HomeMy WebLinkAbout1994-08-08 94-359 ORDERDoandi Acton
Data
Lem No. 94-359
hemiSublecL Award of Bid for Construction of Fifteenth Street Sewer Separation
Project
Fapom ble Department: Engineering
Forebear to the requirements of our Consent Decree with BPA. the City of
Bangor is continuing its program of sewer
a
separation a outlined in the
CBO Facilities Plan. This Council Order is t and abid for construction
of the Fifteenth Street Sewer Separation project, which is a continuation
of work done in the Fourteenth Street area last year.
Bids will be received on Wednesday, August 3rd. 1994 for this project.
Prior to the Council meeting, a tabulation of bide and recommendation
for award will be provided.
J'hnzga-iS Comments: I I
✓ JL_ �J� /
7k# Sol
Qp/� s/iivra Sol il6ErmJ� /U/iC'I'40/81) 444 44) 1?t1AVV" U11k 14 Ae
Wq( IV&
lF g�/LLen
0./'G Li/off a/arANe/ .
Immdaced For
hff
yw Peirce Pape _ef_
❑ Fhtt Reeding
❑ Referral
I
94-359
Assigned to Councilor (Substitute)
CITY OF BANGOR
(TITLE,) @rUrf Award f Hid f r,CopsC tion of -Fifteenth Street_ S_wer__.. _.
Sepal ti project _
BY the IXN CospeB of the My of Beeper.
ORDERED,
THJ,T the award of bid is hereby made to Brescia construction, Inc.
for the construction of the Fifteenth Street Sewer Separation Project in the
amount of $498,159.00.
4sitsedto Conan'lor sxox® August S. 9994-139.
4
CITY OF BANGOR
(TiTLE.) @lt*gr, Award of Bid for Construction, of, „Fifteenth. Street Sevex
By We City CoymW of the CUP NBa*w.:
08DF=D,
TWAT the award of bid 1s hereby made to
for the construction of the Fifteenth Street Sewer Separation Project in the
amount of
IN CITY COUCIL
August S, 1994
Passed As Amended by
Substitution.
l/tmllvg ! pClls .w�
� CITYCITY CLQ
94-359
ON D I R
Title,
ngard p{ .1q4 go; const;ycggqq .4f pAEteentb
.Street Sever Separation Project.
......................................
\P Awgodl to
A..... !. ............................
Councilman
C" OF BANGOR Pagel Mt
BIDTABULATON 01E Openly: AWW 3, 1M
15TH STREET SEWER SEPARATION PROJECT
Baeada Conalrudbn, Ina
Clinton M®le
9E. MacMIIIiW Company, In
a Maine
CampbdlCdMmction Co.
&ewer, Maine
ITEM
DECRIPTION
Ott
UNIT
Unit
Price
Hem
TOlal
Unit
Price
Rem
Total
Unit
Pace
Rem
TOW
la.
rech&8 nal Rock EcaMioni<Wi
$0
1W.00
5,Oo0.c0
50.00
3WD.00
]5.00
3]50.00
lb.
ench&Stm ml Ra E aavgion301-500
1
180.00
loom
1M
100
001
001
la
ranch& SHw.bnl Rock Excavation (over WO
1
e
100.00
loom
LW
1.00
001
0.01
2
ac. EvavaBOn&Re ecementBxkfill
100
1500
1,50D.m
0.01
1.00
25.00
2.500.00
3
¢aea1mn 80ac IIIEebw nnmal pie
50
10.00
50000
001
0.50
30.00
1,500.00
4.
"PVC Sana Sewer
533
If
39.00
20]8)00
Sam
28&50.00
48.20
2A 524.W
5.
14'PVC Samfa $awr%e
545
If
45.00
24,525.00
05.W
35425.00
66.20
Won
6.
"PVC 6anlle Sewer
1517
It
61.00
92,00].00
81.00
122077.00
88.20
133]99.40
].
0"PVC Storm Onin Pl
45
If
64.00
2800.00
8000
2,70D.00
5920
2,39400
8.
T'PVC B[oml Onln 771
100
It
4]00
S.tl29m
6000
8420.00
58.20
822240
9.
'PVC 6tomi 0ni4771
490
If
54.00
2689200
]000
34,80000
]02f1
3495960
10.
6' PVC Stwm Omin Pie
1,592
It
5].OD
00,]4400
6000
108259.00
0220
138.82240
H.
CHoux Servke talon A1I 31. e%ce Olio
1040
It
43.00
44,nDOD
3000
31,200.00
45.00
48800.00
t2.
' PVC HOUae 6ervix Lalereb glp6L
t35
If
58.00
]Wo.00
3000
4.000 00
55.00
],425.00
l3.
iT' Ca1c58adn Connedlcenb P54851am IXal
]
x
BN.OD
4,20000
1.00
.00
120000
8,400.00
14.
OlameterB Manholes
100
of
i80.OD
10.00000
18Dm
10003.00
175.00
1]000.00
i5.
'Oiameler Sewer Monhdx
78
w
230.00
1]94000
1BOA0
14,04000
205.00
2223000
16
' Olametw Oreln Manholes
5
w
MOD
135000
mom
iW0.00
1]5.00
875 DO
12
' Diameter Drain MonMlx
23
w
240.00
882Dm
250A0
5,70000
250.00
5750.00
16
' Diameter Orlin Manhdx
95
w
300.00
28000.00
WOOD
2050000
35000
33,25000
19.
anhole Frams&COven
26
ea
300.00
],00000
'X1000
52m.o0
400.00
11100.00
20,
aMOn Manh0les
2
x
3W.o0
WD.00
200 c0
4Mo0
550.00
1100.00
21
MachlnehMRi
60
s
3000
1 WD.00
100.00
B.m000
6000
3,m0,W
22.
m Mo Trento Pavement
4,350
20D
30,450.00
4 D
11400.00
5.00
21]5000
23,
nent Tnnm Pavement 0hb 9(
525
a
190D
9,97500
20.00
10WD.o0
15.00
84m.0o
24.
pent Tnndh Pavement. All 0 Pmas
2950
LOO
400.00
1300
30,35000
14.00
4130000
25.
camaBeW. FekIix BMUIM
2]00
25D
6,]5000
1.00
2]00.00
001
2].00
26.
aldum ChbMepMCwHrvI
10
tuna
4OOD
4.00000
001
0.10
MOO
8500.00
2].
Ater Dug COMroI
W0o0
al
0.00
3m0.D0
0.001
5000
0.10
5.000.00
TOTAL AMOUM BID
E4 15900
&523330W
28263.42
CITY OF BANGOR, MAINE
Engineering Department
August 5, 1994
To: Members of the City Council
From: James D. Bing, City Engineer
Subject Council Order 94-359, Award of Bid for Fifteenth
Street Sewer Separation Project
On August 3, 1994 three bids were received for the construction
of the Fifteenth Street Sewer Separation project. Attached isa
tabulation of those bids. Me law bid was submitted by Brescia
Construction 1a the amount of $498,159.00, which compares favorably
with our construction estimate of $550,000.00. In 1992, Brescia
Construction completed the Beadowbrook Phase IV Sewer Separation
project for the City, which is very similar in site and complexity.
Their performance was fully satisfactory.
On the basis of their experience Bad the low bid price sub-
mitted, I recommend award of the Fifteenth Street Sewer Separation
project to Brescia construction in the amount of $498,159.00. The
original Council Order was prepared prior to receipt of bids, so I
have attached a revised copy. with the Contractor's name and project
amount.