agent Vol. 611, page 390 603, 11 334 Lydia A. Godsoe 481.53 2,726.65 55.00 2,671.65 Vol. 611, page 390 1603, 334 Valerie E. Jordan, at als 599.03' 3,391.99 62.00 3029.99 Vol. 1656, page 232 Valerie E. Jordan, at ala 918.34' 5,2GO.G7 80.00 5,120.07 Vol. 1656, page 232 Pearl R. Graffam J 406.95' 2,304.34 44.00 2,260.34 Same references Pearl R. Graffam I 275.00, 1,557.18 30.00 10527.18 Some references Pearl R. Graffam R 275.001 1,557.18 30.00 1,527.18 Same references INDUSTRIAL PARK TRUNK SE R Sheet 7 Allowance for Net Name Lot No. Frontage Assessment Easement Assessment Pearl R. Graffam G 275.001 ;1,557.18 $30.00 ;1,527.18 Same references Pearl R. Graffem F 200.001 1,132.49 20.00 19112.49 Same references Mary K. Bragg, at ale 602.00' 3,408.81 75.00 3,333.81 V1.14894, page21 " 1603, " 334 Along Hammond St. The RivI�erside Co. 366.00l 2,072.46 2,072,46 vol. 1$473, Page 232 11 1636, " " 375 Bo ba1a Simpson245, 686.14' 3,885.25 3.885.25 page 98 1494, " 221 1500, 232 I JQ-Z.,— „o; / i \ - -- ---- i .rx _ r�_.. 595.'✓'3 Godsue i y \ ASsesSn>en! P/o� In'ousr��i,°n. f�.zh' T.zu/vK S� v✓c4 N f _- F. 2 10 v 200'