HomeMy WebLinkAbout1993-08-23 93-402 ORDERCouncil Acdon
Date Ansae 21.1491 Lem No. g3-402
hemiSuOW: 08088: Award of Bid for the Mat Summer Street Sewer Reconstruction
project
Respon9ble Department: Engineering
pursuant to our consent decree with the State of Maine, the City Of
Bangor is continuing its sever separation and rehabilitation projects.
Total projects in thea untat
of approximately $2 million dollars
have been authorized by the Council for this year and will be financed
tbtough an upcoming borrowing.
Bidswere
.CO
received On August 11th for the r ctlon and separation
of theexisting pipes on East Summer Street. These lines are in
extremely poor condition and have collapsed at several locations in
recent years.
it is recommended that the contract be'a ardea.to Hughes Bros., Inc.
for their low bid amount of $112,872.75, which compares favorably
with the Engineer's Estimate of $120,000.
/ib•-: Ye:d I
Associated Information:Q � iT
Fi-1114 OSeemi
Legal
cayc:y 5g
Introduced For
int qe-ding
❑ Referral
page _of_
93-402
Msigned to Councilor Frankel August 23, 1993
CITY OF BANGOR
alTLE.) Wrb=. ....... Award-af Eid.. fQr the. East. Sa®er Street Sewer Reconstruction
BY toe CntY (Sn a d? Of My Of8axpur:
OEDEMA
ME the award of bid is hereby made to Hughes eros.. Inc. for the
Hast Summer Street Sewer Reconstruction project in the amount of $112.872.75.
93-402
ORDER
IN CITY copNciL Title,
Avguat 23, 1993
Passed gmard of'D£d far t.e. east. 5
. PFFfF. $FFeet
+ Sever Reconstruction
CITY/ LERR
............ ...... ...... ......
Assigned to
...... ...�..4.i ..... .
Councilman
CITU OF IMGOR
BIDTAMLATION
Page 101
Bid Opening: August 11, 19M
...,.....,.....E�..,....�. __ ......._..
Hug BroUef , Inc.
Lou Silver, Inc.
CarrpRell Consimction
He it Maine
Orono, Maine
Brewer Milne
Un
Rem
Unit Item
ITEM
DESCRIPTION OTY.
UNIT
Pdce
Total
Price Total
1.
Rock Dioavifiin
250
65.00
16,250.00
100.00
25000.00
50.00
12,500.00
2.
Misc. Fxoavation
20
-20.00
400.00
15.00
WO.00
20.00
400.00
3.
ET" &BacMlll
50
25.00
1,250.00
1590
750.00
25.00
1250.00
4a
f? PVC
210 If
42.00
8,820.00
41.40
8,694.00
52.45
11.014.50
4D.
10'PVC Pie
417 R
44.00
19,396.00
4394
18,322.98
53.60
22,351.20
9c.
12'PVCC PI a
37 H
46 m
1120.50
4494
1,662.]8
55.65
2,059.05
4d.
4°PVC House Leterds
"DI
41.50
19,090.00
25.00
11,WD.00
41.25
1875.00
5a
B' WC Storm Wein
95 R
4090
1,8011.00
41.40
1 853.00
- 4]90
2,155.50
M.
12'Storm Drein
34811
46.00
15,916.00
49.99
15549.24
50.15
1]351.911
6.
4'Sewer McMdes
31.5 vl
13090
909500
212.00
66]8.00
175.110
5,512.50
].
5' Dmic Manhole
6 N
250.00
2,000.00
252.00
2,016.00
245.W
19W.W
3.
4'CatchEasin
5 A
1W.0D
900.00
21290
10150.00
190.00
950.00
9.
Manhole Frims & Covers
4 ea
350.00
1400.00
325.00
1300.00
390.00
1,560.00
10.
BManholeC m
1 ea
400.00
400.00
900.00
400.OD
55090
550.00
11.
flim.B Reset Catch Basin
1 ea
40D.00
400.00
400.W
400.00
230.110
230.00
12.
Tam .Trench Pavement
1008 s
5.50
5,533.00
6.17
8,20'!.02
5.255,281.M
13.
Fenn. Trench Pavement
1006 W
].00
],042.00
15.00151090M
14A0
14,064.00
14.
Bitum. Concrete Cwbin
33511
6.95
2,328.25
6.50
2,1]].50
425
1,42375
15.
Loam, Seed, Fen, N MUUh
90 W
2.00
180.00
5.00
450.00
0.01
0.90
15.
Calcium Chloride
10 to
450.00
4,SW.0D
0.01
0.10
0.01
0.10
17.
Water DusiCallol
WORD 1
0.01
W0.00
0.01
500.00
0.01
500.00
TOTALAMOUNTSID
112 2.75
111g:920.62
120109.90