HomeMy WebLinkAbout1990-06-25 90-250 ORDERData E. Ts" 7S 1990 Item Na, 90150_,
IVarMbiect:"therizing the Extension of the Sanitary Sewer on Enter proceed Street
to the Martel Mobil Name Park
Responsible Department: Enginepeing Department
Commentary; A petition was received last fall from Marmara Martel requesting that
the sewer be extended be serve the Martel Mobil pose Park on cuter Hammed Street.
This was prompted by inspections by DEP and the CSSy)Code Enforcement Officer
wherein it was discovered that a potentially serious health problem exist due t
malfunctioning septic system which serves the Mobil Home Park.
It is recommended that this project be undertaken as soon
as possible. Mr. Marte
has agreed to pay the total construction cost up -front, to be paitdaliy..reim-
horsed by other adjacent properties which will also benefit.
it
OePen rat Hut
Manager's Comments:
[tW.`e70.W134 n�an"A4s,tol+
dLCM
V
' Ciy Manger
Associated Information, 0 a4"t
Budget Approval: k; .¢
n;.or
Legal Approval:
alawl ^X C;y 0M1 Sor
Introtluced For
�Paszage
❑First Reading Page —of
❑ Referral
90-250
AWMppsd roC0ua fl0r Blanchette, June 25, 1990
CITY OF BANGOR
(TITLE.) (jDrbgrf Aytho 1 i R the Exp,ension mf tks aaa4mry seiner on enter Hammond
Street to the Martel Mf it Hom, Park
By the City CoyrwM of the Cky NBaWx:
ORDERED,
THAT the attached report of the City engineer, shoving the estimated
oat and recommended assessments for the extension of the sanitary sewer
on Outer descend Street for a distance of approximately 1,100 feet to the _
Martel Mobil news Park be and hereby is accepted; and be it further
ORDERED,.:..
THAT said construction begin as soon as possible after x eeipt of
payment from Norman Martel In the amount of $50,000.00 to cover the cost
of construction; and be it further
ORDERED,
THAT the City Engineer submit a final report to the City Council upon
completion of the construction, showing the actual costa of said construction.
90-250
1N CITY COUNCIL - 0 R 0 E R
June 25. 1990
Title.
Authorizing the 6 teneiov of the Sanitary
CITY gLERK ...............................
Sebe[ on Outex Re®and Street [o [M1e Na[[¢1
Mobil Rome .Park
...
..................................
G.
Rw
Aesigned to
...... a r � ............
Councilman
CITY OF BANGOR 90-250
Engineering Department
June 7, 1990
ijj tMeIMmgp3Rel,yQ£Y1Fi46F.ReEetan<e=+,Is made to City Council Order No. 89-418
passed October 23. 1989, directing the City Engineer to complete aost study
a
for the extension of the sanitary a outer Raymond Street to the
Martel Mobil Home Park, answer to petition from Norman Martel, the
of the Mobil Home Park. all s veys, plan and coat estimates have
been completed, and the proposed project would be described as follows:
The installation would consist of 1,100 feet of 8 inch sanitary sewer and 4
manholes extending in a northeasterly direction from the existing sanitary
sewer located On the westerly Bide of the Hammond Street Bulge to outer
Demand Street, adjacent to the southerly property line of the V.F.W. Hall.
The total estimated .cast of the sewer installation Is $50,000.00, and the
proposed tirxxkdbwnoLraw asmen4ylbeae0 upon the number of building units
served. Is as follows: aP
Name 6 Location
Proposed Assessment
Response
Martel Trailer Park.
$30,000.00
In
favor, up -front payment
1335 Desmond Street
Dominic LaChance
3,000.00
Opposed
1337 Hammond Street
Blanche Barr
3.000.00
opposed
1408 Haumond Street
Veterans of Foreign Wars
3.000.00
In
favor of assessment upon
1368 Hammond Street
completion
Bertille Hartel
3.000.00
In
favor, up -front payment
1336 Hammond Street
Charles Mason 4,000.00 In favor of assessment upon
Desmond Street Bulge completion
Sidney Epstein d Kenneth Korean, 4.000.00 Opposed
Trustees of yranevay Realty Trust
The extension of the Public sewer as described above is necessary to abate a
serious health problem created by amalfunationing septic tank system which serves
the Martel Tiailer Park: bath the Department of Environmental Protection and the
City Code Enforcement Office have been closely monitoring the situation, and
have advised Mr. Martel that the Trailer Park must be connected t0 the City
sewer system as soon as possible.
Mr. Hertel has agreed to pay the entire $50.000.00 up -front, prior to the start
of construction and both the V.F.W. and Charles Mason have agreed to pay their
share upon completion of the construction, which would be reimbursed to Mr.
Martel. It is recommended that deferred assessments be placed against the other
properties, consisting of a Subordinate Agreement to be recorded in the
Penobscot Registry of Deeds, to remain in effect until sever entry is requested.
Municipals Officers
June ], 1990
Page 2
but no longer than teWyearg, at which time the assessments would be levied, with
10% annual interest added to the unpaid balance during that period. Each of these
asseswments, when paid, would tlf reimbursed to Mr. Martel, including the accrued
Interest.
It Is recowoended that the sewer
extension be constructed as soon s possible
atter receipt of payment from Mr. Martel.
Plane showing the proposed sewer installation are on file in the Office of the
City Engineer.
Respectfully submitted.
-Cahn��y
City Engineer
,
CTT/ctg