Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout1960-12-14 31-N ORDER31-N
.Street.Lanatsuction..nn...Baway.SEnaet _. _.... .......
By the City Cuanelt oftha City Of danger.
ORDERED,
TMT the attached report of the City Engineer showing the
coat of the coma truction of Reway Street between Ruck Street and
Brigham Street, a distance of 470 feet, together with a list of
possible assessments, be and hereby is accepted, and he it further
ORDERED, that a date be set for a public hearing on the pro-
posed assessments.
introduced Dec. 7, 1960
by Councilor Keith
CITY
OF
BANGOR
�p
QITEE.) (Drkra,_._._kocepting
the report
of the
City Engineer for
.Street.Lanatsuction..nn...Baway.SEnaet _. _.... .......
By the City Cuanelt oftha City Of danger.
ORDERED,
TMT the attached report of the City Engineer showing the
coat of the coma truction of Reway Street between Ruck Street and
Brigham Street, a distance of 470 feet, together with a list of
possible assessments, be and hereby is accepted, and he it further
ORDERED, that a date be set for a public hearing on the pro-
posed assessments.
IN CITY COUNCIL
Dec. 14, 1960
Public Hearing set for Dec. 28th,
tabled
IN CITY CWNCIL
Dec. 28, 1960
Taken from table, Hearing held,
PASSED
CITY CL
31-N
ORDER
mtia
__AC4$RSSdg Reaort...of City -Engineer...
for Construction of H"ey. Street_,,,
c
Introduced and filed by
30'
30'
9,50 9+0 2.50 2+0
+ N€WEY +STREET.
30'
30
1�
30'
d0'
30'
30
1+50 1+0
0.50
`
60
+ +
+
°s
h
DEPARIM:Nl
n
ro
Corey
`
-. Sea
B---_
h
V
W
s{oi�
1 ori -
m
y
Naih
., �
�a I l�rrn�P; / -
°`°
0 -°
/43
/42
/4/
m
/39
/3B
/37
/36
/35
/34
/33
132
I
I i0
PLAN No. 725
m
� m
0
P
m
40'
30
30
30
30
30'
30'
30
3°'
30
o
30'
\
40'
30
30
30
30'
30'
30
30
30
30'
30'
30
P
m
n
144
/45
/46
/47
/48
/49
/50
/51
/52
/53
/54
/55 0
M
h o
T, T d Z
-Zelds -
W4- d C
. YnIII -.Ry1w
sQ6s
40'
30
30
30'
30'
30'
30
30'
30
30'
30'
30'
l00'
30'
9,50 9+0 2.50 2+0
+ N€WEY +STREET.
40`
30'
30
1�
30'
d0'
30'
30
1+50 1+0
0.50
`
60
+ +
+
°s
h
DEPARIM:Nl
n
ro
Corey
`
-. Sea
B---_
h
V
W
40`
30'
30
1�
30'
d0'
30'
30
1+50 1+0
0.50
0w
30'
+ +
+
o+
h
DEPARIM:Nl
Corey
`
-. Sea
B---_
/tnson
V
-.Y✓
s{oi�
1 ori -
m
y
Naih
., �
�a I l�rrn�P; / -
°`°
0 -°
/43
/42
/4/
m
40`
30'
30
30'
30'
d0'
30'
30
30
30'
30'
30'
/00'
Ja'eJur M
DEPARIM:Nl
Corey
`
-. Sea
B---_
/tnson
Rd
-.Y✓
s{oi�
1 ori -
i✓Niwmr
Nl carr
Naih
., �
�a I l�rrn�P; / -
°`°
0 -°
/43
/42
/4/
/40
/39
/3B
/37
/36
/35
/34
/33
132
I
I i0
PLAN No. 725
m
� m
P
m
40'
30
30
30
30
30'
30'
30
3°'
30
30'
30'
P
m
,�.. _... 200 VC
EJTABL/SHED GRADE
- ORIC/NAL GRADE
200'Vc
4. a
N b him Olw � m O�n ro�m O mq
NNNN ml'N �N NN \.N °N
<+70 4.50 4+0 3T50 340 2+50 +25 2+0
60'
NOTE
Elevations based on rim of manlok
at sta£l on 010 on Carver J'teee£
guest side of BOek Street.
Rim elevation— /20./
NOTE
This /ott Pn9 part 0/' Fair Grounds He/ghCs
Recorded ,n Penonscot Reg,sery of Deeds
Plan Booa /2 Page /
TO ACC OmEgf2 r�WP! Of City En meer _
I --- CITY ©' BANGOR
DEPARIM:Nl
PLAIN PROFILE
.450
'+°
0.50
.25
°`°
HEWEY STREyyyyyyE------ T
Nern. V 4Yl _ •PeANfn� �,� -E
I i0
PLAN No. 725
m
CITY OF BANGOR, MAINE
Engineering Department
November 29, 1960
To: The Municipal Officers
Pursuant to Council Order No. 60-M, passed Feb. 6, 1960,
directing the City Engineer to lay out Hussy Street, prepare
plans for the construction of said street, and submit a report
showing the cost of the construction together with a list of
possible assessments against the property benefited, all
according to law, the following is submitted.
The construction of this street was completed in August,
19600 at a total cost of four thousand five hundred sixty dollars
seventy-one cents ($4,560.71). Of this amount, one third, or
one thousand five hundred twenty dollars and twenty-four
cents ($1,520.24), may be assessed against the abutting
property. A list of the proposed assessments follows:
South Side
Name Lot No. Frontage Assessment
Kamen, Nathan & Cora 1. 131-132-
P.R.of D.,Vo1.1695,page 376 133 1601 ¢258.77
Meucci, Domoniek 134-135 60, 97.04
P.R.of D.,Vol.1695,page 376
705 18
Waston, Frances et els 136-137-
P.R.of D.,Vol.i25b,page 498 138-139 1201 194..07
Johnson, Scott B.& Fredonna R. 140-141-
P.R.of D.,Vo1.1666,pege 64 142 90' 145.55
Corey, Helen M. 143 401 64.69
P.R.of D.,Vo1.1376,page 343
North Side
Millett, Annabelle M.
156 loot
161.73
P.R.of D.,Vol.1730,page
294
Stubbs, Pauline B.
155-154 60,
97.04
P.R.of D.,Vo1.1293,page
109
1370
490
setters, Willima E., Jr.
and
Coriwe
153-152 60,
97.04
P.R.of D.,Vol.1678,page
224
To: The Municipal Officers
Page 2
Name
Lot No,
Frontage
Assessment
Shielde, Sohn T. and Lillian
1$1-1$0
601
97.04
P.R.of D.,Vo1.1644,oage 183
Leas, Ida
149-148-
P.R.of D.,Vol.1260,page 41$
145-144
130r
210.24
Chapman, Clifton R.
147-146
60,
97.04
P.R.of D.,Vol.1287,Dage 363
An accurate plan accompanies this
report.
Respeotfullv submitteli,
MacLeod
/ James
City Engineer
=1:1
ALL.
CITY OF BANGOR
(TITLE.) ORDER, Accepting the Report of the City Engineer for Street Construction
on Howey Street.
By the City council of the City of Bangor:
ORDERED,
THAT the attached report of the City Engineer showing the cost of the
construction of Hervey Street between Buck Street and Brigham Street, a
distance of 470 Feet, together with a list of possible assessments, be and
hereby is accepted, and be it Further
ORDERED, that a date be set for a public hearing on the proposed assess-
ments.
CITY CE ERSCIS, M4INE
Engineering Department
To: The Municipal Officers
November 29, 1960
Pursuant to Council Order No. EO -M, passed Feb. B, 1960, directing the City
Engineer to lay out Henry Street, prepare plans for the construction of Said
street, ant submit a report showing the cost of the construction together with a
list of possible assessments against the property benefited, all according to
law, the following is submitted.
The construction of this street was completed in August, 1960, at a total
cost of four thousand five hundred sixty dollars seventy-one cents (W, SEE .71).
Of this amount, one third, or one thousand five hundred twenty dollars and
twenty-four cents (81,520.24), may he assessed against the abutting prcaerty.
A list of the proposed asseasments follows,
South Side
Name Lot No. Frontage Assessment
Kamen, Nathan E Cora 1. 131-132- 160, $255. TT
P.R. of D., Vol. 1695, page 376 133
Meucci, Domonick 134-135 SO, 97.04
P.R. of 0., Vol. 1695, page 376
" 1705, page 18
Weston, Frances at ala 136-137-138- 120' 194.07
P.R. of D., Vol. 1256, page 4% 139
U27r 4%
Iy�TM�"mr �n11 hm"Hl.r No, IN no MINN a No
mI'l; Via• u ow.:,„ b
-o a..w,.wF:.°nm. a..v�..� ....mw.., noel
I nm I
Auto.
'2M No,
INOT
It, V., 1371 NNNI
113
op
If Ir
to
P.R. of D., Vol. 1287, page 363
An accurate plan accompanies this report
Respectfully submitted,
James L. Mactecd
ak
Lot Nn.
Frontage
Assessme
Johnson, Scott B.
& Fredonna H.
140-141-142
90'
$145.55
P.R. of D., Vol.1666,
page 64
Corey, Helen M.
P.R. of D., Vol.
1376, page 343
143
40'
64.69
NORTH SIDE
Millett, Annabelle
M.
156
100'
161.73
P.R. of D., Vol.
1730, page 294
Stubbs, Pauline
B.
P. R. of D., Vol.
1293, page 109
155-154
60'
97.04
.1
1370 490
Vetters, William
E., Jr. and
Corinne
153-152
60'
97.04
P.R. of 0., Vol.
1678, page 224
Shields, Jahn T.
and Lillian
151-150
60'
97.04
P.R. of D., Vol.
1644, page 183
Less, Ida
149-148-145-
130'
210.24
P.B. of D., Vol.
1280, page 415
144
Chapman, Clifton
H.
147-146
60'
97.04
P.R. of D., Vol. 1287, page 363
An accurate plan accompanies this report
Respectfully submitted,
James L. Mactecd
ak
CITY OF BANGOR
PU is NCTICE
Notice is hereby given that there to petal" befae tb City Coeoekl of the City sP
Bangor, Wine the following Orders
Emmmi— a ,
A Public Nearing will he hold in the Council Race, City Hells %"we Helens Deeeeba 48,
1960 at BBDO o'clock P.R. All persons for or against the epfeasl of We Coda ay M
heard, if they desire.
PER ORDER CITY COUNCIL
Dec. 17, 1960 ley E. Alley, City Clak