Loading...
HomeMy WebLinkAbout1994-01-24 94-75 ORDERI[draduaed For 6!s- ,a{gq IRgamage ❑ First Rending page —of — ❑Referral pne 1-24-1994'u" Item No. 94-75 IteMSubjeat: Application for Utility Location Permit. Responsible l3epmtrnant City Clerk Comncenmyry Application for Utility Location Permit: Target Industrial Circle, one pole to be placed on the northerly eider approximately 1.132 feet westerly of the ]unction of outer Norwood Street No Public Notice of this Application" to,be:,'mada% Mr."M111 HIld ManagersC Mnwm: Ai Ci[y Mmmy Associated Information: Sudget Approval: Damara tire[!w Legal Approval: Cirysawsor I[draduaed For 6!s- ,a{gq IRgamage ❑ First Rending page —of — ❑Referral 94-)5 Assigned to CouncHor Shubert January 24, 1994 CITY OF BANGOR (TITLE.) NYiYert eppu tinfor,utilicy Location, Permit Bangor Hydro Electric Company. Bu the City CoaaNt Of the Ciy of Baxter: ORDERED, TORT the attached application for utility location permit is hereby granted upon condition thee the poles be unabated. Note: Following is the public street referred to: Target industrial Circle, one pole to be placed on the northerly side, approximately 1,132 feet westerly of the junction of outer Hammond Street. No Public Notice. of this application to be made. 94-75 ORDER IN CITY COUNCIL Janasry 24, 1994 Title, - Pas Application for. UHllty Location.Permit CI CLBRR mergg�%y%e�rr��jjpg�H�yyfddrJa/EE/�lee��cC/ 0 trrric �Coom\mpany. ..'-... K Aeei1g d to _ Councilman BANG❑R PAGE 1�F 1 DATEI1-5-94 POLE PERMIT ENG. SRB CAD SRB .PLAN 30-7.2/12.47KV 3MNU 41BANGOR3110 PLAN k 1548 m 0 F TARGET IND. CIR. ra 0 1132' E 29'L/L F 2 0 Y W F- O 94-75 FORM 432A 1BANGOR3110 APPLLCATION FOR UTILITY LOCATION PERMIT PLAN 0 1548 TO: Bangor City Council - City of Bangor BANGOR HYDRO -ELECTRIC COMPANY, a Maine corporation being duly authorizedpursuant to the laws f the State of Maine to generate, sell, distribute and supply electricity in the City of Bangor, County of Penobscot, State aforesaid, hereby applies for a permit to authorize it to locate, construct, maintain and operate certain of its facilities hereinafter described upon, along, over and across certain public ways situated in said City of Bangor. No public notice of this application will be made in accordance with the terms and conditions of Title 35-A, Section 2503, MRSA as amended. WCATION: TARGET INDUSTRIAL CIRCLE, one pole to be placed on the northerly side, approximately 1,132 feet westerly of the junction of Outer Hammond Street. DESCRIPTION The facilities will consist of a line composed of wood poles and supports therefor, crossarms, wires and/or cables together with associated appurtenances. The minimum clearance of the wires and/or cables, other than guywlres, will be at least eighteen feet over the public way. Me poles will be set within the limits of the public ways but outside the part thereof customarily used for travel by vehicles. The initial operation of the facilities will be at 7200/12470 volts, three phase; the voltage will be increased as occasion therefore requires for the operation not in excess of 20 EV to ground. Dated at Bangor, Maine BANGOR HY[ .O -ELECTRIC COMPAryy on January 5, 1994. By: /'_ii �h , Rbbept L. Avert Tranmission and Distribution C Job Coordinator UTILITY IAGTION PERMIT of permit or cc in hand or 94-75 1BANGOR3110 PLAN $ 1548 ANY dated in of its across certain newspaper with said Hydro -Electric ain of its across certain set forth. my person, municipality tion with ths nstallation ritten served by LOCATION: TARGET INDUSTRIAL CIRCLE, one pole to be placed on the northerly aide, approximately 1,132 feet westerly of the junction of Outer Hammond Street. DESCRIPTION: The facilities will consist of a line composed of wood poles and supports therefor, c and/or cables together with associated appurtenances. Thw eminim= clearance of the wires and/or cables, other than guy wires, will be at least eighteen feet over the public way. The poles will be set within the limits of the public way, but outside the part thereof customarily used for travel by vehicles. The initial operation of the facilities will be at 7200/12470 volts, three phase) the voltage will be increased as occasion therefore requires for the operation not in excess of 20 NV to ground.. Authorizing signature(s): Received and Recorded in Book ,Page Dated at ,NE, on ei: sF 19 At This Day of ,19_