Item/$ubjea: Award of Bid for Street Rehabilitation
and Heavy Resurfacing Projects
PIN 5846.00 - State Street and PIN 5849.00 -
Esmond Street
Responsible peparranT Engineering
Commentary:
See attached Hemarandum from City Engineer.
-
Manager's Commas":
-Cry
Auoce tt Inlwmation:
Budget Approval:
Y g
Pi [e ITre[tm
Legal Approval:
Crty Sdui[[r
Introduced For
Passage
First Reading Page _ of
Referral
94-424
Assigned to Councilor Saone September 26, 1994
CITY OF BANGOR
(TITLE.) uviaBii --Award of Bid for, Street Rehabilitation and Nearly Resurfacing,
Projects; PIN 5846.00 - State Street and PIN 5849.00 -
Ha®ond Street
By the City Couuil of the City otBar tow:
ORDERED,
THAT the award of bid is hereby made to Lane Construction Corp.
for street rehabilitation and heavy resurfacing projects. PIN 5846.00 -
State Street and PIN 5849.00 - Ha®ond Street. In the am0unt,of
$104,682.50.
IN CITY COUNCIL
Sptember 26, 1994 94-424
Passed
ORDER
f
CITY CLRRK Title, s; ?I of Bid for Street Street
andaFIN and Resurfacing
Projects; PIN 5846.00 - State S[[eeC and PLN 5849.00 -
Na®oM Street.
M Femi to
Shy...............
cammcilman
CITY OF BAMCOA, MAINE
Engineering Department
MEMOBANUUM
Date: September 20. 1996
To: Members of the City Council
From: James D. Ring, City Engineer
Subject: Council Order - Award of Bid for Street Rehabilitation
and Heavy Resurfacing Projects on State Street and
Kneaded Street
The above -referenced Council Order is on award acact
for the rehabilitation and has" resurfacing of portionsof
Street and Hammond Street. These projects were approved through
the BACTS process for inclusion in the SOFT Transportation
Improvement Program for the current biennium. Eighty-five per
cent of eligible project costs will be reimbursed by MOT,
leaving the local share at fifteen per cent. Traditionally
projects such as this have been designed and administered by
MOT which has often [esulted in a lengthy time from project
development to projectcompletion. In order to expedite such
projects and to accomplish them more economically. MOT has
agreed to allow some of the larger municipalities to develop and
manage certain projects subject to MOT requirements.
As of the end of Augueq IDIOT had not finalized its
requirements for allowing municipalities to develop and ad-
minister projects. We had been informed. however, that these
projects
could not simply be included In our regular annual
paving
program Since nidus to move forward with the
State Street and Outer Hammond Street projects. I me with MOT
representatives to finalise the requirements and toobtain approval
to advertise the projects for bid. The State Street and Outer �w
Hammond Street projects were included under one contract and 1�
advertised on September 7th. Bids will be received on Wednesday.
September 21st, and a rec ®endaCion foraward x111 be provSded
prior to the next Council meeting on September
Since the State will be picking up eighty-five per cent
of the costs, it is necessary to execute a Municipal/State Agreement
as is customarily done oany project involving State funds. A
companion Council Order authorizing execution of the Agreement will
also be o ext Monday's agenda. MOT assured me that I will be
n
receiving the Agreement this week.
-1-
94-424
Both projects involve grinding (removal) of existing pavement
and resurfacing with a henry overlay. New curb and handicap ramps
will be installed on State Street. The State Street project i
between Broadway and Forest Avenue, and the Hammond Street project
extends from the end of Hammond Street "Bulge" to the Harmon Town
Line. Public Works will be performing some of the preparatory work,
which is eligible for 85% reimbursement of coats. A project cost
estimate is attached. The local sharehas previously been appropriated
1n the City's capital program.
-2-
94-424
FACTS PROJECTS - 07624
ESTIMATED COSTS
State Street Outer Hammond Street
1)
Engineering Design
$2,000
$3.000
2)
Construction engineering
$5,000
$5,500
3)
Project Main.
$1,000
$1.000
4)
Testing
(To be Performed
by MOT)
5)
Construction - by City of
Bangor (Force Account)
$18,000
£84,400
6)
Construction - by Contract
Cold Planing - Pavement Removal
$11,570
$11.180
Not Bit. Cone. Pavement
('F' mix)
-
$16,250
Nat Bit. Cone. Pavement
('C' mix)
$25,000
$18,750
Bituminous Tack
$550
$1.050
"just Exist. M.R. d
C.B. Covers
$6,000
$2,000
Not Bit. Cone. Curbing
$11,700
-
Construct Handicap Curb
Access Ramps
$15.000
-
SUBTOTALS
$ 95,820
$143,130
+ CONTINGENCY
9,680
$1�3J0
TOTAL
$105,500
$157,500
TOTAL COMBINED PROJECT COST: $263,000
CITY OF BANGOR Page 1 of 1
BID TABULATION Bid Opening: September 21, 1994
STREET REHABILITATION
NOTE: Engineering Department estimate for contract work itemized above is $119,050.
Central Maine Paving
DoverFoxcrofl Maine
Lane Conahuction Corp.
Ban orrt4edtlan CT.
ITEM
DECRIPTION QTY, UNIT
Unit
Price
Item
Total
Unit
Price
Ilam
Total
la.
Cold Planing -State Street 8,900 s
1.45
12905.00
1.25
11,125.00
ib.
Cold Planing -Hammond Street 8600 s
1.45
12470.00
1.25
10,750.00
2a.
Hot Bituminous Concrete-'B'Miz 650 tons
23.50
15275.00
24.00
15 fi00.00
2b.
Hot Bituminous Concrete-'C'Miz 1,750 tons
25.50
44,625.00
25.40
44450.00
3.
BiWminous
Tack 800 el.
2.00
11600.00
1.60
1,280.00
4.
Adjustment
of Catch Basin 8 Manhole Covers 16 as
325.00
5,200.00
470.00
7,620.00
S.
Installaiton of Hol Bituminous Concrete Curbing1,950 8
2.75
5,362.50
4.85
9,457.50
6.
Construct HandicapCurb Access Rams 15 w
600.00
9000.00
300.00
4,500.00
TOTAL AMOUNT BID
$106437.50
$104682.50
NOTE: Engineering Department estimate for contract work itemized above is $119,050.