Loading...
HomeMy WebLinkAbout1994-07-11 94-325 ORDERCouncil Action — CutsJuly 11, 1994 Item No. 94-325 RemiSubject: Award of Bid for Construction of Essex Street Sewer Separation Project Responsible Dep:rtmene Engineering Pursuant to the requirements of our Consent Decree with EPA, the City of Bangor is continuing r its program of sews separation as outlined In the CSO Facilities Plan- Thetotal cost of projects for 1994 is approximately $2.5 million, and Will be financed from existing funds and an upcoming borrowing from the State Revolving Loan Fund. On June 29, 1994 a total of six bids on the Essex Street project were received ranging from $292,238.50 to $421,0)3.00.- The estimated construction cost of this project s $350,000.00. The Essex Street project is Phase VI of ongoing separation project in the so-called Meadowbroak Sewer Subsection. ' Although Thomas ➢Kenzo, Inc. has mt done any large projects for the City of Bangor recently. references and qualifications have been thoroughly checked by the Engineering Dept. and found to be fully acceptable. On this basis, it i recommended that a bid be aided to Threat, D£Cen , Inc. for the construction ofthe Essex Street Sewer Separation project for their low bid amount of $292,238.50. Attached is a complete tabulation of bid proposals received. tfana3sr a Comments: (uxltj Invodueed For O paniece _ ICD Fitit Resedmil ❑ Fefa:eaP Nes of_ 94-325 Asegned to C mmlor ealdaeci July 11, 1994 CITY OF BANGOR (TITLE,) (oT]I2Tf Awarded. aid for. Construction of Essex Street sewer Separation project By 1he city OWNWO{OJ the Cies of Ba .. OBDEBBD, TEAT the award of bid is hereby made to Thecae USCeuzo, Inc. for the construction of the Essex Street Sever Separation project in the amount of $292,238.50. IN CITY COUNCIL 1 July 11, 1994 'A� 94-325 Passeda j 0 R D E A C Title, -Award of Bid for Construction of Essen ...................................... Street Sewer Separation Project. ...................................... ......VW!C..3�............... Councilman ditgof'Pangoc, game BID AWARD RECOMMENDATION BIDI (S): Bm505 S S BODGET REFERENCE: Foamlar Appmprummas Budget X_Emerpnse Fuvd Iran Nmmberof6ids Seo: 9 RdryintionNo. 22874 Budgeced Anmwt00PL NO Taal Amomt of Award Recommendation $ 292 238 50 Nwmber of Bids t8eceived: 6 Bid Opening Dace: Ime 29 1994 94-325 CONS: Award the contract to Thomas DiCenw, Inc. tM low bidder at $292,238.50. This award is made contingent upon City Council Approval. Pur ent CITY OF BANGOR BIDTABULATION a ESSE%STREET SL Page 2 of 2 Bid Opening: June 29, 1994 Thomas DlCerizo, Inc. Calais, Maine Brescia Conatrecaon, Inc. Clinton Maine Steislden site E HOMen Maine ITEM DECRIPTION OTY. UNIT Una Price Item Total Unit Price Item Total Unit Price Item Total Ia. Trench & Street. Rock Excay. 1-300 CA 501 ev I lwwl 7,500.00 150.00 ],500.00 0.01 0.50 ih. I Trench & Street. Rock Excay. 01-500 W 1 I CIF 1 125.00 125.00 125.00 125.00 0.01 0.01 1c. Trench & Struct. Rock Excay. lowfff28.00 100.00 MOD 1M OD 100.00 0.01 001 2. Mum Exrava.&R IacemeM Backfill 15.00 1,500.00 20.00 2,00000 25.00 2,500.00 3. Fxcay. & Backfill below nomlal ratle 15.00 ]50.00 26.00 1,300.00 30.01) 1,500.00 4. W' PVC Sanaa Sewer Pie a 45.00 53595.o0 76.00 90,518.00 55.00 65,505.00 5. 1V'PVC Sanaa Sewer Pie if 49.00 39935.00 79.00 84,305.00 60.00 48,90000 S. 6" PVC Service Laterals a 20.00 50,598.00 56.00 101182.00 50.00 90,350.00 7. 8" PVC Seryls Latetlal8 a 30.00 1,200.00 58.00 2,320.00 55.00 2,200.00 8. 24" PVC Storm Dlaln Pl a 'f ]500 23,]]5.00 80.00 25350.00 125.00 39625.009. 4' Diameter Sewer Manholes f 200.00. 20,800.00 18500 19,24000 250.00 20000.0010. 4' Diameter Drain Manholes f 200.00 2,400.00 180.00 2,160.00 225.00 2700.0011. 5' Diameter Drain Manholes f 250.00 2]5000 300.00 3,3002]5.12. Manhole Frames and Coven a 300.00 3,300.00 250.00 2 ]5000500.00 5,500.00 13. Tam ora Conecfion to ExisOn Sexers 1,]00.001]00.00 3,500.00 3500.00 2,00000 2,000.00 14. MOtli Existin Dro Me hOle Is 1,000.00 1,000.00 2p00.D0 2000.00 1,000.00 1,000.00 15. Connection to Existin Stone Storm DrainIs 1500.00 1,500.00 3000.00 3,000.00 750.00 ]50.00 1B. Remove Ahantlonse Brick Saxer&Backfil 501 1 20.00 1,00000 115.00 5,750.00 40.00 2000.00 17. Remove Btkk Distant & Replace Backfill 1751 cy 1 20.00 3p600. 65.00 11,375.00 25.00 4.3]5.00 18. Tem o2 Trench Pavement 3400 11.25 38250.00 7.15 24,310.00 0.00 2],200. 0 19. Permanent Inchon Pavememominister Av 80 sy 22.50 1,800.00 18.00 11440.00 15.00 1,200.00 20, Permanent Trench Pavement -AO other M. 2.750 sy 11.35 31,212.50 15.00 41 250001 12.00 3300D.00 21. Loom, Seed, Fetlilize&Mulch 16 4.00 1,200.00 4.00 1,200.00 0.00 1000.00 22. Calcium Chloride Dust Control 5 loos 450.00 225000 800.00 3,000.00 800.00 3000.00 23. Water Dust Control 25,000 el 0.02 50000 0.00 2000.00 0.04 1.000.00 TOTAL AMOUNT BID 292238.50 U21073.00 365130.52 CITY OF BANGOR Page 1 o42 BID TABULATION Bid Opening: June 29, 199,1 Campbell Canmrumitn Brewed Maine Sanner. MacMillan, Banner. Maine Co., Inc. H.E. Cliff ai.re Inc. Carmel Maine ITEM DECRIPTION QTY. UNIT Unit Pace Ilam Tmm' unn Price Item TONT Unit Pace .Item Total Ia. Trench& SWc1, Rock Excel. 1-300c W 0.01 0.50 40.00 2,000.00 150.00 7,500.00 lb. Trench & 59uct. Rock Excay. 01-500 1 60.00 60.00 100.00 100.00 125.00 12500 lc. Trench& Binned, Rock Extant. (NX) 1 80.00 60.00 100.00 10000 100.00 100.00 2. Mise. Excava.&R Iacemam Backfill 100 25.00 2500.00 30.00 3000.00 20.00 2000.00 3. Excay.& Backfill below normal rade 50 30.00 1500.00 001 0.50 25.00 1250.00 4. 8- PVC SanXa Serer Pie 1,191 R 44.60 53,118.80 ]].00 91]0].00 66.00 ]8,80800 5. 10" WC SanitarySerer Pl 815 R 59.80 /85]4.0 82.00 88830.00 6600 53]90.00 6. 6" PVC Service Late0als 1.807 If 40.00 ]2,280.00 2500 45,1]500 35.00 83245.00 ]. 8" PVC Service Laleaals 40 R 40.00 1,600.00 40.00 1 1,600.00 35.00 i {00.00 B. 24' PVC Noel Drain Pie 317 p 92.80 29,354.20 100.00 31,]00.00 ]1.00 2250].00 9. 4Diameter Smear Manholes 104 of 180.00 18,]20.00 180.00 18,]20.00 170.00 1]880.00 10. 4'Diameter Drain Manholes 12 of 1]500 2,100.00 200.00 2,400.00 1]0.00 2,040.00 11. V Diameter Drain Manholes 11 of 23000 2.53000 300.00 3,300.00 240.00 2,640.00 12, Manhole Frames and Covers 11 425.00 4,6]5.00 200.00 2,200.00 545.00 5995.00 13. Temporary ConectlDn to Existin Sewer 1 Is 0.01 0.01 1,00000 1,OW.00 180000 1,800.00 14, Modify Existing Drop Manhole 1 Is 0.01 0.01 50000 i 500.00 1,ODO.OV 100000 15. Connection to Existin Stone Storm orcin 1 Is 0.01 0.01 5,00000 5,000.00 WO.W 600.00 16. Remove Abandoned Bnck Saver &Backe W diODD 2.000.00 0.01 0.50 20.00 1000.00 i]. Remove Back Cistern &Replace BackMl 175 1500 2,525.001 0.01 1.15 20.00 3,500.00 18. Tempoeault Trench Pavement 3,400 a 7.00 21800.001 4.00 13,600.00 4.00 13,600.00 19. Permanent Trench PavememStillwaler A W sy 2100 1.680001 20.00 1,600.00 16.00 126000 20. Permanent Trench Pavement -All War St. 2700 sy 14.00 3850000 12.OD 33,000.00 12.00 33,000.00 21. Loam, Send, Fertilize & Mulch 300 sy 0.01 3.00 800 1,80000 1.00 300.00 22. Calcium Chloride Dust Consul 5 tons 600.00 3,00000 0.01 0.05 555.00 2,825.00 23. Water Dust Control 1 25,000 got 0.10 2,5MOD 0.01 250.00 0.05 1200.00 TOTAL AMOUNT BID $311,180.3j $325.sa,iBc 318933.00