HomeMy WebLinkAbout1996-06-24 96-286 ORDERCOONCH. ACTION
Date: 06-24-1996 Item No.: 96962§_
Item/Subject: Authorizing Execution of License Agreement Allowing Handicap Access Ramp
Encroachment w the Harlow Sweet llightAr-Way - Colonel Company
Responsible Department: Engineemng
Commemay:
We have received a request Gom the Cabrel Company to allow a slight encroachment into the
westerly aide of the Harlow Street right-of-way to construct a handicap access recap to serve the
(mown plaza Building m 350 Harlow St. This bas been reviewed by the Municipal Operations
Committee which rewcamerWa approval.
Attached are copies of a letter from Robert Collins of the Cabrel Company and a memorandum
from the City Engineer which Provides further iMarmaaon.
DeooranemXead
MSnagC�te�Co„mmnp�lt�s:
NM r
AS90CINM WOrmatlOR
Budget Appmval:
Fi�wnce lNrecmr
Legal Approval:
Cry So lnrw
Intr aced For G'"X—
Passage
❑ Fust Reading
❑�� Page of
96-286
As®gnedto Councilor Woodcock June 24, 1996
_Ap CITY OF BANGOR
(TITLE) (Drbtra Aa@orlds"i Execution of License Agreement Mowing Handicap Access
Ramp EacroachmentiniheAdow StmtMghROH=Way Cabrel Compmy
BY the IXty � nmlt ojlM GYIv W Bator.
ORDER&D,
THAT the City Manager is baeby authorized and directed to execute a License
Agreement allowing the Cabrel Company to encroach into the Harlow Street
Right -of -Way for the purpose of conameding a handicap access ramp to serve an
existing budding located at No. 350 Harlow Street, provided that the License
Agreement shall be in a form acceptable to the City Solicitor.
IN CITY COUNCIL'
June 26, 1996
Passed
ciTY UE
96-286
ORDER
Title, Authorizing Execution. of License
Agreement Allovtng Handicap Access Ramp
Encroachment in the Harlow Street Ri
...........6he-
o�-list - CSErslComQanY
......... �....pt../.......................
Mired to
T m. W¢a�carR...........
Councilman
96-286
CARREL COMPANY
P.O. Box 2400
Bangor, Maine 04402-2400
(20]) 947-6737
May 22. 1996
Mr. James Ring
City Engineer
City of Bangor
13 Harlow Street
Bangor. Maine 04401
RE: InTown Plaza - Proposed Handicap Ramp
Harlow Street, Bangor, Maine
Bear Tin.
Enclosed for your review is a Sketch Plan of a proposed
handicap ramp to be constructed on the Harlow Street side of
the InTown Plaza. I reviewed the plan and proposal with Art
Morgan from your department to determine the possibility of
constructing the proposed ramp which will extend approximately
one foot beyond our property line. Art suggested that I submit
sketch showing property lines and dimensions for the proposed
amp along with a request of the City for permission to proceed
with the proposed project.
Accordingly. Cabral Company hereby requests a license from
the City of Bangor to con ,struct a handicap ramp at the InTown
Plaza which will encroach approximately one foot on City
property, a shown on the enclosed SketchPlan. Additionally,
Cabral Company agrees to repair/replace all areas disturbed
during construction to at least as good a condition as existed
prior toconstruction.
Should you have any questions or Reed additional
Information concerning this request, please call me at
94]-6]3].
Thank you for your consideration.
very
truly yours.
Rbbevt E�Collins
REC: Jms-b
Enclosure
W8SfO2SCIrSIr SI
June 14, 1996
TO: Municipal Operations Committee
FR: James D. Ring, City Engineer
SUBIECT: Request to Occupy a Portion of Harlow Street RRV- Fransway Realty
Recently we received a request from Frionmy Realty to allow a one foot
encroachment into the Inflow Street right-of-way to construct a new handicap access
ramp into a portion of their lntown Plain building. The ramp would be Constructed on the
Harlow Street side of the building and roe parallel to the sidewalk. There is not enough
room between the building face and the right-cf-way line to construct a ramp to ADRs
required width standards, so Fmruway, is requesting pennission for placing the ramp one
foot into the right-ofway for a total distance of approximately 28 feet. Because the
purpose is to satisfy ABA reluhemena, this type of construction does not need to meet
any minimum setbacks. I have inspected the location and determined that the proposed
ramp would not extend into the sidewalk nor create any foreseeable problems. I have also
discussed the request with the City Solicitor. If the request is approved, a license
agreement would be prepared to allow the encroachment.
I have requested that this item be placed on the next Municipal Operations
Committee agenda. At that time, I wJl have a plan showing the exact location, etc.
involved.
U]
PC: Bob Collins
Frwasway Realty