Loading...
HomeMy WebLinkAbout1989-05-22 89-232 ORDERDate wog" 5/22/89 Item No. 89-232 Item/Subject: Authorizing City Engineer to. Negotiate for Inspection Services - Heedowbrock Sewer Project Responsible Department: Engineering Commentary: A proposal was received from Wright -Pierre, the Engineering Consultants n the design of project, for construction 'administration and - inspection services, . which was in excess of $310,000.00. The engineering Departnent feels that It can provide these services, using local inspectors, for lees than $100,000.00. Deynm nr Heed Manager's Comments: -„l.{-�l A /�) 1 _^^� V� (a, %.J,z �NMlW11_ 1/lMr..,wUu_p,Wu Ita/.�n1 ilA.WUA0., mbrt.'_ °'.1' r.`lLD ggp..ae+X,.°�aU:,_PwFt✓,< .a�d�.� S�i�. CirY Mawgv Associated Information: 0 - Budget Approval: fine .. Di” Legal Approval: Cis Salicins. introduced For ,W Pasu ge ❑First Reading Page_ o(_ ❑ Referral 89-232 Amigned to CommcHor Shubert, May 22, 1989 i CITY OF BANGOR (TITLE.) (Orbe;, Authorising city Engineer to Negotiate for Inspection Services - Neadombrook Sewer By W qty Cousin of do C19p of Bemuse: ORDERED, THAT , wBERBAs, the City of Bangor Is undertaking the construction of the Meadowbrook Sewer project, a =jet project which will require extensive construction inspection services; and WHEREAS, it has been determined that the most Cost-effective and feasible alternative for inspection services is to negotiate contracts with local inspectors: NOW, ITERBFORE, Be It ORDERED, TRAT the City Engineer be and hereby is authorized to negotiate for B:.Rpa.¢H2nt Enginen to provide Inspectionservices, not to exceed $32,000.00 v plus overtime, and to hire such other additional temporary inspection help a may be required, the costs of which are to be charged to the Meadowbrook Sewer capital construction account. �m 0ROER Title, waitvareJ City My toIFC� s: n 'm�vi�Rmb.......a Pmxt ...................................... mdQ Couneilaan