Loading...
HomeMy WebLinkAbout1989-06-12 89-266 ORDER89-266 AoupedtoCamedor Stone, lure 12,. 1989 CITY OF BANGOR (mom) WTlberp ,,,,,,,,,,,,,,,,, Approving. Final Plat -. Revision to_Bangor ...,,,, By City C&mW of Me City ofBammw:' ORDERED. THAT the final subdivision plan for a revision to Bangor Mall Subdivision (Lots 17A and 16A). being. located on Bangor Mall Boulevard, having been reviewed by the Planning Board and found to be in general conformance with local subdivision laws and State of Maine Statutes, Title 30, Section 4956, be approved, subject to meeting the requirement for the provision, of. improvement guarantees in accordance with the provisions of Chapter XII, Article 8, of the Laws and Ordinances of the City of Bangor. 89-266 ' 0RLER Title, -. A(gxovin9 Fv l Plat Re Vision to .................... 4.................. earner mall Subdivision In City Cffi cil June 12.1989 - ; ........................ ....................... Passel 6;�.d�� Aerigned w C1tY ':........h ' ' :Y.4�d^: C. ...... Councilman CIT! OF &NNOOR APPLICATION FOR PAUL PLAT APPRJVAL RATE: 5-I8-89 MANE OF SOBDIVIEION: Bangor Mall NM OF APPLICANT: Banmak Associates APORESS: C 0 James C. Inch, 113 Center St., Bangor ME .04401-5006 TMLBPE0116: 94)-0191 NAME OF ENGINEER OR IAMD RUMOR PREPARING PLAN: LATE CF PRAT APPmVAL: February 26, 1979 FINAL GENERAL INPONMATIIN: - - • 10TAt. ACREAGE: 15.18^ NNPBMR OF LM OR DRUM: 2 M WEI C2 LIST AMI MAJOR CRAN" W TNLB PIAT SIN M IT ®CMIPEp NIVAL: FINAL nis plan amends Lot 16 into Lot 16A and Lot Ids $15.00 ADVERTISING FEE MYNATO$ • Lots 16 and 17 only 89-266 ItN. : Pinai Subdivision Approval Bangor Mall Boulevard - — Banmak Associates a. Applicant requests final plan approval for as3 i n to the approved subdivision plan for Lot 16 and 17 onthec of Bangor Mall Boulevard and Hogan Road in a Commercialo2 Zone. Ii. The proposal redistributes the land area between the. two lots creating a 6.89 a and 8.3 acre Both lots meet the frontage and area requirements of the C-2 Zone. C. The second element of this subdivision is the access to the parcels. The traffic study prepared! by VMI -Maris for Banmak proposes the access road be aligned with the Mid Mall en- trance �ignalized. - trance�aignaliaed. The_eropasal submitted indicates additional turning lines on Bangor Mall Boulevard and some redesign to the Hogan Road intersection. d.The Planning office and the City Engineer's Office have reviewed the preliminary traffic report and proposed im- provements to Bangor Mall Boulevard. Staff is concerned that this proposal may net be in the best "long-term" inter- est of Bangor Mall Boulevard. The Concerns are due in part to the close proximity of the n signal to. the Hogan Road/Bangor Mall Boulevard intersection and the limited analysis of the Service Merchandise thru road's impact. a.' Staff would recommend that this item be continued. 09-A314. v 5uro .6EFEX: TOCITY9ANGDR EP:E„e'Ew RL `19169 78 — fle pp \ LOT 18 n 1 LOT 16A \ \ p 6.306= 16A I I AREA OF SLOPE IS GRADING RIWS 100 YEAR sLowLAmi R 0I3Mo� V n LOT 19 17A ]P E LOC 174, TRI 6.6998 AC. 09-A314. v 5uro .6EFEX: TOCITY9ANGDR EP:E„e'Ew RL `19169 78 — fle pp \ LOT 18 n 1 LOT 16A \ \ p 6.306= 16A I I AREA OF SLOPE IS GRADING RIWS 100 YEAR sLowLAmi R 0I3Mo� V n LOT 19