Item/Subject: Accepting City Engineer's Report - Final Cost of State Street
Sewer Extension
ResPoneible Department: Engineering
Commentary:
This Council Order represents the final report of the City Engineer
n the actual coats of extending the sanitary Sewer n Outer Stet,
Street, as previously authorized by Council Order No. 90-171. Stare
law requires that we hold a public hearing with regard to the proposed
assessments, so that the Order should be tabled, referred to the
Finance Committee, and advertised for a public hearing to Be held
an November 25th.
Ihpert mHmd
hlenegeri Comments:
Gy AlewBer
Associated Information:
Budget Approval:
m ee Dear
Legel Approval ,
�dln5 ry sou.na
Introduced For
O Passage Page _ o(_
First Reading
Refeaal tR f.,•w,ts.
92-]
Aedaned b Commdor Cohca, November 13, 1991
CITY OF BANGOR
(rITEE.) (®rb9r Ac eRting city_Engineer's Report.., final coat.. of State -Street
Sewer Extension
By the ME CouMl of My ofBaaytr.
5111) N!t A I)1
TUT the attached report of the City engineer showing the actual coat
of extending the sanitary sewer in a northerly direction on State Street for
a distance of 335 feet north from Young Street be and hereby is accepted; and
be It further
ORDERED. TMT the assessments for said sever construction be levied as
noted therein.
IN CITY COUNCIL
November 13, 1991
Referred to Fiestas Committee
c1Tx RR
In City Cowcil November 25.1991
Public Hearing was Had
Order Passed
City un's
92-1
ORDER
Title,
Acceeting Ci[y BnSineec s Repox[
Final Cost of State Street Sewer Extension
..T-L�CC uj Q etAmigmad to
Cowcilman
I
CITY of BANGOR, MAINE
Engineering Department
October 30, 1991
To the Municipal Officers:
Reference Is made to City Council Order No. 90-171 passed April
23, 1990, authorizing the extension of the sanitary sever on outer
State Street, in accordance with a petition received from Fred Gallant,
the owner of property located at 1004 State Street. All work has bean
completed, consisting of the following:
The extension '.consisted of the installation of 335 feet of S'.' pipe
and one manhole. extending north from an existing manhole in the inter-
section of Young Street. The total actual cost of the sewer extension
e $13,410.00, which compares favorably with the original estimate of
$13.200.00. Under the original agreement, the cost would be split
equally between Molly Dither, the owner of the property at 1000 State
Street, and Fred Gallant at 1004 State Street, which would amount to
an sant of $6,705.00 against each of the properties. Under the
terms of the original Council Order, the assessments would be levied
e
upon completion of the a Construction Andt
the acceptance of a final
report to the City Council from the City Engineer.
It is recommended that the sewer assessments be levied as noted
above.
Respectfully submitted,
JTF:lkp John T. Frawley,
City Engineer