HomeMy WebLinkAbout1989-05-22 89-232 ORDERDate wog" 5/22/89 Item No. 89-232
Item/Subject: Authorizing City Engineer to. Negotiate for Inspection Services -
Heedowbrock Sewer Project
Responsible Department: Engineering
Commentary:
A proposal was
received from Wright -Pierre, the Engineering Consultants
n the design of project, for construction 'administration and -
inspection services, . which was in excess of $310,000.00. The engineering
Departnent feels that It can provide these services, using local inspectors,
for lees than $100,000.00.
Deynm nr Heed
Manager's Comments: -„l.{-�l A /�) 1 _^^� V� (a, %.J,z
�NMlW11_ 1/lMr..,wUu_p,Wu Ita/.�n1 ilA.WUA0., mbrt.'_ °'.1' r.`lLD
ggp..ae+X,.°�aU:,_PwFt✓,< .a�d�.� S�i�.
CirY Mawgv
Associated Information: 0 -
Budget Approval:
fine .. Di”
Legal Approval:
Cis Salicins.
introduced For
,W Pasu ge
❑First Reading Page_ o(_
❑ Referral
89-232
Amigned to CommcHor Shubert, May 22, 1989
i CITY OF BANGOR
(TITLE.) (Orbe;, Authorising city Engineer to Negotiate for Inspection Services -
Neadombrook Sewer
By W qty Cousin of do C19p of Bemuse:
ORDERED,
THAT , wBERBAs, the City of Bangor Is undertaking the construction of the
Meadowbrook Sewer project, a =jet project which will require extensive
construction inspection services; and
WHEREAS, it has been determined that the most Cost-effective and feasible
alternative for inspection services is to negotiate contracts with local
inspectors:
NOW, ITERBFORE, Be It
ORDERED, TRAT the City Engineer be and hereby is authorized to negotiate
for B:.Rpa.¢H2nt Enginen to provide Inspectionservices, not to exceed $32,000.00
v
plus overtime, and to hire such other additional temporary inspection help a
may be required, the costs of which are to be charged to the Meadowbrook Sewer
capital construction account.