HomeMy WebLinkAbout1995-01-09 95-77 ORDER'f
w0143-1995
Date
IIBm N0. 95-77
Item/Bebjxtl.. Application for Utility Location Permit
- Bangor Hydro-83ectric Co.
Respo:Wble Department City Clerk
Commentary:
Applicati a for Utility Location Permit
Judson Blvd, one pole to be placed on the
northerly aide.
apprGAivately 121 feet southwesterly from
the junction of
Lasalle Dr.
)aepartmemNeed
Manager's Comments:
Gy Mnnvgtr
lVwciatad lnfWmaUW: ORDER. APPLICATION. PERMIT, MP
Budget Approval:
FienWe pirrsmr
Legal Approval:
4aA 6b +-,
,lR 1Tyles Om
s)wlA �YQ,Ad f l
In�troduced Far Lfia• . w -y
Pa Sm Wge -
❑First Reading paw -01_
❑ Referral
95-77
Aeripmd to Councilor Frankel January 23, 1995
CITY OF BANGOR
(TITLE)0rb9ra....._APvliamhiaa..laC.Qtility Lpcat ian..eeimit ..Baneoz. Hydzp- _...
..- .... .._.__ E1 ... 1 .Cin..a Y _. _.. _...
By IM Wv eo of My of Banner.
ORDERED,
THAT the attached application for Utility Location is hereby
granted open condition that the poles be numbered.
Note: Following are the public sheets and highways referred to:
JUDSON BLVD, one pole to be placed on the northerly aide,
approximately 121 feet southwesterly from the junction of Lasalle
➢r.
No public Notice of this application to be made.
95-77
ORDER
IN CITY COUNCIL
January 23, 1995 Title,
Passed
(Councilors Cohen d Tyler gpplicatlon £or Utility Loca
bse �ined)
...............k3W R4991t
9/C - Bangor Hydro -Electric Company. -
CITY CL "K
a
.04. .... geed to
.. ....
n
FORM
432A
IBANGOR4130
APPLICATION
FOR UTILITY
LOCATION PERMIT
PLAN S 1796
TO:
Bangor
City Council
- City of
Bangor
BANGOR HYDRO -ELECTRIC COMPANY, a Maine corporation being duly
authorizedpursuant to the laws of the State of Maine to generate,
sell, distribute and supply electricity in the City of Bangor,
County of Penobscot, State aforesaid, hereby applies for a permit to
authorize it to locate, construct, maintain and operate certain of its
facilities hereinafter described upon, along, over andacrosscertain
public ways situated in said City of Bangor.
No public notice of this application will be made in accordance
with the terms and Conditions of Title 35-A, Section 2503, MRSA as
LOCATION:
THIS APPLICATION CANCELS AND REPLACES UTILITY LOCATION PERMIT $1793
DATED 01/10/95.
JUDSON BLVD, one pole to be placed on the northerly side,
approximately 121 feet southwesterly from the junction of LaSalle Dr.
DESCRIPTION:
The facilities will consist of a line composed of wood poles and
supports therefor, crossarms, wires and/or cables together with
associated appurtenances. The minimum clearance of the wires and/or
cables, other than guywires, will be at least eighteen feet over
the public way. Me poles will be set within the limits of the public
way but outside the part thereof customarily used for travel by
vehicles. The initial operation of the facilities will be at 7200/12470
volts, three phase; the voltage will be increased as occasion
therefore requires for the _operation not in excess of 20 RV to ground.
noted at Bangor, Maine BANfGA�R-HY 0-EI3�CPRIC COMPANY
on January 17, 1995. By.
SteprAn A. Tucker
Transmission and Distribution
- TOD Coordinator
95-77
1BANGOR4130
UTILITY LOCATION PERMIT
PLAN 0 1796
Upon the application of
January 17, 1995, requesting
facilities hereinafter descr
of
cause of the objection and to be served by
registered or certified mail.
LOCATION:
THIS APPLICATION CANCELS AND REPLACES UTILITY LOCATION PERMIT 01793
DATED 01/10/95.
JUDSON BLVD, one pole to be placed on the northerly side,
approximately 121 feet southwesterly from the junction of LaSalle Dr.
DESCRIPTION:
The facilities will consist of a line composed of wood Poles and
supports therefor, crossarms, wires and/or cables to tier with
associated appurtenances. The minimum clearance of thesand/or
cables, ether than guy wires will be at least eighteen feet over
the public way. The poles will be set within the limits of the public
way, but outside the part thereof customarily used for travel by
vehicles. The initial operation of the facilities will be at 7200/12470
volts, three phase; the voltage will be increased as occasion
therefore requires for the operation not in excess of 20 EV to ground.
Authorizing signature(s)
Received and Recorded in
Book ,Page Dated at ,ME,
on ,19_
Attest: This Day of - -'19—
Clerk
19_c er o
BANGOR
POLE PERMIT PLAN
3 PHASE 2/12.47 KV