HomeMy WebLinkAbout1996-01-08 96-80 ORDERCOUNCIL ACTION
Date: 1-8-96 Item No90-80
Item/Rubject: ORDER, Directing the City Manager Not to Privatize
the Maintenance of the City's Fire Alarm, Traffic
Signal, and Street Light Systeme
Rasponaible Department: City Manager
commentary: The City issued requests for proposals in November for the
maintenance of the City's Fire Alarm, Traffic Signal, and Street Light
systems. No responses were received to our requests for fire alarm
maintenance and traffic signal maintenance. Potential bidders were
enn
acted regarding the reasons for their decision not to submit
proposal. The comments which were made are Summarized on the attached
memorandun from the Purchasing Agent.
Several proposals were received for Street Light Maintenance. The
lowest cost proposal was free S/L Construction of Augusta in the amount
of 572,000. This is within $2,500 of the City's estimated annual costs
of 595,379. Staff recommended that this proposal not be accepted due to
the potential additional costa associated with extra work since much of
this extra work is already included in the City's cost figure. in
addition, staff and cost reductions within the Electrical Division
cannot be accomplished sufficient to offset the costs of this program as
long as the City remains responsible for the other work of the Division
such as traffic signal and fire alarm maintenance.
At its last meeting, the Finance Committee reviewed these proposed areae
for privatization and also recommended we not proceed.
Manager's Comments:
t
riTY nm Nd.
Associated Information:
Purchasing Agent's memo, letter from nInstitute,
bid tabulation for street light maintenance
NANre
Legal Approval:
t
T
—zntroduced For
_Zpassage
_ First R6adin9 Pagaof
Referral
m
Assigned eo Camda Poppet Jenuary 8, 1196
CITY OF BANGOR
(TITLE.) Mrbert ... _._. hirecting the.. city. manager. Not toprivatize
the Maintenance of the City's Fire Alarm, Traffic Signal, and
Street Light Systema
avow City CoueoS of ON city "a"Ver.,
ORDERED,
THAT the City Manager not proceed with the potential
privatization of the City's Fire Alarm, Traffic Signal, and
Street Light Maintenance.
1 IN.CITY Wll1996
..
80
dasszd B, 1996-
_
R D
O ADE R
Passed-
_
Titl • Directing the City Manager Not
CITY CLERPi-
to Privatize the Maintenance of the
- -
City's P1re Traffic glgml. and
-
Street Light Systema. _
-
_
.............. . ....
�I....gip.............Auedgned
LNµ✓^KN.
to
.... • �Cuuncilaao.
9
96-80
Memorandum
To: Fimmce CommoseM bers
From: David N. Pellegrino, PurclmsingAgent
Dare: 1212911995
Subject: Pnvemom mofFire Alarm, Trafc5lgnalandSheetLight Maintenance Services
Reamers for Proposals were issued in November for each of the maintenance
hems noted above. Pre -proposal meetings were also held with prospective proposers to answer
questions and clarify the City's requirements. All requests for changes in the RFP were discussed
and agreed upon among the individuals spending the meetings.
We received no response to our requests for fere almm maintenance and traffic
signalmaintenance We did receive three proposals for street tight maintenance and a bid
tabulation is attached. I have called a number of the companies solicited to determine wiry they
did not respond to the fire alarm and track signal RFPs. Excerpts are as follows:
Fin Adamn Maintenance
RFP:
• scot my normal scope of work
• the condition of the system was questionable
• being responsible for the conduits was too much of a gamble
• since the City requested as somal lump arm amount it was an
"opportunity to loose money"
• the reponse time was too restrictive
Traffic Shoal Maintenance RFP:
• see attached letter firm Sorry Institute
• Bangor Hydro
a. the economics didnt work
b. the liability exposure was too great
c certification oftechtdcams would take throe years
d. traffic signal maintenance is not our primary responsibility and in an
emergency situation our priority would have to be electrical service.
• A.D. Electric - SabatNs, Maine
atheconditionsoftlml2FPweretoorestrictive
b. the response time should be 24 hours not one how
c, the system needs major maintenance (over 100 loops not working).
d. there is no nceA to have IMSA certified technicians
e. you have 10 restrict our liability exposure
am
13
f if you went through the entire system and brought everything up to par,I
would be interested.
• Rearie Light Company- Cape Neddick, Maine
a. response time impossible for us to meet
b. most of our work is in southern Maine and it would not pay for us to
locate an employee and abucket truck in Bangor.
c. you would have to drop the certification and professional engineer
requirement
d. would have to extend the response time
e. even with the above agreed upon l may not respond because you are too
far away.
The proposals for Street Light Maintenance were reviewed win U Barrett and
Sim_Ring. The lowest cart proposal from &L Construction of Augusts($'/2,800.00) was within
few thousand dollars of the City's carts of $75,374.00. We would recommend that this proposal
not be accepted because:
(1) The cost ofthe earn wodr as proposed by the low bidder cannot be fully
quantified and much ofthese costs are already included in the City's program
costs.
(2) The employees who maintain our street lighting system are also the same
employees who maintain our traffic signals, the alamr system, and perform
other associated electrical work. The number of employees assigned to the
electrical division cannot be reduced sufficiently to offset the wmraot street
light maintenance costs while still performing these other duties.
We do recognize that the throe ofelectdcal division employees could be better
utilized, particularly on maintaining and upgrading our traffic signal system, if street light
maintenance was contracted out. Untbrmnately, this would have the effect of increasing one costs
bothfortlds year and for future budget years. (iiventheemphasisofthe Councuonwntrolling
costs and the tax mte, we would not recommend that this be done a this dine. It could be looked
at in the annual budge[ process when a decision could be made to contract this function out
should we wish to focus the time and efforts of our employees in other more critical areas.
M
12 T ly
s1mRv ws3Tmrc...
November 28, 1995
Mr, David Pellegrino, Purchasing Agent
City ofBurger
Purchasing Department
City Hall, 73 Harlow Street
Bangor, ME Mot
Reference. Trappe Signal Operations and Maintenance, AFP
Dear Mr. Pelleamum.
We wish to thank the City ofBaogor through yew office for the time and effort it took to put
together the referenced bid package.
The Surry, Institute looked very hard at this project before deciding not to submit a bid. As
noted at the pre-bid conference, we do not presently have the equipment or personnel
necessary to do the contract work to both our satisfactions. While we had obtained the
financial commitments and could have hired the certified and experienced personnel, we
could not project aretum on imestment that would offset the serious liability exposure. As
you know, Mame law Gmds liability for municipalities. Because a private contractors does not
have this liability limit we would be subjected us to a different operational and maintenance
standard than the City which would make our annual costs much higher than what the City is
currently spending.
Thank you for you consideration in this matter and please keep the Sorry Institute on the
City
ofBangor s bidders lin for Traffic and Transportation Engineering projects.
Sincartaf/ y
Michael A Waugh, P.E. '.
President
. P.O. Bon 113- Sorry M6ce0166a Ra1166v-3690 '
CITY OF BANGOR Page 1 of 1
BID TABULATION Bid Opening: October 11, 1995
PRIVATIZATION OF STREET LIGHT MAINTENANCE SRVS
SO. Construcllon
Au usta, Maine
AA Electric Servioe
Ben or Maine
Bangor Hydro
Ben or Maine
ITEM DECRIPTION
CITY.
UNIT
Unit
Price
Item
Totai
Unit
Ptice
Item
Total
UnitItem
Price Total
1. Vear i
2. Vear2
3. Year3
4. Houd Ratea
Bullet TNticG eremrB Hel r
Master El llen
oume aan
an Electrician
i
1
1
Annual
Annual
Annual
hr
hr
Or
72600.00
12500.00
72500.00
53.00
35.00
30.00
72,800.00
72 WO.Oo
72,500.00
8960000
91400.00
93300.00
45.00
2900
29.011
a9,60o.00
91,400.0011
9330000
Alternatn e
his 10='"d
113119andlmnsfer .
0 nerahl to SHE.
Ind des; Maintenance
&paws
Electrical UOIiTroGc 8 Electrician
5. Materials 8 So Instant. u ercenta a
hr
47.00
10%
29.00
25%
6. Installation Cost Retrofit P rem
365
as
55.0021,1]5.00
45.00
17325.00
TOTAL AMOUNT BID cost for ysntr one_y_rojL
L93,9]500
108925.00
588091.00