HomeMy WebLinkAbout1994-09-26 94-424 ORDERCouncil Action pate September 26, 1994 Item No. 94-424„ Item/$ubjea: Award of Bid for Street Rehabilitation and Heavy Resurfacing Projects PIN 5846.00 - State Street and PIN 5849.00 - Esmond Street Responsible peparranT Engineering Commentary: See attached Hemarandum from City Engineer. - Manager's Commas": -Cry Auoce tt Inlwmation: Budget Approval: Y g Pi [e ITre[tm Legal Approval: Crty Sdui[[r Introduced For Passage First Reading Page _ of Referral 94-424 Assigned to Councilor Saone September 26, 1994 CITY OF BANGOR (TITLE.) uviaBii --Award of Bid for, Street Rehabilitation and Nearly Resurfacing, Projects; PIN 5846.00 - State Street and PIN 5849.00 - Ha®ond Street By the City Couuil of the City otBar tow: ORDERED, THAT the award of bid is hereby made to Lane Construction Corp. for street rehabilitation and heavy resurfacing projects. PIN 5846.00 - State Street and PIN 5849.00 - Ha®ond Street. In the am0unt,of $104,682.50. IN CITY COUNCIL Sptember 26, 1994 94-424 Passed ORDER f CITY CLRRK Title, s; ?I of Bid for Street Street andaFIN and Resurfacing Projects; PIN 5846.00 - State S[[eeC and PLN 5849.00 - Na®oM Street. M Femi to Shy............... cammcilman CITY OF BAMCOA, MAINE Engineering Department MEMOBANUUM Date: September 20. 1996 To: Members of the City Council From: James D. Ring, City Engineer Subject: Council Order - Award of Bid for Street Rehabilitation and Heavy Resurfacing Projects on State Street and Kneaded Street The above -referenced Council Order is on award acact for the rehabilitation and has" resurfacing of portionsof Street and Hammond Street. These projects were approved through the BACTS process for inclusion in the SOFT Transportation Improvement Program for the current biennium. Eighty-five per cent of eligible project costs will be reimbursed by MOT, leaving the local share at fifteen per cent. Traditionally projects such as this have been designed and administered by MOT which has often [esulted in a lengthy time from project development to projectcompletion. In order to expedite such projects and to accomplish them more economically. MOT has agreed to allow some of the larger municipalities to develop and manage certain projects subject to MOT requirements. As of the end of Augueq IDIOT had not finalized its requirements for allowing municipalities to develop and ad- minister projects. We had been informed. however, that these projects could not simply be included In our regular annual paving program Since nidus to move forward with the State Street and Outer Hammond Street projects. I me with MOT representatives to finalise the requirements and toobtain approval to advertise the projects for bid. The State Street and Outer �w Hammond Street projects were included under one contract and 1� advertised on September 7th. Bids will be received on Wednesday. September 21st, and a rec ®endaCion foraward x111 be provSded prior to the next Council meeting on September Since the State will be picking up eighty-five per cent of the costs, it is necessary to execute a Municipal/State Agreement as is customarily done oany project involving State funds. A companion Council Order authorizing execution of the Agreement will also be o ext Monday's agenda. MOT assured me that I will be n receiving the Agreement this week. -1- 94-424 Both projects involve grinding (removal) of existing pavement and resurfacing with a henry overlay. New curb and handicap ramps will be installed on State Street. The State Street project i between Broadway and Forest Avenue, and the Hammond Street project extends from the end of Hammond Street "Bulge" to the Harmon Town Line. Public Works will be performing some of the preparatory work, which is eligible for 85% reimbursement of coats. A project cost estimate is attached. The local sharehas previously been appropriated 1n the City's capital program. -2- 94-424 FACTS PROJECTS - 07624 ESTIMATED COSTS State Street Outer Hammond Street 1) Engineering Design $2,000 $3.000 2) Construction engineering $5,000 $5,500 3) Project Main. $1,000 $1.000 4) Testing (To be Performed by MOT) 5) Construction - by City of Bangor (Force Account) $18,000 £84,400 6) Construction - by Contract Cold Planing - Pavement Removal $11,570 $11.180 Not Bit. Cone. Pavement ('F' mix) - $16,250 Nat Bit. Cone. Pavement ('C' mix) $25,000 $18,750 Bituminous Tack $550 $1.050 "just Exist. M.R. d C.B. Covers $6,000 $2,000 Not Bit. Cone. Curbing $11,700 - Construct Handicap Curb Access Ramps $15.000 - SUBTOTALS $ 95,820 $143,130 + CONTINGENCY 9,680 $1�3J0 TOTAL $105,500 $157,500 TOTAL COMBINED PROJECT COST: $263,000 CITY OF BANGOR Page 1 of 1 BID TABULATION Bid Opening: September 21, 1994 STREET REHABILITATION NOTE: Engineering Department estimate for contract work itemized above is $119,050. Central Maine Paving DoverFoxcrofl Maine Lane Conahuction Corp. Ban orrt4edtlan CT. ITEM DECRIPTION QTY, UNIT Unit Price Item Total Unit Price Ilam Total la. Cold Planing -State Street 8,900 s 1.45 12905.00 1.25 11,125.00 ib. Cold Planing -Hammond Street 8600 s 1.45 12470.00 1.25 10,750.00 2a. Hot Bituminous Concrete-'B'Miz 650 tons 23.50 15275.00 24.00 15 fi00.00 2b. Hot Bituminous Concrete-'C'Miz 1,750 tons 25.50 44,625.00 25.40 44450.00 3. BiWminous Tack 800 el. 2.00 11600.00 1.60 1,280.00 4. Adjustment of Catch Basin 8 Manhole Covers 16 as 325.00 5,200.00 470.00 7,620.00 S. Installaiton of Hol Bituminous Concrete Curbing1,950 8 2.75 5,362.50 4.85 9,457.50 6. Construct HandicapCurb Access Rams 15 w 600.00 9000.00 300.00 4,500.00 TOTAL AMOUNT BID $106437.50 $104682.50 NOTE: Engineering Department estimate for contract work itemized above is $119,050.