Loading...
HomeMy WebLinkAbout1996-07-22 96-329 ORDERCODNCD.AMON Date: 07-22-96 Item No.:64 329 IteMSubject: Award of Bid for the Linden Area Street Sewer Separation Project Responsible Department: Engineering Commentary: ( 7117/96 bids were received for the Linden Street Area Sewer Separation Project A copy of the bid tabulation is attached. The low bid received of $226,20905 submated by Campbell Construction compares favorably with the Engineeringestimate of$255,811.60. Campbell Construction has done several previous separation projects for the City with excellent performance. Bid award to Campbell Construction is recommrnded so that construction can proceed. ifleourtevoHead I Manager's Comments: �.d /_ n On* � A LPG a� Associated BdbtmmionD g T Budget Approval: naancaaaror Legal Approved: saN Solinrw For: Passage ❑ Fast Reading ❑ Refertai Page of i, 96-329 ASi ned to Coune2or{,Woodcock duly 22, 1996 r _hp CITY OF BANGOR (TITLE.) Mr[1Cr, Award"'dfor the Lindm Sonet Area Sewer Separation Project By W City Caaaail ofW City ofBonp . ORDERED, MT the award of bid is hereby made to Campben Construction for the Linden Strout Area Sewer Separation Project in the amount of $226,209.05. IN CITY COUNCIL July 22, 1996 Passed CITY ULE MI 96-329 ORDER Title, Award of Bid for the Linden Street Area Sewer Separation Project ........................... ....... F."(j n.�nea Ia Tom.. War Councilman CITY OF BANGOR Page 1 of 1 BIDTABULATION Bid Openingluly 17, 1996 LINDEN STREET SEWER SEPARATION PROJECT Campbell Construction Brewer. Maine 04412 n limon Mai rescia CcnN38,963.00 Item Description Unit Unit Price Item Total Unit Price m tal 1 Trench & Structural Rock Excavation 326 If 90.00 29,340.00 130.00 0.00 2 Misc, Excavation& Replacement Backfill 100 15.00 1,500.00 10.000.00 3 Below Grade & Replacement Backfill 50 15.00 750.00 20.000.00 4 8' PVC Sanity Sewer Pipe 456 H 41.00 18,696.00 43.008.00 5 10" PVC Sanity Sewer Pi 829 If 43.00 35,647.00 47.003.006 60 PVC House Service Laterals 563 H 36.00 20,268.00 39.007.007 8" PVC Storm Drain Pie 140 If 43.50 6.090.00 37.000.008 10" PVC Storm Drain Pi 276 If 46.00 12,696.00 41.006.009 18" PVC Storm Drain Pi 427 0 58.00 24,766.00 51.007.00 10 4 foot Diameter Sewer Manholes 55 If126,209.05 9,625.001255,431.0 0 12,375.00 11 4 foot Diameter Manholes & Catch Basins 61 of 10,675.000 13,115.00 12 Remove and Dispose Manhole & Catch 8 ea 1,176.000 1,600.00 13 Manhole Frames and Covers 9 as 3690.000 2,880.00 14 Drain Manhole frames and Covers 4 as 1,640.000 1,260.00 15 Catch Basin Frames and Covers 5 2,150.000 1,750.00 16 Reset Frames and Covers 1 as0 338.000 200.00 17 Temporary Trench Pavement 2,172 0 13,032.000 15,204.06 18 Permanent Trench Pavement 2,172 0 32,580.000 39,096.00 19 Loam, Seed, Fertilize, and Mulch 500 0 1,300.000 1,250.00 20 Calcium Chloride Dust Control 5 to1 0.0500 2,000.00 21 Water Dust Control 25,000 1 250.0006 1,500.00 TOTAL AMOUNT BID 26,209.05255,431.00