HomeMy WebLinkAbout1990-04-23 90-162 ORDERCouncil Nation
Date 6/23/90
I;em No. 90-163
to m/Subjece Application for Utility location
Permit Bangor Hydro
Electric Company
Retpomible DepartmenC
City Clerk
Commemerfr:
Application for Utility bocatlon Permit - Bangor
Hydro -Electric Company
Boyd Street approx. 36 feet southeasterlyfrom center line of York St.
one pole
York Street, from approx. 191 feet southwesterly
of junction of Boyd St.
southwesterly me poles.
York Street, from approx. 32 feet southwesterly
of junction of Essex St
southwesterly one pole.
No public notice of this application to be made.
Dere e:%e:
Manager's Comments:
Ory M.vler
Associated InlormatiOnbj.
Budget Approrel: JA .
T./'.e Do
Legal Approval: elh-
City Sat ..:or
Introduced For
O passers
First Fear) no Page _ of
C: Referral
90-162
AmAgnedbe Councilor Blanchette, April 23, 1990
CITY OF BANGOR
MUD (Drbr i.......... .Apkli tine for utility Location permit Bangor Hydro
By tAe aN Counpi! pffAe GSN KBanoar:
ORDERED,
TEAT the attached application for utility location permit is hereby
granted upon condition that the poles be numbered.
NOTE: Following are the public streets and highways referred to:
Boyd Street, approximately 36 feet southeasterly from centerline
of York Street.- one pole. - I Pale
York Street, from approximately 191 feet southwesterly of the
junction of Boyd Street, southwesterly - two poles. -2 Poles
York Street, from approximately 32 feet southwesterly of the
junction of Essex Street, southwesterly - one pole. -1 Pole.
No public notice of this application to be made.
IN CITY COUNCIL
April 23, 1990
Passed Councilor Cohen abstaining
Q. r Melo..__
—CITY CLERK
90462
Title,
AppllcaClau Eor Utility Location
.......... .....
Permit - Bangor Bydro-Electric Company
.. Boyd. Street... York.L..........
Aosired to
Gd
Councilman
April 13, 1990
Mr. Russell McKenna
Bangor City Clerk
73 Harlow St.
Bangor, MH 04401
Dear Mr. McKenna
Enclosed are our application and pole permit forms for
locations in Bangor.
When approved by a majority of the municipal officers or by
an authorized representative, please return those forms marked
'OBHB COPY", to the return address noted below, signed and dated
with the recording data, and attested by the Clerk.
ry/Very truly yours,
R. L. Averill
Transmission and Distribution
Sob Coordinator
RETURN ADDRESS AS.FOLLOWS:
R. L. Averill
T 6 D Sob Coordinator
Bangor Hydro -Electric Company
P.O. Box 932
Bangor, Mine 04401
Encl.
fid- is s -
FORM
432A
IBANGOR0037
APPLICATION
FOR UTILITY LOCATION PERMIT
APPL. 8 513
TO:
Bangor
City Council
- City of Bangor
BANGOR HYDRO -ELECTRIC COMPANY, a Maine corporation being duly
authorized pursuant to the laws of the State of Maine to generate,
sell, distribute and supply electricity in the City of Bangor,
County of Penobscot, State aforesaid, hereby applies for a permit to
authorize it to locate, construct, maintain and operate certain of its
facilities hereinafter described upon, along, over and across certain
public ways situated in
said City of Bangor.
No public notice of this application will be made in accordance
with the terms and conditions of Title 35-A, Section 2503, MRSA as
amended.
LOCATION
BOYD STREET, approximately 36 feet southeasterly from centerline of
YORK ST. - one pole.
YORK STREET, from approximately 191 feet southwesterly of the
junction of BOYD ST.,southwesterly - two poles.
YORK STREET, from approximately 32 feet southwesterly of the junction
of ESSEX ST., southwesterly - one pole.
DESCRIPTION
The facilities will consist of a line composed of wood poles and
supports therefor, c and/or cables together with
associated appurtenances. Thew
minimum clearance of the wires and/or
cables, other than guywires, will be at least eighteen feet over the
public way. The poles will be set within the limits of the public
ways but outside the part thereof customarily used for travel by
vehicles. The initial operation of the facilities will be at 12470/7200
volts, three phase; the voltage will be increased as occasion
therefore requires for the operation not in excess of 20 " to ground.
Dated at Bangor, Maine GgAy OR �� DROTEpECTRICa P Y
an April 13, 1990. By: �1{�IOX�RWY� lJ7�l J V\
Robext L. Averill
Transmission and Distribution
Sob Coordinator
UTILITY LOCATION PERMIT
the application of BANGOR HYDRO -ELECTRIC
90-162
1BANGORO037
APPL. 4 513
ANY dated
Of its
across certain
of the facilities described in said application, said written
objection to state the cause of the objection and to be served by
delivery in hand or byregisteredor certified mail.
LOCATION:
BOYD STREET, approximately 36 feet southeasterly from centerline of
YORE ST. - one pole.
YORE STREET, from approximately 191 feet southwesterly of the
junction of BOYD ST.,southwesterly - two poles.
YORE STREET, from approximately 32 feet southwesterly of the junction
of ESSEX ST., southwesterly - one pole.
DESCRIPTION
The facilities will consist of a line composed of wood poles and
supports therefor, c and/or cables together with
associated appurtenances. The ms
m clearance of the w and/or
cables, other than guy wires, will sbeat least eighteen feet over the
public way. The poles will be set within the limits of the public
way, but outside the part thereof customarily used for travel by
vehicles. The initial operation of the facilities will be at 12470/7200
volts, three phase; the voltage will be increased as occasion
therefore requires for the operation not in excess of 20 EV to ground.
Authorizing signature(s)
Received and Recorded in
Book Page
on 9_
Attest:
Clerk of
Dated at ,ME,
This Day of ,19
1BANGOR00)
PLAN 4513
BANGOP. 4-3-90
PLAN `9�