Date: 08-I4-1995 Ihm No.: 95-367
Item/Subject Award of Bid for 1995 Street Paving and Rehabilitating Contract
BespombleDepartment: Bngmeeung
Commentary:
Bids were recently received for our annual Street Paving and Rehabilitation Contract. A
tebalatiov of bids u attached. The progam includes work on 47 different streets involving Community
Development eligible areas. the Padr Woods Area, repaving sncets affected by lest years CSO projects,
and nrme nous other sm ets thmushout the City. The connact includes street overlays, grinding and
repaving and reclamation. We have also made changes to We years connect to now include street line
Pauling beauteous of adhesive Plastic film tum arrows, and paving of side street and driveway
approaches. This additional work has historically been doge by Public Work&
The unit paces received for paving no severs dollars per ton higher than last your, but comparable to
prices being seen by MDOT and other communities in this area. Tbey are also close to the levels we
were paying 4 to 5 years ago. This increase is primarily due to higher aspbat prices this year. It should
be noted tbn we received a very low price last your from Centra Maine paving who was anidous to
become established in the mea. CMI+ has since been acquired by B e Paving, arykwastlashe
bidderthisyen. (Atncbedshcet) v)
l
aMenr Heod
Managers Commems:
� Pa�nw-&m, n 46
O1DA
Ar
Associated SMnm
orGev:On�u,
Budge Approval:
Legs Approval:
CirySgliclme
Iv Vo cod For.
�f Passage
❑ First Reading
❑ Referat
Page of
95-36]
The City I ngvseer has contacted the low bidder, Lave Connection, to discuss options to
achieve savings. Lane has indicated that they are willing to execute a change order that
would reduce the paving price by $1.05turn ff a small percentage of recycled aggregate
(from Winding City strcets) is allowed. This has been done by MOOT with fully
satisfactory results, and is recommended by the Public Services Department.
Total available funding for the 1995 program from Community Development Genual
Fund, Sewer Fond, 1995 CSO Projects, and Iv1DOT Nrglwity Block Good is
$952,687.00. The difference between this and the contract summer is adequate to cover
costs of preparatory work, inspection, administration, and allow a reasonable coningeacy.
Bid award to Lane Construction is recommended.
James D. Ring
95-36)
MaignN to CaweYar Soucy August 14, 1995
CITY OF BANGOR
(TITLE.) (Dr31BTa Awwol oMd for 19" Street Paying and Rehabilitation Contract
BY tae C1ty Cased of at can ofBaa➢or.
ORDERED•
TUT the award ofbid is hereby made to Lane Commutdon for 1995 Sued Paving and
Rehabilitation in the amoaot ofM61,0QJ0.
IN CITY COUNCIL:
August 14, 1995
Pa e
'CITYBRK, .
95-36]
ORDER
Title, Award of Bid for 1995 Street Paving
and Rehabilitation Contract.
......................................
'OJu O'
A F® to
Cowcilman
CITY OF BANGOR - Page 1 of 1
BID TABULATION Bid Opening: August 2, 1995
STREET PAVING & REHABILITATION
anti Construction Corp.
Barrett Paving Materials
Ban or, Maine
Dover-Foxcroft Maine
Unit Item
Unit Item
ITEM DECRIPTION OTY. UNIT
Price Total
Price Total
COMMUNITY DEVELOPMENT PROJECTS
18. Bituminous Concrete Pavement
4,303
in
30.30
130,380.90
32.40
139,417.20
1b. Bituminous Tack
21100
A
3.00
630000
3.25
6825.00
OTHER CITY STREETS
2a. Bituminous Concrete Pavement
12,600
In
29.85
376,110.00
32.00
403200.00
2b, Cold Planin Pavement Service
15360
s
145
22272.00
1.70
3.25
26,112.00
20,800.00
2c. Bituminous Tack
6,400
at
3.00
1920000
_
2d. In Place Reclamation
9 000
_
2.35
21 1'S 0
2.50
22,500.00
2e. Ad'uslmenl of Catch Basin & Manholes
25
ea
500.00
12, 00 00
450.00
i t 250.00
2f. Plastic Markin Film, Arrows B Words
2,900
at
12.00
34,800.00
9.00
26,100.00
2 Plastic Markin Ta e4"witle
2000
If
_
3.00
60� 0_0.00
2.00
4,000.00
2h. Plastic Markin Ta e24"wide
2400
If
12.00
28,800.00
10.50
25200.00
2i. 4" Painted FasI Dry Traffic Lineswhite
1_250
If
0.25
312.50
0.20
250.00
2':, 4"Paiinled EastD Traffic Lines Yellow
12900
If
0.25
3225.00
0.20
2580.00
5661050.40
688234.20
TOTAL AMOUNT BID