Loading...
HomeMy WebLinkAbout1988-12-28 89-35 ORDERtouncilArgon Date 7/9R/aa Item No. 89-35 Item/Subject: Directing City Engineer To Do Cost Study - Renduskeag Interceptor Sewer Extension Responsible Department Engineering Commentary: The Totter Trailer Park, located on Einaon Road. is presently served by a private sewage disposal system. Since the City sewer system ends at Pusham Road, It would be necessary to extend the Renduakeag Stream Interceptor Sewer for a distance of approximately 2,000 feet, across three properties, which mould also benefit by the sewer extension. The Developer bas been advised that there is no guarantee of City participation in the cost at this time. �' .'lZrwiTt-y pepnmmrHnd Managers Comments;�1 1 too U 1�0 4i��.`Wil Ciry Mnvgn Associated Information: budget Approval: £iv ttOi Legal Approval: Introduced For ®Passage ❑ First Rmdfng Page _ of— El Referral Ae®goad to ('uiu¢ilot Tilley, Decemberr 28, 38. 1988 CITY ` OF BANGOR (TITLE.) (Orbtri PSecti g City epg p To De COst,RtadY..7 Eenduakaag Pncercapmr By Lhe Oily � of 04 Cita ofBcnown. ORDERED. - - MT the attached petition from Fmea Engineers, representing Paul Pray of Bangor, requesting a cost study to extend sanitary sewer service to the Dozier Trailer Park on Pinson Road be and hereby is accepted; and be it further ORDERED. THAT the City Engineer conduct the necessary a eye, prepare preliminary plan and cost estimates, together with a list ry of possible assessments, and report his findings to the City Council for further action. E9-35 19 CITY COUNCIL _ 0 R D E R 'r December 28, 4988 `peisea,,: Title, Z 0 w-e— Directing City Engineer To Do Cosa study xTy CLERIC .................... 4................. - Kinduskeag Interceptor Sever Extension ...................................... G.t AmAgmed,n rt ....... ao;ntii>nan