HomeMy WebLinkAbout1993-05-10 93-259 ORDERDateV...
Mav 10,I 1993 Item No. 93-25_9 _
Item/Subject: Engineering Services Contract with Boyle,
Tanner S Associates for Terminal Corridor
Addition s Passenger Boarding Bridge and the
Purchase of Runway Deicing Equipment 6 Tank.
Responsible Department: Airport/Purchasing
Commentary:
Hoyle, Tanner 6 Associates, the Airport's design and
engineering consultant has proposed an engineering and
construction administration services contract for a terminal
corridor addition and boarding bridge and for deicing
equipment. These items have been approved under the FAA's
Airport Improvement Program JAIP No. 3-23-0005-15) for the
federal fiscal year October 1, 1992 through September 30, 1993.
The budget for the boarding bridge project is $501,150.00
and the coat of the deicing applicator and storage tank will
be $191,650.00.
The passenger boarding bridge and second level corridor
addition to serve the loading bridge is being funded with 75%
FAA, 58 State DOT and 208 Airport funds.
Hoyle Tanner 6 Associates has subcontracted with the Ames
Corporation for the corridor design and bearding bridge
installation since Ames has been heavily involved with the
Terminal Additions 6 Renovations project. The sub -contract
consists of approximately $30,500 in design and construction
administration services.
The purchase of the runway liquid chemical deicing fluid
applicator truck and the installation of the 10,000 gallon
storage tank is being funded 908 FAA, 58 Maine OOT, and 58
Airport funds.
This $]],200.00 consultant engineering contract has been
reviewed and approved by the FAA.
A summary of the consultant services fees is as follows:
1. Design
a. Terminal 31,500
b. Deicer 10,650
2. Construction
a. Bidding 6,500
b. General Construction Administration 15,000
c. Control 6 Testing of Materials 1,150
Page 1 of
Date May 30, 1993 Item No. 93-259
3. Project Administration 6,300
4. environmental Permit Application Assistance 6.100
$7],200
Total Boarding Bridge project $48,850.00.
Total Deicing Equipment 6 Tank $28,350.00.
While waiting for FAA s and approval of this contract
Hoyle, Tanner S Associates ehas wcompleted most of the project
design requirements.
The following Council Order for authorisation of the City
Manager to execute the contract will be presented to the
Airport Conmd.ttee on May 7, 1993 and referred to the city
Council for approval.
Depar m J
Manager's Comments:
City Manager
Associated Information:®
Budget Approval:
Introduced For:
Passage / % First Reading /-7 Referral
Page 2 of ✓/
Finance
Director
Legal
Approval:
Introduced For:
Passage / % First Reading /-7 Referral
Page 2 of ✓/
93-259
Aeeipwd to Coundor Scone, May 10, 1993
CITY OF BANGOR
(TIRE.) (gn)gra Authorizing. City .Map a r to Execute Consultant Enginkaring and
Project Administration Services Contract with Hoyle, Tanner A Associates for Boarding
Bridge and Deicing Equipmatne.
By the MW Cemneit of the CftB ofsanw.
ORDERED[
TWT Edward A. Barrett, City Manager, is hereby authorized to execute a
consultant engineering and project administration services contract with Hoyle,
Tanner & Associates in the amount of $)),200.00 for the new passenger boarding
bridge and runway deicing equipment at Bangor International Airport.
-
A copy of the contract is on file in the City Clerk's Office.
93-259
ORDER
IN CITY COUNCIL Title,
May 10, 1993
Passed
Authorizing city Manager to Execute Constultant
Q, rteelidg"edd Wc;jece Services
C`C CLY! & Contract with Royle. Tanner 6 Associates for Boarding
ucLlga and naicing.Equiryaelt..........
cowtilman
o�
PMRg GME S
'
�
MNrlpl
AOGMW
40d1
q
S
I
2
EXPu K% OF Ex NE HOLDING RCOM
ExnsE ONE
I
-
N
J
Z
II4
Lorwa
_
aa4"
-
f
o rc
ASSENGER
—
LOADING
LARDING BRIDGE
_
:`�� `.
_�_ -
_------------- -------
o
Z
PROP. PIER
-
_
uuw
0
�z
a
Nor
i
o
_
DO
�r
E
v
-DOMESTIC TERMINAL
G-'
T
CHEMICAL STORAGE
PROJECT SKETCH
_
__
Hcyk. Tanra� &Associates. Ix HAS'