HomeMy WebLinkAbout1994-07-11 94-325 ORDERCouncil Action —
CutsJuly 11, 1994
Item No. 94-325
RemiSubject: Award of Bid for Construction of Essex Street Sewer Separation
Project
Responsible Dep:rtmene Engineering
Pursuant to the requirements of our Consent Decree with EPA, the City of Bangor is
continuing r
its program of sews separation as outlined In the CSO Facilities Plan-
Thetotal cost of projects for 1994 is approximately $2.5 million, and Will be
financed from existing funds and an upcoming borrowing from the State Revolving
Loan Fund.
On June 29, 1994 a total of six bids on the Essex Street project were
received
ranging from $292,238.50 to $421,0)3.00.- The estimated construction cost of this
project s $350,000.00. The Essex Street project is Phase VI of ongoing separation
project in the so-called Meadowbroak Sewer Subsection. '
Although Thomas ➢Kenzo, Inc. has mt done any large projects for the City of Bangor
recently. references and qualifications have been thoroughly checked by the
Engineering Dept. and found to be fully acceptable. On this basis, it i
recommended that a bid be aided to Threat, D£Cen , Inc. for the construction
ofthe Essex Street Sewer Separation project for their low bid amount of
$292,238.50. Attached is a complete tabulation of bid proposals received.
tfana3sr a Comments: (uxltj
Invodueed For
O paniece
_ ICD Fitit Resedmil
❑ Fefa:eaP
Nes of_
94-325
Asegned to C mmlor ealdaeci July 11, 1994
CITY OF BANGOR
(TITLE,) (oT]I2Tf Awarded. aid for. Construction of Essex Street sewer Separation
project
By 1he city OWNWO{OJ the Cies of Ba ..
OBDEBBD,
TEAT the award of bid is hereby made to Thecae USCeuzo, Inc. for
the construction of the Essex Street Sever Separation project in the
amount of $292,238.50.
IN CITY COUNCIL 1
July 11, 1994 'A� 94-325
Passeda j 0 R D E A
C Title,
-Award of Bid for Construction of Essen
......................................
Street Sewer Separation Project.
......................................
......VW!C..3�...............
Councilman
ditgof'Pangoc, game
BID AWARD RECOMMENDATION
BIDI (S): Bm505 S S
BODGET REFERENCE:
Foamlar Appmprummas Budget
X_Emerpnse Fuvd Iran
Nmmberof6ids Seo: 9
RdryintionNo. 22874
Budgeced Anmwt00PL NO
Taal Amomt of
Award Recommendation $ 292 238 50
Nwmber of Bids t8eceived: 6
Bid Opening Dace: Ime 29 1994
94-325
CONS:
Award the contract to Thomas DiCenw, Inc. tM low bidder at $292,238.50. This award is made
contingent upon City Council Approval.
Pur ent
CITY OF BANGOR
BIDTABULATION
a ESSE%STREET SL
Page 2 of 2
Bid Opening: June 29, 1994
Thomas DlCerizo, Inc.
Calais, Maine
Brescia Conatrecaon, Inc.
Clinton Maine
Steislden site
E HOMen Maine
ITEM
DECRIPTION
OTY.
UNIT
Una
Price
Item
Total
Unit
Price
Item
Total
Unit
Price
Item
Total
Ia.
Trench & Street. Rock Excay. 1-300 CA
501
ev
I lwwl
7,500.00
150.00
],500.00
0.01
0.50
ih. I
Trench & Street. Rock Excay. 01-500 W
1 I
CIF
1 125.00
125.00
125.00
125.00
0.01
0.01
1c.
Trench & Struct. Rock Excay. lowfff28.00
100.00
MOD
1M OD
100.00
0.01
001
2.
Mum Exrava.&R IacemeM Backfill
15.00
1,500.00
20.00
2,00000
25.00
2,500.00
3.
Fxcay. & Backfill below nomlal ratle
15.00
]50.00
26.00
1,300.00
30.01)
1,500.00
4.
W' PVC Sanaa Sewer Pie
a
45.00
53595.o0
76.00
90,518.00
55.00
65,505.00
5.
1V'PVC Sanaa Sewer Pie
if
49.00
39935.00
79.00
84,305.00
60.00
48,90000
S.
6" PVC Service Laterals
a
20.00
50,598.00
56.00
101182.00
50.00
90,350.00
7.
8" PVC Seryls Latetlal8
a
30.00
1,200.00
58.00
2,320.00
55.00
2,200.00
8.
24" PVC Storm Dlaln Pl a
'f
]500
23,]]5.00
80.00
25350.00
125.00
39625.009.
4' Diameter Sewer Manholes
f
200.00.
20,800.00
18500
19,24000
250.00
20000.0010.
4' Diameter Drain Manholes
f
200.00
2,400.00
180.00
2,160.00
225.00
2700.0011.
5' Diameter Drain Manholes
f
250.00
2]5000
300.00
3,3002]5.12.
Manhole Frames and Coven
a
300.00
3,300.00
250.00
2 ]5000500.00
5,500.00
13.
Tam ora Conecfion to ExisOn Sexers
1,]00.001]00.00
3,500.00
3500.00
2,00000
2,000.00
14.
MOtli Existin Dro Me hOle
Is
1,000.00
1,000.00
2p00.D0
2000.00
1,000.00
1,000.00
15.
Connection to Existin Stone Storm DrainIs
1500.00
1,500.00
3000.00
3,000.00
750.00
]50.00
1B.
Remove Ahantlonse Brick Saxer&Backfil
501
1 20.00
1,00000
115.00
5,750.00
40.00
2000.00
17.
Remove Btkk Distant & Replace Backfill
1751
cy
1 20.00
3p600.
65.00
11,375.00
25.00
4.3]5.00
18.
Tem o2 Trench Pavement
3400
11.25
38250.00
7.15
24,310.00
0.00
2],200. 0
19.
Permanent Inchon Pavememominister Av
80
sy
22.50
1,800.00
18.00
11440.00
15.00
1,200.00
20,
Permanent Trench Pavement -AO other M.
2.750
sy
11.35
31,212.50
15.00
41 250001
12.00
3300D.00
21.
Loom, Seed, Fetlilize&Mulch
16
4.00
1,200.00
4.00
1,200.00
0.00
1000.00
22.
Calcium Chloride Dust Control
5
loos
450.00
225000
800.00
3,000.00
800.00
3000.00
23.
Water Dust Control
25,000
el
0.02
50000
0.00
2000.00
0.04
1.000.00
TOTAL AMOUNT BID
292238.50
U21073.00
365130.52
CITY OF BANGOR Page 1 o42
BID TABULATION Bid Opening: June 29, 199,1
Campbell Canmrumitn
Brewed Maine
Sanner. MacMillan,
Banner. Maine
Co., Inc.
H.E. Cliff ai.re Inc.
Carmel Maine
ITEM
DECRIPTION
QTY.
UNIT
Unit
Pace
Ilam
Tmm'
unn
Price
Item
TONT
Unit
Pace
.Item
Total
Ia.
Trench& SWc1, Rock Excel. 1-300c
W
0.01
0.50
40.00
2,000.00
150.00
7,500.00
lb.
Trench & 59uct. Rock Excay. 01-500
1
60.00
60.00
100.00
100.00
125.00
12500
lc.
Trench& Binned, Rock Extant. (NX)
1
80.00
60.00
100.00
10000
100.00
100.00
2.
Mise. Excava.&R Iacemam Backfill
100
25.00
2500.00
30.00
3000.00
20.00
2000.00
3.
Excay.& Backfill below normal rade
50
30.00
1500.00
001
0.50
25.00
1250.00
4.
8- PVC SanXa Serer Pie
1,191
R
44.60
53,118.80
]].00
91]0].00
66.00
]8,80800
5.
10" WC SanitarySerer Pl
815
R
59.80
/85]4.0
82.00
88830.00
6600
53]90.00
6.
6" PVC Service Late0als
1.807
If
40.00
]2,280.00
2500
45,1]500
35.00
83245.00
].
8" PVC Service Laleaals
40
R
40.00
1,600.00
40.00 1
1,600.00
35.00
i {00.00
B.
24' PVC Noel Drain Pie
317
p
92.80
29,354.20
100.00
31,]00.00
]1.00
2250].00
9.
4Diameter Smear Manholes
104
of
180.00
18,]20.00
180.00
18,]20.00
170.00
1]880.00
10.
4'Diameter Drain Manholes
12
of
1]500
2,100.00
200.00
2,400.00
1]0.00
2,040.00
11.
V Diameter Drain Manholes
11
of
23000
2.53000
300.00
3,300.00
240.00
2,640.00
12,
Manhole Frames and Covers
11
425.00
4,6]5.00
200.00
2,200.00
545.00
5995.00
13.
Temporary ConectlDn to Existin Sewer
1
Is
0.01
0.01
1,00000
1,OW.00
180000
1,800.00
14,
Modify Existing Drop Manhole
1
Is
0.01
0.01
50000 i
500.00
1,ODO.OV
100000
15.
Connection to Existin Stone Storm orcin
1
Is
0.01
0.01
5,00000
5,000.00
WO.W
600.00
16.
Remove Abandoned Bnck Saver &Backe
W
diODD
2.000.00
0.01
0.50
20.00
1000.00
i].
Remove Back Cistern &Replace BackMl
175
1500
2,525.001
0.01
1.15
20.00
3,500.00
18.
Tempoeault Trench Pavement
3,400
a
7.00
21800.001
4.00
13,600.00
4.00
13,600.00
19.
Permanent Trench PavememStillwaler A
W
sy
2100
1.680001
20.00
1,600.00
16.00
126000
20.
Permanent Trench Pavement -All War St.
2700
sy
14.00
3850000
12.OD
33,000.00
12.00
33,000.00
21.
Loam, Send, Fertilize & Mulch
300
sy
0.01
3.00
800
1,80000
1.00
300.00
22.
Calcium Chloride Dust Consul
5
tons
600.00
3,00000
0.01
0.05
555.00
2,825.00
23.
Water Dust Control 1
25,000
got
0.10
2,5MOD
0.01
250.00
0.05
1200.00
TOTAL AMOUNT BID
$311,180.3j
$325.sa,iBc
318933.00