HomeMy WebLinkAbout1989-04-24 89-185 ORDERDate April 26, 1989 Item No. 09-185
Item/Subject: bisecting City Meneger to Sign Memanendum of OMerstaMing with
MOT - Ohio Street Railroad Crossing - -
Responsible Department Engineering
Commentary:
This matte[ has been pending since late a and will provide for the
reconstruction of the existing railroad using on Outer Ohio Street,
including street reconstruction and new signal work. The City's share
Of the project is 5%, estimated to be$7.250.00.
penmer 27
Managers Comments:7.z A.
_ _... ..6 .)-k
'"{�
Cily Mamgn
Associated Information:
Budget Approval:
F111111 Dn"
Legal Approval:
Cny SUSS, or
Introduced For
®Passage
L�First Reading Page_ of
❑ Referral
89-185
Assigned to Couneflor England, April o 24, 1989
CITY OF BANGOR
(TITLE.) &-bei, ni eecting City Manager to Sign e. Memorandum of understanding.
with MOT Ohio Street Railroad Cross
........ ..... ... .....
Be the City Council of the City ofBaapar.
ORDERED,
TRAT the City Manager be and hereby is authorized to sign a Memorandum
of Understanding with the Maine Department of Transportation, a copy of which
is attached, for the reconstruction of the Bangor 6 Aroostook Railroad
crossing on Ohio Street, together with .the upgrading of the efgas3ng signal.
STATEMENT OF FACT:
The total estimated coat of this work is $110,000.00, which includes
$75,000.00 for the crossing reconstruction and $35,000.00 for the signal
work. The City's share of the project is estimated to be $7,250.00, to be
matched by the Bangor b Aroostook Railroad Co., with the remaining 90%
to be paid for with Federal foods.
89-185
O AGER
IN CITY COUNCIL
April 26, 1989 Title,
eeesea
est [� .Dixeccine.Ci[r. Manages. [v. Slgp. a. tleewtavdum
Liar CLEM of Ooderstavding with EWT - Ohio
Scree[ Railroad Crossing.
....
AeeipiW to
...�....�..� .. ...unci.....
^""'C � Councilman
89-185
MEMORANDUM OF UNDERSTANDING
Between the
STATE OF MAINE
and the
CITY OF BANGOR
Regarding
Federal Aid Project No. RRS-RRP-OOOS(127)
PIN 3896.00
WHEREAS a project to update the automatic warning devices and recon-
struct the railroad crossing on Ohio Street in Bangor located 0.41
mile northwesterly of Bunker Lane is included in the Railroad -High-
way Grade Crossing Safety Improvement Program contingent upon 5% of
the cost of all crossing reconstruction and 10% of the cost of all
signal work being provided by the local community, and;
WHEREAS it is necessary for the STATE OF MAINE, acting by and
through its Department of Transportation, nereinafter referred to as
the Department, and the CITY OF BANGOR, hereinafter. referred to as
the City, to agree to a coordination and reimbursement procedure for
this project, and;
WHEREAS the City must indicate its commitment to this project by
signing the original copy of this Memorandum in the spaces provided
and returning it to the Maine Department of Transportation, Bureau
of Project Development, State House Station i16, Augusta, Maine
04333, Attn: Richard A. Coleman, Chief Engineer, prior to the ad-
vancement of preconstruction activities;
NOW THEREFORE, on this day of , 198 , the
parties agree to the coordination and reimbursement procedure for
_.
this project as follows: --- — —
MEMORANDUM OF UNDERSTANDING
RRS-RRP-OOOS(127)/PIN 3896.00
Form Ed. (RH) 8/9/88
Page 2 of 5 Pages
A. DEFINITIONS
1. PROGRAMMED COST: The cost of the project as estimated during
the planning phase. This amount is intended for planning
purposes only since it is based upon preliminary informa-
tion. The Programmed Cost of this project is $110,000, which
includes $75,000 for crossing reconstruction and $35,000 for
signal work. This will be updated based upon a detailed
estimate once the project development process is complete
prior to commencement of construction.
2. TOTAL COST: The cost to construct the project, which includ-
es in addition to construction items, all engineering and
right of way costs necessary to satisfactorily complete the
project.
3. LOCAL SHARE: The local share of the .total cost of the pro-
ject to be paid by the City is 5% of the cost of all crossing
reconstruction and 10% of the cost of all signal work.
4. FEDERAL SHARE: The federal participation rate for chis pro-
ject is 90%, therefore, she non-federal share for this pro-
ject can be figured at the rate of 10%.
B. REIMBURSEMENT
1. Prior to the advancement of the project development process,
the City shall forward a signed original copy of this Memo-
randum to the Department. The Department shall sign, date
andreturna copy to the City.
2. Upon completion of the project development process, the De-
partment shall enter into an Agreement with the Bangor and
Aroostook Railroad, hereinafter referred to as the Railroad,
regarding construction of the project and detailing the cast
of such construction.
MEMORANDUM OF UNDERSTANDING
RRS-RAP-OOOS(127)/PIN 3896.00
Form Ed. (RH) 8/9/88
Page 3 of 5 Pages
3. Upon receipt of a detailed estimate from the Railroad, the
Department shall notify the City of the local share due to-
wards the total cost of the project.
4. The local share of the total cost of the project shall be due
and payable prior to the commencement of construction.
5. Upon payment of the local share, the Department shell author-
ize the Railroad to begin construction of the project. The
Department shall NOT authorize the Railroad to begin con-
struction of this project UNTIL the local share is paid.
6. Upon completion of construction and receipt of final quanti-
ties from the Railroad, the Department shall make a final
determination of the total cost of the project based upon
such quantities with any corresponding adjustment in the
local share being made at that time.
a. if as a result of such determination the local share is
found to be underpaid, the City shall pay to the.Depart-
ment the total amount of such underpayment.
b. If as a result of such determination the local share is
found to be overpaid, the Department shall refund to the
City the total amount of such overpayment.
y. The City shall also be responsible for the non-federal share
of any additional cost resulting from extra work or change
orders requested by the City during the construction phase of
CM1e project.
MEMORANDUM OF UNDERSTANDING
RRS-RRP-OOOS(127)/PIN 3896.00
Form Ed. (RH) 8/9/88
Page G of 5 Pages
C. PROJECT TERMINATION
1. The Department and the City hereby retain the right to term-
inate the project at any time prior to the authorization of
construction. It is expressly understood that this project
will NOT be terminated by the City subsequent to the author-
ization of construction WITHOUT first obtaining the approval
of the Department.
a. In the event the project is terminated at the request of
the City prior to the completion of construction, the City
shall become responsible for the entire non-federal share
of the total expenditures incurred against the project at
the time of such termination.
b. In the event the project is terminated by the Department,
the Department shall become responsible for the entire
non-federal share of the total expenditures incurred
against the project ac the time of such termination.
2. The project may be terminated by mutual consent of the par-
ties hereto, in which event, the City shall become respons-
ible for the local share of the total expenditures incurred
against the project at the time of such termination in ac-
cordance with the terms set forth in Paragraph A.3 above, and
the Department shall become responsible for the balance of
the non-federal share of the total expenditures so incurred.
MEMORANDUM OF UNDERSTANDING
RRS-RRP-OOOS(127)/PIN 3896.00
Form Ed. (RM) 8/9/88
Page 5 of 5 Pages
D. APPROVAL
1. This Memorandum becomes effective upon approval and signature
of the partieshereto.
2. By the Department on 19
MAINE DEPARTMENT OF TRANSPORTATION
Dana F. Connors, Commissioner
By:
Richara A. Coleman
Chief Engineer
3. By the City on 19
CITY OF BANGOR
By:
Edward . Barrett
City Manager