Loading...
HomeMy WebLinkAbout1993-08-23 93-402 ORDERCouncil Acdon Date Ansae 21.1491 Lem No. g3-402 hemiSuOW: 08088: Award of Bid for the Mat Summer Street Sewer Reconstruction project Respon9ble Department: Engineering pursuant to our consent decree with the State of Maine, the City Of Bangor is continuing its sever separation and rehabilitation projects. Total projects in thea untat of approximately $2 million dollars have been authorized by the Council for this year and will be financed tbtough an upcoming borrowing. Bidswere .CO received On August 11th for the r ctlon and separation of theexisting pipes on East Summer Street. These lines are in extremely poor condition and have collapsed at several locations in recent years. it is recommended that the contract be'a ardea.to Hughes Bros., Inc. for their low bid amount of $112,872.75, which compares favorably with the Engineer's Estimate of $120,000. /ib•-: Ye:d I Associated Information:Q � iT Fi-1114 OSeemi Legal cayc:y 5g Introduced For int qe-ding ❑ Referral page _of_ 93-402 Msigned to Councilor Frankel August 23, 1993 CITY OF BANGOR alTLE.) Wrb=. ....... Award-af Eid.. fQr the. East. Sa®er Street Sewer Reconstruction BY toe CntY (Sn a d? Of My Of8axpur: OEDEMA ME the award of bid is hereby made to Hughes eros.. Inc. for the Hast Summer Street Sewer Reconstruction project in the amount of $112.872.75. 93-402 ORDER IN CITY copNciL Title, Avguat 23, 1993 Passed gmard of'D£d far t.e. east. 5 . PFFfF. $FFeet + Sever Reconstruction CITY/ LERR ............ ...... ...... ...... Assigned to ...... ...�..4.i ..... . Councilman CITU OF IMGOR BIDTAMLATION Page 101 Bid Opening: August 11, 19M ...,.....,.....E�..,....�. __ ......._.. Hug BroUef , Inc. Lou Silver, Inc. CarrpRell Consimction He it Maine Orono, Maine Brewer Milne Un Rem Unit Item ITEM DESCRIPTION OTY. UNIT Pdce Total Price Total 1. Rock Dioavifiin 250 65.00 16,250.00 100.00 25000.00 50.00 12,500.00 2. Misc. Fxoavation 20 -20.00 400.00 15.00 WO.00 20.00 400.00 3. ET" &BacMlll 50 25.00 1,250.00 1590 750.00 25.00 1250.00 4a f? PVC 210 If 42.00 8,820.00 41.40 8,694.00 52.45 11.014.50 4D. 10'PVC Pie 417 R 44.00 19,396.00 4394 18,322.98 53.60 22,351.20 9c. 12'PVCC PI a 37 H 46 m 1120.50 4494 1,662.]8 55.65 2,059.05 4d. 4°PVC House Leterds "DI 41.50 19,090.00 25.00 11,WD.00 41.25 1875.00 5a B' WC Storm Wein 95 R 4090 1,8011.00 41.40 1 853.00 - 4]90 2,155.50 M. 12'Storm Drein 34811 46.00 15,916.00 49.99 15549.24 50.15 1]351.911 6. 4'Sewer McMdes 31.5 vl 13090 909500 212.00 66]8.00 175.110 5,512.50 ]. 5' Dmic Manhole 6 N 250.00 2,000.00 252.00 2,016.00 245.W 19W.W 3. 4'CatchEasin 5 A 1W.0D 900.00 21290 10150.00 190.00 950.00 9. Manhole Frims & Covers 4 ea 350.00 1400.00 325.00 1300.00 390.00 1,560.00 10. BManholeC m 1 ea 400.00 400.00 900.00 400.OD 55090 550.00 11. flim.B Reset Catch Basin 1 ea 40D.00 400.00 400.W 400.00 230.110 230.00 12. Tam .Trench Pavement 1008 s 5.50 5,533.00 6.17 8,20'!.02 5.255,281.M 13. Fenn. Trench Pavement 1006 W ].00 ],042.00 15.00151090M 14A0 14,064.00 14. Bitum. Concrete Cwbin 33511 6.95 2,328.25 6.50 2,1]].50 425 1,42375 15. Loam, Seed, Fen, N MUUh 90 W 2.00 180.00 5.00 450.00 0.01 0.90 15. Calcium Chloride 10 to 450.00 4,SW.0D 0.01 0.10 0.01 0.10 17. Water DusiCallol WORD 1 0.01 W0.00 0.01 500.00 0.01 500.00 TOTALAMOUNTSID 112 2.75 111g:920.62 120109.90