HomeMy WebLinkAbout1996-07-22 96-329 ORDERCODNCD.AMON
Date: 07-22-96 Item No.:64 329
IteMSubject: Award of Bid for the Linden Area Street Sewer Separation Project
Responsible Department: Engineering
Commentary:
( 7117/96 bids were received for the Linden Street Area Sewer Separation Project A copy of
the bid tabulation is attached.
The low bid received of $226,20905 submated by Campbell Construction compares favorably
with the Engineeringestimate of$255,811.60.
Campbell Construction has done several previous separation projects for the City with excellent
performance. Bid award to Campbell Construction is recommrnded so that construction can
proceed.
ifleourtevoHead I
Manager's Comments: �.d /_ n On* � A
LPG
a�
Associated BdbtmmionD g T
Budget Approval:
naancaaaror
Legal Approved:
saN Solinrw
For:
Passage
❑ Fast Reading
❑ Refertai
Page of i,
96-329
ASi ned to Coune2or{,Woodcock duly 22, 1996
r _hp CITY OF BANGOR
(TITLE.) Mr[1Cr, Award"'dfor the Lindm Sonet Area Sewer Separation Project
By W City Caaaail ofW City ofBonp .
ORDERED,
MT
the award of bid is hereby made to Campben Construction for the Linden Strout Area
Sewer Separation Project in the amount of $226,209.05.
IN CITY COUNCIL
July 22, 1996
Passed
CITY ULE MI
96-329
ORDER
Title, Award of Bid for the Linden
Street Area Sewer Separation Project
........................... .......
F."(j
n.�nea Ia
Tom..
War
Councilman
CITY OF BANGOR Page 1 of 1
BIDTABULATION Bid Openingluly 17, 1996
LINDEN STREET SEWER SEPARATION PROJECT
Campbell Construction
Brewer. Maine 04412
n
limon Mai
rescia CcnN38,963.00
Item
Description
Unit
Unit Price
Item
Total
Unit
Price
m
tal
1
Trench & Structural Rock
Excavation
326
If
90.00
29,340.00
130.00
0.00
2
Misc, Excavation& Replacement Backfill
100
15.00
1,500.00
10.000.00
3
Below Grade & Replacement Backfill
50
15.00
750.00
20.000.00
4
8' PVC Sanity Sewer Pipe
456
H
41.00
18,696.00
43.008.00
5
10" PVC Sanity Sewer Pi
829
If
43.00
35,647.00
47.003.006
60 PVC House Service Laterals
563
H
36.00
20,268.00
39.007.007
8" PVC Storm Drain Pie
140
If
43.50
6.090.00
37.000.008
10" PVC Storm Drain Pi
276
If
46.00
12,696.00
41.006.009
18" PVC Storm Drain Pi
427
0
58.00
24,766.00
51.007.00
10
4 foot Diameter Sewer Manholes
55
If126,209.05
9,625.001255,431.0
0
12,375.00
11
4 foot Diameter Manholes & Catch Basins
61
of
10,675.000
13,115.00
12
Remove and Dispose Manhole & Catch
8
ea
1,176.000
1,600.00
13
Manhole Frames and Covers
9
as
3690.000
2,880.00
14
Drain
Manhole frames and Covers
4
as
1,640.000
1,260.00
15
Catch
Basin Frames and Covers
5
2,150.000
1,750.00
16
Reset Frames and Covers
1
as0
338.000
200.00
17
Temporary Trench Pavement
2,172
0
13,032.000
15,204.06
18
Permanent Trench Pavement
2,172
0
32,580.000
39,096.00
19
Loam, Seed, Fertilize,
and Mulch
500
0
1,300.000
1,250.00
20
Calcium Chloride
Dust Control
5
to1
0.0500
2,000.00
21
Water Dust Control
25,000
1
250.0006
1,500.00
TOTAL AMOUNT BID
26,209.05255,431.00