HomeMy WebLinkAbout1995-08-14 95-368 ORDERCOUNCU. ACTION
Date: 08-14-1995 Item No.: 95-368
ftem/Subject: AwmdofBidfor Poplar Street Sewer Separation Project
Responsible Department: Engineering
Co IMCVU y:
On August 2, 1995 bids were received for the Poplar Street Sewer Separation Project This
project is a comirmation of a series of separation projects in the so�calied Arctic Brook Subsection,
which is repaired by the EPA Consent Decree.
Attached is a tabulation of bids received. The low bid submitted by Louis Silver, fee. compares
favorably with our engineering estimate of$177,900 M. Bid nomad to Louis Silver, Inc. is recommended.
Silver has previously completed similar City projects including the but Arctic Brook Project with fully
satisfactory results.
Managers Comments:/] p r— ,s,pptddgj>. � ko Ae
Ab
M
Associated IrSormetim:Q
Budget Approval:
a Fin
I.egel Approval:. J
drySNldmr
Intro For:
Pa sage
❑ Frst heading
Referral
Page of
95-368
Aoigned to Cowedor Baldacci August 14, 1995
_ CITY OF BANGOR
(TITLE.) (OrDPr, AwardoflLdfor POp'ar5 et S5 w Sel)UWon Project ........... ...
BY aty Caunalt oft aty OfDaapor:
ORDERED,
MT the award of bid is hereby made ro Louie Silver, Inc. for the Poplar Street Sewer
Separation Project in the amaun[ of$154,M.55.
�o
IN C3TY'-COUNCIL 95-368
August,14, 1995- 0 R 0 E R
P e i
-Title, Award of Bid for Poplar Street
CITY E Sewer Separation Project. -
.........�......:...:.......... ..."Igmed to
...
� t
... ...:
CITT OF BANGOR Page 1 of I
BIO TABULATION Bitl Opening: / gust 2,1995
POPLAR STREET SEWER SEPARkTION PROJECT _- -I u, hIBIothersln0. ¶14C. a!IT&6onglnc-� gDa ConsVucllon, In
ITEM
2
3
4,
5.
6,
],
&
B.
10.
DECRIPTION
Mac Excavatiotnr&Reda emenY Oackfll
ExeavaYion Below NOlmal Gratle80acklill
4' VC Banila Sewer Pl e
10"PVC Banila 6ewe/Pi a
b"PVC House 6ervlce laterals
10"PVC SIorm Drain Pl
iS"PVC SIomr Drain Ple
4'Dlameler Sewer ManM1alea
5' Iameler Sewer m Manholes
OTY UNIT
280 II/
2fi6 d1
650 II
528 I!
162 If
3]T II
83 vl
9 vl
31 N
8 e
_ T e
__1 e_
1 ea
1.424_].OD
1.424
�W023 y
25_�OD I 9--
Orono. main e
Unit
Pllce
25.00
38.00
90.00
35.00
4000
54.00
190.00
25000
200.00
300.00
3W.o0
325.0032500
2000U
f9.00
1
O�U1
Item
Tdal
12000.00
10,10800
26000.00
18,480.OD
�_T6000
2035800
Yt 9]O.CO
2.125.00
8200.00
2480.00
600.00
200.00
9960 b0_1.W
1B 9311.00
1534.60
25000
Ham tlan Maine
Unil
Ptice
12.00
4].00
4500
40.00
93CO
600
220.00
300.00
1200.00=.200.04
900.00
400.Oo
_450.00_
250 C0
1 W
400
00
-X00.03
_
-Item
Total
996000
12,50200
295000
21.40.00
]82600
2i 86600
1386000
355000
3.200.00_
80000
950;00
2504U
id24.00
213600M1_
409200
2 ]SO.OU
Carmel Maine
Unit
Pace
'20.00
40.00
4500
4000
40.00
60.00
20000
24000
SW.oO
400.00
40800
_Q00.00
900.00
3_00
15.00
300
3 006
_
Item
Total
26600.D3
10,640.Oo
28250.00
21120.00
]28000
2262000
1T 60000
2090.00
6500.00
3200.00
400.00
40000
400.00
896000
215fi000
30690.-40000
1 5000
mon
Unil
Prlce
P.W
49.00
59.00
45.00
59.00
8].00
19000
20000
300.00
45000
950.00
550.00
40000
].00
1800
.OS
Item
Telal
10360.00
13009.00
383 .
23 )60,BO
10 338.00
25.259.00
),0011
1300.00
4300.00
380000
rr550.00
550.00
900.00
9966.00
25,6200
.045.00
2008.00
1250.
12. R made BrD'as osaM of Fastin CatclhLasn
13, Manuole Flames B Covea
f4. Drain Manuole Fremas&Covers
15. CalcM1basln FrameaBCovers_
i6. Coachman
Frames80over
f emWrerY tench avemenl
0. Permanent TrencM1 Pavement
i9 Loam Beef r1111ze8MuliM1
20 calcium CMomle Dust Conlml
22 vTatar DTmrof --"
TO AL MOUM BID
154044.55
P321000
1031fi]OB
193 ]63.00