Nem/Subjeed: Application for Utility location Permit
- -
Bangor Hydra-Electric Company
NuponsiMe OeprttmBnL City Clerk
Commentary:
Application for Utility Lucatlon Permit:
SYLVAN PD.. one pole to be placed on the northerlyside, approximately
1,020 it westerly of the junction of Bogan
M.
No Public Notice of this application to be
made
Mpmmev[Hevd
Manager's Comment:
Ciry Mavgb
Associated lniorrrndon: Q,t},N„ 1 U
Budget Approval:
fiwace Lenc[m
Leal Approsal:/CWn Ci 10f fOl3 fA and jy lti
- fM_
Y'aw� N [en flitf 0/1 t•i P5 f�tM-
Gry SWxitor
Inradueed Fort�aw�y
�Persa%
❑Firrt Ratlin9 _ Pege_of_
❑ Referral
95-323
Aaipndtof:d kw Haldacci July 24, 1995
CITY OF BANGOR
(TITLE.) (Orber,_Application f r,U,tilicy Location Pettit -_Dengue. Hydra-
Elect
ydra .....
Elect 1 Comp„ny.,._.,.„.
BY (” coy Coastal Of W aft p(Barypr:
ORDERED,
Ti T the attached application for utility location permit is hereby
granted upon condition that the pole be numbered.
Note: Following are the public streets and highways referred to:
Sylvan Rd. one pole to be placed on the northerly side. approximately
1.020 it westerly of the junction of Eagan M.
No Public Notice of this application to be made.
IN CITY COUNCIL
Jay 24,, 1993.
Passed 95-323
Councilors Cohen d 0 R D E R
bsta ed
Title,
CITY LEHIL B2angor[Rydro-BlectrQCY.YOWCygq, paT01[
Ha¢ga[ Nyd[o-81ect[ic Company
�..,. �.....�..... ............ ....
✓��
Assigned to
Councilman
95-323
FORM 432A 1BANG0R5047
APPLICATION POR UTILITY LOCATION PERMIT PLAN p 1877
TO: Bangor City Council - City of Bangor
BANGOR HYDRO -ELECTRIC COMPANY, a Maine corporation being duly
authorized pursuant to the laws of the State of Maine to generate,
sell, distribute and supply electricity in the City of Bangor,
County of Penobscot, State aforesaid, hereby applies for a permit to
authorize it to locate, construct, maintain and operate certain of its
facilities hereinafter described upon, along, over and across certain
public ways situated in said City of Bangor.
No public notice of this application will be made in accordance
with the terms and conditions of Title 35-A, Section 2503, MRSA as
amended.
LOCATION:
SYLVAN RD, one pole to be placed on the northerly aide, approximately
1,020 ft westerly of the junction of Rogan Rd.
DESCRIPTION:
The facilities will consist of a line composed of wood Poles and
supports therefor, c mand/or cables together with
associated appurtenances. Thwires
The clearance of the wires and/or
cables, other than guywires, will be at least eighteen feet over
the public way. The poles will be set within the limits of the public
way, but outside the part thereof customarily used for travel by
vehicles. The initial operation of the facilities will be at 7200/12470
volts, three phase; the voltage will be increased as occasion
therefore requires for the operation not in excess of 20 Rv to ground.
Dated at Bangor, Maine BANGOR IYDRO-ELECTRIC CO
on June 30, 1995. By:
n nen Tuc cer
T a and Distribution
Job Coordinator
95-323
18ANGOR5047
UTILITY LOCATION PERMIT
PLAN q 1877
:tion of BANGOR HYDRO -ELECTRIC COMPAMY dated
sting permission to locate certain of its
r described upon, along, ever and across certain
.ty of Bangor, County of Penobscot,
1s set forth in its application, no newspaper
my to locate, construct, maintain and operate certain of
ities hereinafter described upon, along, over and across
c ways situated insaid municipality as hereinafter set
permit is granted subject to the provisions that any per
or corporation owning property within the subject munrc
abuts the applicable wav may file a written obiection w
by
or my regiscerea or
LOCATION:
SYLVAN RD, one pole to be placed on the northerly side, approximately
1,020 ft westerly of the junction of Hogan Rd.
DESCRIPTION:
The facilities will consist of a line composed of wood poles and
supports therefor, c wires and/or cables together with
associated appurtenances. The
minimum clearance of the wires and/or
cables, other than guy wires, will be at least eighteen feet over
the public way. The poles will be set within the limits of the public
ay, but outside the part thereof customarily used for travel by
vehicles. The initial operation of the facilities will be at 7200/12470
volts, three phase; the voltage will be increased as occasion
therefore requires for the operation not in excess of 20 Rv to ground.
Authorizing signature(s)
Received and Recorded in
Book ,Page Dated at ,ME,
on
Attest: This Day of ,19
BANGOR
PAGE—GF—
DATE, 6/26/95
PILE PERMIT PLAN
END, JL CAU JL
PHASE ]2/i?4? KV
PLAN« 1677 µ7
4
2
Sylvnu Ro z38
,N
�
a
J
1
W