Loading...
HomeMy WebLinkAbout1995-07-24 95-323 ORDERInradueed Fort�aw�y �Persa% ❑Firrt Ratlin9 _ Pege_of_ ❑ Referral New 07-24-1995 Item No. 95_323. Nem/Subjeed: Application for Utility location Permit - - Bangor Hydra-Electric Company NuponsiMe OeprttmBnL City Clerk Commentary: Application for Utility Lucatlon Permit: SYLVAN PD.. one pole to be placed on the northerlyside, approximately 1,020 it westerly of the junction of Bogan M. No Public Notice of this application to be made Mpmmev[Hevd Manager's Comment: Ciry Mavgb Associated lniorrrndon: Q,t},N„ 1 U Budget Approval: fiwace Lenc[m Leal Approsal:/CWn Ci 10f fOl3 fA and jy lti - fM_ Y'aw� N [en flitf 0/1 t•i P5 f�tM- Gry SWxitor Inradueed Fort�aw�y �Persa% ❑Firrt Ratlin9 _ Pege_of_ ❑ Referral 95-323 Aaipndtof:d kw Haldacci July 24, 1995 CITY OF BANGOR (TITLE.) (Orber,_Application f r,U,tilicy Location Pettit -_Dengue. Hydra- Elect ydra ..... Elect 1 Comp„ny.,._.,.„. BY (” coy Coastal Of W aft p(Barypr: ORDERED, Ti T the attached application for utility location permit is hereby granted upon condition that the pole be numbered. Note: Following are the public streets and highways referred to: Sylvan Rd. one pole to be placed on the northerly side. approximately 1.020 it westerly of the junction of Eagan M. No Public Notice of this application to be made. IN CITY COUNCIL Jay 24,, 1993. Passed 95-323 Councilors Cohen d 0 R D E R bsta ed Title, CITY LEHIL B2angor[Rydro-BlectrQCY.YOWCygq, paT01[ Ha¢ga[ Nyd[o-81ect[ic Company �..,. �.....�..... ............ .... ✓�� Assigned to Councilman 95-323 FORM 432A 1BANG0R5047 APPLICATION POR UTILITY LOCATION PERMIT PLAN p 1877 TO: Bangor City Council - City of Bangor BANGOR HYDRO -ELECTRIC COMPANY, a Maine corporation being duly authorized pursuant to the laws of the State of Maine to generate, sell, distribute and supply electricity in the City of Bangor, County of Penobscot, State aforesaid, hereby applies for a permit to authorize it to locate, construct, maintain and operate certain of its facilities hereinafter described upon, along, over and across certain public ways situated in said City of Bangor. No public notice of this application will be made in accordance with the terms and conditions of Title 35-A, Section 2503, MRSA as amended. LOCATION: SYLVAN RD, one pole to be placed on the northerly aide, approximately 1,020 ft westerly of the junction of Rogan Rd. DESCRIPTION: The facilities will consist of a line composed of wood Poles and supports therefor, c mand/or cables together with associated appurtenances. Thwires The clearance of the wires and/or cables, other than guywires, will be at least eighteen feet over the public way. The poles will be set within the limits of the public way, but outside the part thereof customarily used for travel by vehicles. The initial operation of the facilities will be at 7200/12470 volts, three phase; the voltage will be increased as occasion therefore requires for the operation not in excess of 20 Rv to ground. Dated at Bangor, Maine BANGOR IYDRO-ELECTRIC CO on June 30, 1995. By: n nen Tuc cer T a and Distribution Job Coordinator 95-323 18ANGOR5047 UTILITY LOCATION PERMIT PLAN q 1877 :tion of BANGOR HYDRO -ELECTRIC COMPAMY dated sting permission to locate certain of its r described upon, along, ever and across certain .ty of Bangor, County of Penobscot, 1s set forth in its application, no newspaper my to locate, construct, maintain and operate certain of ities hereinafter described upon, along, over and across c ways situated insaid municipality as hereinafter set permit is granted subject to the provisions that any per or corporation owning property within the subject munrc abuts the applicable wav may file a written obiection w by or my regiscerea or LOCATION: SYLVAN RD, one pole to be placed on the northerly side, approximately 1,020 ft westerly of the junction of Hogan Rd. DESCRIPTION: The facilities will consist of a line composed of wood poles and supports therefor, c wires and/or cables together with associated appurtenances. The minimum clearance of the wires and/or cables, other than guy wires, will be at least eighteen feet over the public way. The poles will be set within the limits of the public ay, but outside the part thereof customarily used for travel by vehicles. The initial operation of the facilities will be at 7200/12470 volts, three phase; the voltage will be increased as occasion therefore requires for the operation not in excess of 20 Rv to ground. Authorizing signature(s) Received and Recorded in Book ,Page Dated at ,ME, on Attest: This Day of ,19 BANGOR PAGE—GF— DATE, 6/26/95 PILE PERMIT PLAN END, JL CAU JL PHASE ]2/i?4? KV PLAN« 1677 µ7 4 2 Sylvnu Ro z38 ,N � a J 1 W