HomeMy WebLinkAbout1992-06-08 92-306 ORDINANCEw11111, n11on UZU
Dille m° 9.1992 Item No.
Item/Subject: Ordirarr@; Adding A cite 37 to Chapter II M establish rew
fee erl!fTiae .luly 1,1992.
Responsible Department Code Pine Priors.a.m.
Commentary:
glee puxpuse of this R*linarwe is to cvdthbt:ssn a new sCmLale of From
vAitls wore Closely place the coo[ th support the Code H�for®mnt
Bureau magi its activities w ttie ental s �vug t t berefit
Tons &Kh a vitfeas will oepicir9 that hast tine.
IXtams KXX
pm.. enr lived
MaJJrriefeerr's Comments:
IT
O'i I M^' 4� m Rel 6.0.1to .Wn�KIv rylyU
-lei. FY 9 3 ,
0 �aPA/
City Mennya
Associated Information:
Budget Approval:
rmance p:.m
Legal Approval:
City solicit.
Introduced For
=Passage
=X First Reading �I' Page—ol—
® Referral 4 jhiu.nw.peQ (J flW�iln.'
Aeeignedto Councilor Bragg Bine 8,1992 92 306
CITY OF BANGOR
(TITLE.) (ffirblTi Wgv Establishing Pee Schedule, for City Permits Issued, I.,,.,.....
by the City_ of Bangor. Code _Bntoraement.Officer.......
Be it orduintd by the City Comw.rl of the City of Bangor, as follows:
Chapter II, Article 37., Lees and ordinances of the City of Bangor is
hereby enacted as follows:
Article 37 - Schedule of Pees
City Code Enforcement Permits
Section 1. effective July 1, 1992, the City of Bangor Code Enforcement
Officer shalt change the chargee for peradts issued by or
through that office. see attached schedule of fees.
Section 2. The fee prescribed by this Ordinance shall supersede any
fisting City ordinance provisions that are inconsistent with
the schedule as set forth in Basion I above.
IN CITY COUNCIL
June 8. 1992
Received let reading.
Refected to Appropriate
Committee.
C
lT p._.�
ERK
In City Council June 22, 1992
Passed Vote B Yes 1 Absent
Voting Yes Baldacci.Blanchette,
Bragg, Cohen, Prandrel.SaA,Soucy
Stores Absent Sawyer
City Cler
92-906
ORDINANCE
TITLE,) Establishing Pee Schedule for City
Permits issued by the City of Bangor
Cade Enffo�onrrc�ement^^Officer
Q o
m
cD�
ROTE: COMBAT PERS ARE IN ( ), PROPOSED PEES ARE HNDRRLIBED
Effective
SCHEDULE OF FEES
CITY OF BANGOR
CODE ENPORCEKERT 6 FIRE PREVENTION
1. CONSTRUCTION
All new construction (residential commercial) remits shall be based
WE a fee multipling: of .0108 multiplied against total construction costs
derived it= arprgarinta calculations Pursuant to the adopted BOOK type of
mthodlyerwit fees as Presented to the City of Succor and In
effect as of July I in my calendar Year, New section, see examolem on
Panes 6 and 9
MISTING RESIDENTIAL CONSTRUCTION: including, but not limited to
remodeling, new fences, decks, swimming pools,lamentations , utility
buildings, concrete slabs, garages, additions, fire escapes, handicap
ramps.
PER: $20.00 minimum Plus ($4.00) $6.00 per $1,000.00 of construction
coat over $2,500.00. (Harrows fee of $10,000.00) No maximmn fee.
EXISTING NON-R68IDERIAL CONSTRUCTION: including, but not limited to
remodeling, additions, alterations, fences, concrete slabs, canopies,
accessory structures.
In: 830.00 minimum plus ($600) $6.00 per $1,000.00 of construction
coat over $2,500.00. (maximum fee of $10,000.000) No Mximnm fee.
ANEIDNBNTB TO BUILDING PERMITS:
Increase cost of work as per schedule above.
RELATED PEE FOR LAM APPLICATION AFTER WORN HAS HIM START®:
My work started without benefit of a permit shall be served a STOP
WORE ORDER, and, if subsequently permitted, pay (208) M additional
to the required permit fee.
PORTABLE SWINNING POOLS:
Permanent in -ground or above -ground not conforming to portable pool
requirements, based on cost of work as above. With side heights of 30"
and/or gallon capacity of 1,200 gallons or more. In: ($10.00) $20.00
OBSERVATION STANDS ANO ARUBEENT STANDS:
Temporary Stands: Pae $35.00
Permanent Stands: - based on construction cast as an previous page.
ROTE: CURRENT FABS ARB IN ( ), PROPOSED FRES ARE UNDERLINED
MOVING OF BUILDINGS:
Removal of a building or structure from one lot to another or to a new
location an the same lot.
FER: ($25.00 plus 50%) $25.00 plus 100E of any direct coat for
services provided by the City.
PARKING LOTS:
25-100 Spaces - Pee:($25.00) $50„00
101-300 Spaces - Fee:(550.00) 175.00
301 or more - Fm:(8300.00) $125.00
EXCAVATION:
Grading and filling only, in excess of 10,000 square feet and changes
to the topography of the land by were than me foot. FEE: $25.00
DKNOLITION:
Dwelling, structure or interior - $25.00 plus $10.00 for each story
over (3) stories -
Small Structures: such as garage or shed with no sewer connections -
Fee: $10.00
RELATED FEE WILL BE CLASSED W E DENDLITION NEW BEEN Ctl0R M
WITHOUT BENEFIT OF A PERMIT. A STOP WORK ORDER WILL BE LINES AND TEE PSE
DOUBLED BEFORE A PBRIIIT IS ISSUED.
I1. CERTIFICATE OF OCCUPANCY:
(Current) Certificate of occupancy as required under Article 23 of the
Erring ordinance. Fee:($10.00)
Proposed Ias ctia s to be dictated by cost of construction
fee l
Inspection fang gill be charossf dependent on project cuts and staff
lAsPection time incurred Used on the the 1ollowing scale:
Category Construction Coat fas 11M
Change of Occupancy IQ Construction $10.00 SIR
911192KY E permit $2
Cat5
e 501-9175,000 8
category C Forgo t 5
Category A Pe00 1 5
2
NOTE:
CURRENT FRES ARE
IN ( ),
PROPOSED NEWS ARS UVREELIN®
❑I.
Sim P®NITS:
Primitive Disposal System ....................$60.00
SHE: ($15.00 per sign) $25 00 Per gime
IV. ELECTRICAL PEANUTS:
Temporary Service .....................
Additional Residential Airing.........
New Wiring or remixing of single and..
two-family structures
New wiring or rewiring over two -fanny
structures
Service entrance - new or changeover.
Commercial .......................
....$20.00
....$20.00
....$40.00
...$40.00 plus(815.00)$20.00
for each additional mit
over two.
......$20.00 per entrance
......(S25.00) $40.00 Vietnam
plus 1/2 of 1% of cost
of the job.
MEAN WILL BE A SEPARATE CIARCB FOR NkeH ITER LISTED ABOVE, EVEN IF
THE WORN PERFORMED IS LOCATED CN TEE ENR 00B SITE.
BEUM F6:
Any work started without benefit of permit - after ane business day,
after receipt of notice, if subsequently Permitted, pay double the
required permit fee.
V.nL IN0 PERRITS:
Internal Fixtures: Fee based an per fixture vacant as listed:
1 and 2 fixtures - $6.00
3 - 30 fixtures, additional $3.00/fixture
11 - 20 fixtures, additional $2.00/fixture
21 + fixtures, additional $1.00/fixture
Complete Systems:
Non -Engineered system ........................$60.00
Primitive Disposal System ....................$60.00
Engineered System...........................5225.00
System Components (installed separately):
Treatment Tank...............................$30.00
Holding Tank.................................660.00
Alternative Toilet...........................$30.00
Disposal Area................................845.00
Begineeted Disposal Area ....................$120.00
Separated Laundry
Disposal System ........ ....$30.00
Seasonal Conversion
Permit...................$30.00
R1
BOTH: CURRENT PEES ME IN ( ), PROPOSED PEES ARE UNDERLINED
LATE PERMIT PER: My person who starts construction without first
obtaining a permit shall pay double the permit fee.
VI. YARD SHLE PERMITS/BAER OF PERSONAL PROPERTY/TRO EME/CARAOH BALE:
No perndts allowed per year.
1st Permit..................................($3.00) $5.00
2nd permit (60 days after first) ............ ($6.00) $10.00
VII. w00D STOVE PERMIT........................($5.00/stove) $12.00/stove
VIII. MIBIMOM EB®f0Y BTABOAR08.................$5.00
IA. OIL Human HERB: _.
For a residential replacement Inner or new installation with a firing
rate up to 2 1/2 gallons/hour or up to 200,000 BTU's (1 gallon =
134.000 BTU's)...............................($15.00) 820.00
For light commercial firing rate over 2 1/2 gallons/Mur up to 7 1/2
gallons/hour or over 200,000 Bl'u'e UP to 1 LLliion
BTU's........................................($20.00) $3D. ao
Heavy commercial firing rate over 7 1/2 gallons per hour or over 1
million EM's to. 2 million STO'S.............($30.00) $50.00
Industrial over 15 gallons/hour and over 2 million
BT0's........................................($40.00) $70.00
E. SPRINELBR SYSTEM:
If under 10 heads............................$5.00
Over 10 heads or under 50 ...................$15.00
Over 50 heads...............................$35.00
ilve
Hddr($5.00) $1O.e0 for each story over 1st.
Over 50 heads requires place ralliew
PinMHMN Sys} .................... 4.........(b1B.00) OD.Do
AI. THEgg:
Underground and above ground tante 276 gallons to 300,001 or more,
gasoline, fuel or oil taMs..................($15.00) $30,00
Liquefied gases 125 to 120.000 gallons or more water capacity, antler
and above ground.............................($15.00) 830.00
BELATED FEE FOR ALL RCEPT SPECIFICALLY NOTBD.... $25.00 additional
4
(Oy,
NOTE: CURRENT PEES BAB IN ( ), PROPOSAD PANS ANE UNDBALINED
All. APPEAL BOARDS:
1. Zoning Board of Appeals ...................(550.00) $70.00
advertising .................(855.00) $35.00
Total .......................(885.00) 8105.00
(Board of Appeals)
made effective July 1 each Year based on chanaes to the Consumer Price
111111.
The
Ban be chanced to reflect the exact intent of the Council.
WIT axsummtims�.
1. As aver2aa Yearly now construction bass couprised of the Past five
Years for calculation Purposes,
2. A fee mltiolier derived III calculation the cost of recouping the
salaries of the five versomnel in We Inforcommmat who are directly
involved in the Process. This would represent fifty varcent of the
asnamed positions at the Huream.
3. Per discussion Purposes the FY 90-91 Code Enforceamont budget im
a IF nev coastructivi cost, five Year average, 1987-1"1
The fee mul t' t recoumment for bar I ding. electrical.
fire inspectors, the 108
The followino are exammles of what the Few fee atguyture would represent
what the for in the past. (one of the
with the taw Proposal is that it does net reach a limit
--at 610,000 absolute which is promentlyhe case
costly r 1 elments such as fire protects n systeon,elevator
are.
factor (table) c
D. Multiply by fee multiplier .0108 d.
permit Fee
Gross area x gross area modifitr x type of construction (table) a
R@Mit fee multiplier = Permit fee,
n,i. naW me:Aod mer arra ar don Films. aGlas: Alex
AI Wilinal5dlwnmpmlbQmOmawrml "Wrom cirm If JI Ime
MuN :oup7ra of ComlmNan wnbinuiead, and the Forces Folyl:u mmmpummun Yfm.TReresultinBymiskeauwnufor
meTpladComuptianultl UsbGroupeflbebuldirs; relaLebalhm
bdWm9s.
Exmnpk:
L1sellc ndructmu Uufmup:RB
TSpea] 39orks Uo0:3C remit earaO,OW {. R.
Fl"m: Jvorks prtmfl&e MNYpWrv0.00]S
FireAlr Deamers
Fare Alarm 0<kab)s
Foe mpprMoo S>slem
3 easier x IU,Ul*sl.= "JAKI s.r.
3. Qw Mea Mmlife.54
3. TY I, a1Cwlsummm Fxbr(M TWcy,,
'R 7.'OPe W . 1. 14
6. Fm:au Fcc
IWmRfw.
fans vu a Glass &aa All A TOl Facto: r Ibwti Fc
Mewpliq
Alarm fee= FUM a M x L{d A.W)5=$13.BW.W
TYPE OF CONSTgUCT10N FACTOq
TYPaaICorWunM
.. r+aw 90 NOC
pl AmamhlL O'aalaR.M10We
Kmmbly, Navol¢,MNmetpa
A3 AiSwn ICFb
•J AeHmdGmWYM6
A� Atemm .NUMeya
0 pui9qu
E EWwbaL
F -I FapwYane0x4saW. rtgeyp Aaza•0
F$ FxlcryaeeirqusMy,yw Nyye -
H Hg011araq
41 m:Yrvbna4worvvMemi,anmml
IaeamOwW.inupuiu:Be
Lx bAiMimL.:eSnain6e
N SonedeN
P.1 Po<iaJn0a4Fobh
R3 nominated. ompN1
R3 RMiN1:0yl,ma, and MplantY
91,53 Slarage
Ow
Ip
IM
1.65
1.]0
LW
I.YB
1.95
LR
O)B
0.77
0]d
Ila
Idz
N9
IAi
1.31
I.D
097
O.N
18
I8H
I.BE
1$
IJI
13]
LD
IJH
0.)5
p.]5
Ol$
IJe
L]9
IA6
I.0)
11
1.D
095
0Y2
$p
1,]a
IS>
1]$
Idl
1.19
1.]p
O.ry
O.)0
OW
060
tl]
I:a
fAl
1.0'1
123
Lle
09$
069
20
LM
IS]
LA
LN
1.15
I38
@]
0.69
Ob9
0.65
1.m
ul
LM
I.W
I¢0
1.15
O.M
0.05
2C_
IAI_
l.µ
1,20
LIH
I.03
L1]
1.1f
062
062
0.59
IW
LW
Ln
0.91
1.12
1.16
OA6
OS9
ISI
I.X
LD
131
Od{
LIJ
1.10
050
0.50
0.53
Ix
IA]
126
091
121
LM
0.91
OS3
9A
IR
199
LIS
LId
I.01
1.10
to)
059
Ov^l
0.56
o.HS
ISl
Lv
OA6
1.00
IOz
OW
051
1R
LS]
1]6
LI]
LI2
0%
IA)
Loa
0.5]
50.
IAO
IS]
IA1
0.9]
OBS
p.H3
oW
OA]
SR
1.])
ID
090
0.93
003
0.9]
aPo
OU
O5l
pS3
o90
Fin
LD
0A1
IA]
p59
OA1
OS$
Od)
Oq
06)
Lsx
Llo
0l2
_099
089
O]i
Oq
Oµ
NP.
x65
N
Fill,
0.69
091
0.67
071
040
Fx.M Waemma.a0.�Om
4naNn AiyyuN
NOTE: CURREN4 PEES ARE I9 ( ), PROPOS® PEW ARE UNDERLINED
Example 1. 40V YAAAee Avenue, single family dwelling
(Pee of $6.00 per 01,000 based on construction cost of $40.00 per square
foot, Maximo fee of 010,000.)
(1,664 sq. ft., estimated cost of 066,560, permit fee 6409.23)
Prooeaed: Use green R3-Tyne 5 S
1. cross square feet 1.664
2. prom area modifier x 54 $89,856.00
163,721.00
4. Ege multiplier 8
Permit fee 0689.02
It% increase in permit fee, Fee represents 1.08% of construction couts
Example 2. 153 Russon Avenue, Multi-family. 4 wits
(3,984 sq. ft., eatimated cost 0159,360, permit fee 0956.00)
Proposed, due Orono RR TWA 58
1. Gross square fast 3984
2. Grossarea
modifier 54 $215,136.00
T
3, LO.C. factor 81 0197.160.00
4. Fee multiplier .0108 02,021.00
permit fee 52.021.00
1111 incream in Remit fee. FAA represents 1.08% of construction costs.
Exanple 3. SAw's wholesale Club - Rogan Road
(06.00 per 61,000 based on construction coats of 040.00 per square foot up
to 10,000 square feet and 62.00 per thousand over the 10,000 square feet,
maximum fee of 010,000.)
(104,389 sq. ft., estimated cost 04,125,000, permit fee 09,950)
Proposed' Use Group X Type 3A
1. Gross Huare feet 104.399
2. Gross area modifier a 54 $5,637,006
$4,847,825
FAA maltiplie
356 5
Permit fee 852.352.00
68 increase in permit fee, Fee rMUMMU 1,08% Of construction
6�.
NOTE: CURRENT FRES ARF z8 ( ), PROPOSED FEES ARE UNDERLINED
Fzample 4, MAL -NMT,. INC.
(114,520 sq. ft., estimated cost $4,840,520, permit fee $10,000)
Proposed: Use Grotto M. Type 3A
Gross1. Groan square feet 11A.529
2.
c. factor .86 65.318.680
4� Pes�nultfplder 4100 857,441.74
474% increase in pulpit e. Bee represents 1.00% of construction costs.
Total estimated revenue from over -ell proposed pezmit fees would represent
as increase of 30%.
Present revenue, 8140,000
Proposed revenue with fee increase, $102,000