HomeMy WebLinkAbout1996-08-12 96-335 ORDERW,ndl Adbn.
Este 00/12/96
INSB Na.S%33S-
InmlSuela6t:ONuart: Application for Utility Location
Permit - Lincoln Street
Bangor Hydro-Electrid Company
Natpoedbls Deperholetr City Clerk
Connr:nN:
- .
Application for Utility Locationdeceit:
LINCOLN ST, one pole to be located on the southerly Aide
approximately lA feet easterly from the intersection Of
MAIN S7(SH26).
-
NO PUBLIC NOTICE OF THIS APPLICATION TO BE
BADE
/uavmt
manager's comm"Inn:
CMdfnaaM
AOOclaUld IWf—d0N: OACEg, APPLICATION 6 ESPRIT
Badprt Approval:
FlaeweWmatn
LglApproaal: Y 11f:,Jo✓Isf 4� ;A
InUodueed Forco-ANl
�Pewyn
❑FltdAnding
rlRefwl
m`'
96-335
Popper August
12, 1996
CITY OFBANGOR
(TITLE.) (DrUro for utility Location, r retic cincolm Screec -.
Bangor Hydro -electric company
......_..__ ......I.....I. .........1. __ _... __..
By the City CennoU of My ofBampmr:
ORDERED,
THAT the attached application for utility location permit is
hereby granted.
Note: Following are the public streets and highways referred to:
Lincoln Street, one pole to be located on the southerly side
approximately III feet easterly from the. intersection of Main Street
(5X26).
IN CITY COUNCIL 96-335
August 12, 1996
Passed LA R D E R
Councilor Tyler 1
Abstaiueft>«�� �� l Title,
Application for utility
Location Permit - Lincoln Street -
CIT4 ERK Bangor Hydro -Electric Company
......................................
ca Palta
°f� ......unci.....
Lowcilman
k
UTILITY LOCATION PERMIT
the aonlication of
c was
permit
96-335
1EMWR6053
PLAN # 1908
COMPANY dated
andof its
across certain
cot,
no newspaper
[ion with said
gor Hydro -Electric
certain of its
and across certain
after setforth.
at any person,
it
got
ectioniciwithlthis
he installation
id written
o be servedby
LOCATION;
LINCOLN ST, one pole to be located on the southerly Bide
approximately100 feet easterly from the intersection of MAIN
ST(SH26).
DESCRIPTION
The facilities will consist of a line composed ofood(oles and
supports therefor, c wires and/or cables together with
associated appurtenances. Th
The clearance of the wires
and/or
cables, other than guy wires, will be at least eighteen feet over
the public way. The poles will be set within the limits of the public
ay, but outside the part thereof customarily used for travel by
vehicles. The initial operation of the facilities will be at 9200
volts, single phase; .the voltage will be increased a
therefore requires for the operation not in excess of 20oKVlto ground.
Authorizing signature(s)
Received and Recorded in
Book ,Page Dated at ,ME,
on ,19_
A[ est This Day of ,19_
96-335
FORM 432A 1NANGOR6053
APPLICATION FOR UTILITY LOCATION PERMIT PLAN p 1908
TO: Bangor City Council - City of Bangor
BANGOR HYDRO -ELECTRIC COMPANY, a Maine corporation being duly
authorized pursuant to the laws of the State of Maine to generate,
sell, distribute and supply electricity in the City of Bangor,
County of Penobscot, State aforesaid, hereby applies for a permit to
authorize it to locate, construct, maintain and operate certain of its
facilities hereinafter described upon, along, over and across certain
public ways situated insa'd City f Bangor. -
Ho public notice of this appaccordance
lication will be made in
with the terms and conditions of Title 35-A, Section 2503, MRSA as
amended. -
LOCATION:
LINCOLN ST, one pole tube located on the southerly side
approximately 199 feet easterly from the intersection of MAIN
ST(SH26).
DESCRIPTION
The facilities will consist of a line composed of wocd�poles and
supports therefor, crossarms, wires and/or cables together th
associated. appurtenances. The minimum clearance of the wires and/or
cables, other than guywiree, will be at least eighteen feet over
the public way. The poles will be set within the limits of the public
ay, but outside the part thereof customarily used for travel by
vehicles The initial operation of the facilities will be at 9200
volts, single phase; the voltage will he increased as occasion
therefore requires for the operation not in excess of 20 RV to ground.
Dated at Bangor, Maine PGOR ELECTRIC COMPANY
on July 25, 1996. By: �4
wary cceo7 n
Tran is ion and Distribution
Job Coordinator
BANGOR
PULE PERMIT PLAN
I PHASE 7.2 KV