Loading...
HomeMy WebLinkAbout1994-08-08 94-359 ORDERDoandi Acton Data Lem No. 94-359 hemiSublecL Award of Bid for Construction of Fifteenth Street Sewer Separation Project Fapom ble Department: Engineering Forebear to the requirements of our Consent Decree with BPA. the City of Bangor is continuing its program of sewer a separation a outlined in the CBO Facilities Plan. This Council Order is t and abid for construction of the Fifteenth Street Sewer Separation project, which is a continuation of work done in the Fourteenth Street area last year. Bids will be received on Wednesday, August 3rd. 1994 for this project. Prior to the Council meeting, a tabulation of bide and recommendation for award will be provided. J'hnzga-iS Comments: I I ✓ JL_ �J� / 7k# Sol Qp/� s/iivra Sol il6ErmJ� /U/iC'I'40/81) 444 44) 1?t1AVV" U11k 14 Ae Wq( IV& lF g�/LLen 0./'G Li/off a/arANe/ . Immdaced For hff yw Peirce Pape _ef_ ❑ Fhtt Reeding ❑ Referral I 94-359 Assigned to Councilor (Substitute) CITY OF BANGOR (TITLE,) @rUrf Award f Hid f r,CopsC tion of -Fifteenth Street_ S_wer__.. _. Sepal ti project _ BY the IXN CospeB of the My of Beeper. ORDERED, THJ,T the award of bid is hereby made to Brescia construction, Inc. for the construction of the Fifteenth Street Sewer Separation Project in the amount of $498,159.00. 4sitsedto Conan'lor sxox® August S. 9994-139. 4 CITY OF BANGOR (TiTLE.) @lt*gr, Award of Bid for Construction, of, „Fifteenth. Street Sevex By We City CoymW of the CUP NBa*w.: 08DF=D, TWAT the award of bid 1s hereby made to for the construction of the Fifteenth Street Sewer Separation Project in the amount of IN CITY COUCIL August S, 1994 Passed As Amended by Substitution. l/tmllvg ! pClls .w� � CITYCITY CLQ 94-359 ON D I R Title, ngard p{ .1q4 go; const;ycggqq .4f pAEteentb .Street Sever Separation Project. ...................................... \P Awgodl to A..... !. ............................ Councilman C" OF BANGOR Pagel Mt BIDTABULATON 01E Openly: AWW 3, 1M 15TH STREET SEWER SEPARATION PROJECT Baeada Conalrudbn, Ina Clinton M®le 9E. MacMIIIiW Company, In a Maine CampbdlCdMmction Co. &ewer, Maine ITEM DECRIPTION Ott UNIT Unit Price Hem TOlal Unit Price Rem Total Unit Pace Rem TOW la. rech&8 nal Rock EcaMioni<Wi $0 1W.00 5,Oo0.c0 50.00 3WD.00 ]5.00 3]50.00 lb. ench&Stm ml Ra E aavgion301-500 1 180.00 loom 1M 100 001 001 la ranch& SHw.bnl Rock Excavation (over WO 1 e 100.00 loom LW 1.00 001 0.01 2 ac. EvavaBOn&Re ecementBxkfill 100 1500 1,50D.m 0.01 1.00 25.00 2.500.00 3 ¢aea1mn 80ac IIIEebw nnmal pie 50 10.00 50000 001 0.50 30.00 1,500.00 4. "PVC Sana Sewer 533 If 39.00 20]8)00 Sam 28&50.00 48.20 2A 524.W 5. 14'PVC Samfa $awr%e 545 If 45.00 24,525.00 05.W 35425.00 66.20 Won 6. "PVC 6anlle Sewer 1517 It 61.00 92,00].00 81.00 122077.00 88.20 133]99.40 ]. 0"PVC Storm Onin Pl 45 If 64.00 2800.00 8000 2,70D.00 5920 2,39400 8. T'PVC B[oml Onln 771 100 It 4]00 S.tl29m 6000 8420.00 58.20 822240 9. 'PVC 6tomi 0ni4771 490 If 54.00 2689200 ]000 34,80000 ]02f1 3495960 10. 6' PVC Stwm Omin Pie 1,592 It 5].OD 00,]4400 6000 108259.00 0220 138.82240 H. CHoux Servke talon A1I 31. e%ce Olio 1040 It 43.00 44,nDOD 3000 31,200.00 45.00 48800.00 t2. ' PVC HOUae 6ervix Lalereb glp6L t35 If 58.00 ]Wo.00 3000 4.000 00 55.00 ],425.00 l3. iT' Ca1c58adn Connedlcenb P54851am IXal ] x BN.OD 4,20000 1.00 .00 120000 8,400.00 14. OlameterB Manholes 100 of i80.OD 10.00000 18Dm 10003.00 175.00 1]000.00 i5. 'Oiameler Sewer Monhdx 78 w 230.00 1]94000 1BOA0 14,04000 205.00 2223000 16 ' Olametw Oreln Manholes 5 w MOD 135000 mom iW0.00 1]5.00 875 DO 12 ' Diameter Drain MonMlx 23 w 240.00 882Dm 250A0 5,70000 250.00 5750.00 16 ' Diameter Orlin Manhdx 95 w 300.00 28000.00 WOOD 2050000 35000 33,25000 19. anhole Frams&COven 26 ea 300.00 ],00000 'X1000 52m.o0 400.00 11100.00 20, aMOn Manh0les 2 x 3W.o0 WD.00 200 c0 4Mo0 550.00 1100.00 21 MachlnehMRi 60 s 3000 1 WD.00 100.00 B.m000 6000 3,m0,W 22. m Mo Trento Pavement 4,350 20D 30,450.00 4 D 11400.00 5.00 21]5000 23, nent Tnnm Pavement 0hb 9( 525 a 190D 9,97500 20.00 10WD.o0 15.00 84m.0o 24. pent Tnndh Pavement. All 0 Pmas 2950 LOO 400.00 1300 30,35000 14.00 4130000 25. camaBeW. FekIix BMUIM 2]00 25D 6,]5000 1.00 2]00.00 001 2].00 26. aldum ChbMepMCwHrvI 10 tuna 4OOD 4.00000 001 0.10 MOO 8500.00 2]. Ater Dug COMroI W0o0 al 0.00 3m0.D0 0.001 5000 0.10 5.000.00 TOTAL AMOUM BID E4 15900 &523330W 28263.42 CITY OF BANGOR, MAINE Engineering Department August 5, 1994 To: Members of the City Council From: James D. Bing, City Engineer Subject Council Order 94-359, Award of Bid for Fifteenth Street Sewer Separation Project On August 3, 1994 three bids were received for the construction of the Fifteenth Street Sewer Separation project. Attached isa tabulation of those bids. Me law bid was submitted by Brescia Construction 1a the amount of $498,159.00, which compares favorably with our construction estimate of $550,000.00. In 1992, Brescia Construction completed the Beadowbrook Phase IV Sewer Separation project for the City, which is very similar in site and complexity. Their performance was fully satisfactory. On the basis of their experience Bad the low bid price sub- mitted, I recommend award of the Fifteenth Street Sewer Separation project to Brescia construction in the amount of $498,159.00. The original Council Order was prepared prior to receipt of bids, so I have attached a revised copy. with the Contractor's name and project amount.