CITY OF BANGOR
(TITLE.) MrDBr,..... ..... Authorizing ..Payment. for Sewer Easement, to Bangor.,
Hydro at Sewage Treatment Plant.
BY to Cam Coawit of Ne City ofBaftOn
ORDERED.
THAT the sum of $4,000 be paid to Bangor Hydro Electric Company
for a Sewer easement across B.N.E. land located adjacent to the Waste-
water Treatment Plant to permit the installation of various under-
ground pipes required for the construction of the new secondary
:treatment plant
In City Council August 1211991
Suspension of the Rules Passed
Order Parsed
Cyna}lor Cohen Abstained
CJ e¢ OmcAoz�,
City Clerk
91-322
Authorisirg Payment for Sauer Easement
to Banger gvdro at Seg s Treatment Plant
CITY OF BANGOR, MAINE
Engineering Department
MEMO August 6, 1991
To: Members of the Finance Committee
From: John T. Frawley, City Engineer
CC: David N. Pellegrino, Purchasing Agent
Edward A. Barrett, City Manager
Subject. Easement Acquisition from Bangor Hydro -
Secondary Treatment Plant Site
The Bangor Hydro owes
a piece of land between the existing
Primary Treatment Plant andthe new Secondary Treatment Plant o
lower Main Street, a portion of which is occupied by an existing
electrical substation. As part of the Secondary Treatment Plant
construction, six pipes, varying inra from 1 inch to 48 inches
need to bee c
ended a the Bangor Hydro land between the new
and the old plant, as shown on the attached sketch.
I had Opinions of Value prepared by two appraisers, Ted
Sherwood and Walter Poster. which both indicated a land value of
approximately $1.00 per square foot. rhe pipes encumber approxi -
rely 3,200 square feet of land area,
which indicate a damage
payment of approximz rely $3,200.00 In addition, Bangor Hydro
will be preparing the formal Easement Agreement, and have had
extensive the effect of the pipes o their property by
theirEngineering Department. a
1n that respect I have ended
paymenc of an additional $800.00 for administrative, legal mand
engineering fee making a total recommended payment of $4,000.00
for the Easement.
It should be pointed out that Bangor Hydro was
initially
negotiating to have a call a duct bank from thesubstation t
Main Street in lieu of damages, which would have coat $36,000.00.
In this respect, I would request the Committee's approval to pay
$4,000.00 for the Easement, which is needed Immediately to prevent
a delay in the installation of the piping.
Enc.
_.—_ _.—._i --c
BRE RO
VOL 133
P4o
SUBSTATION
�J
NSF BANGOR RYDRO ELMM -
PRD VOL 1334 P48Z
EXHIBIT -A
1 -- I"
SODIUM BISULFITE
4.5' To TOP ft
..........
2 --5"
WP AC IVPTE9 SLUDGE
4.5•
.. ...____ 3--W
TREATEo WASTEWATER
5,5""� ••
MAIN
-8...
STREET
T =EVER Dckoplw�ILUTION WATER
6.5•
60'
6--4Y'
PRIMARY EFFLUEUTFFLUENT
_.—_ _.—._i --c
BRE RO
VOL 133
P4o
SUBSTATION
�J
NSF BANGOR RYDRO ELMM -
PRD VOL 1334 P48Z