HomeMy WebLinkAbout1996-05-13 96-221 ORDINANCEDate: May1996 Item No. 96-221
ItemlSubled: Amending the Floodplain Management Ordinance- Update the Floodplain
Management Ordinance to make it conform to entreat state and federal minimum
standards.
Responsible Department Code Enforcement
Commentary
These amendments to the Floodplain Management Ordinance we required by the Federal Emergency
Management Agency and the Maine State Planning Office in order to make B rtgoes Floodplain
Management Ordinance conform to current state and federal minimum standards. Conformance with
federal and state minimum standards is required to permit Bangor to continue to participate in the
National Flood insurance Program.
Departmaft Head
Finance Director
I.egal.Approval: r VC a I (MA/ is Vo�r a/
city Solicitor
Intraduced For
Passage
First Reeding _
96-221
Aerip,edbC oncilw Popper May 13, 1996
2 NNpp' CITY OF BANGOR
(TITLE.) V1 nNhIffi1CCr_... AmeMing dw.Fbodplaw-ManagemW ANioancer.chapwmi,-__-
Article V, B; Article VI, 1; Article VI, I; Article VI, new section I; Article VIII, B; Article IX, D,
Br it ordained by tha My Council of W City ofBaaacr, m Maws: Mff the Floodplain
Management Ordinance - Chapter XIII, Article V, B, be amended as follows:
B Iltiliu in the review of all Flood Hanmd Development permit Applications, the
base flood data conmined in the"Flood Insurance Study-(TownsCity) City of
Bangor, Maine," as described in Article I. In special flood hazard areas where
base flood elevation data are not provided, flue Code Enforcement macer shall
obtain, review and reasonably utilize my base flood elevation and floodway data
from federal, state or other sources, including information obtained pursuant on
Article IB, paragmph G.1.b.; Article VI, paraInaph-F d; and Anicle VIII,
paragraph D, ut order to administer Article VI of this Ordinance:
THAT the Floodplain Management Ordhetnce - Chapter XBI, Article VI, 1, be emended as
follows
+Eo New wnsnuction ...
TBAT the Floodplain Mamgemem Ordinance - Chapter XIII, Article VI, I, he amended as
fcllows:
-F1. Floodways:
3. In Zone A riverine areas, in which the regulatory flocdway is determined
In be the channel of the river or other water course and the adjacent land
areas to a distance of one-half the width of the floodplain as measured for
the normal high water mark to the upland limit of the floodplain,
96-221
exceeds 50%ofthe market value of the structure either before the improvement or
repair is stated or, if the structure has been damaged and is being restored, before
fire damage occurred. For purposes of this definition "substantial improvement"
is considered to occur a the firs, of the first alteration of any wall, ceflue& floor,
or structural part of the building commences, whether or not that alteration affects
the externa) dimensions of the sweture. The term does nos however, include
either:
(1) any project for improvemev of structure to comply with existing
state or local health, sanitary, or safety code specifications which are
solely have been ideoffed by the lural code enforcement official and
which ate the minimum neressary to assure safe living conditions or
(2) any alteration of a stmcnus listed on the National Register of Historic
Places or a Sure Inventory of Historic Places, provided that the a Wedgedn
veill nes reclu
structure.
36: "Variance"...
"Violation"- issue ameans the kiheeialure ofasnocnaeor otterdevelopment
to body comply with a community's floodplarr management regulations or
ordinance.
New text is underl,and deleted text is envmk out.
96-221
"FecreationalVhicle"- means a vehicle winch is
a. built on a single chassis
b, 400 qmm fen or less whenmeasured at the lar gest horizon
And
pdpjectloo:
C. designed be vl6 nn II d or rannumentlyWomble by 1' he
duty truck and
d, dei tined primarily not for use as a permanent dwelling but as
ammary living raiders fm recreational camping travel or
seasonal use
3t "Regulatory Floodway"...
3} "fact ofC atruction"-means the date the building permit was issued, provided
the acral start of construction, repair, reconstruction, rehabiliatieu addidgm
placement, substantial improvement or other improvement waswithin 180 days of
the permit date. The actual stun means either the first placement of permanent
construction of structure on a site, such as the pouring ofslab or footings, the
installation of piles, the construction of column, or any work beyond the sage of
excavation; or the placement of a manufactmW home on a foundation.
Permanent construction does not include land preparation, such as clearing,
grading and filling; nor does It include excavation for basemem, footings, pias, or
foundations or distraction of temporary forms; nor does it include the installation
on the property of accessory buildings, such as garages or skids not occupied as
dwelling units or not part of the main structure. For a sub umt al imprrovement
me actual sent of construction means he first alteration of my wall. out ing.
din ti, wbether or not fled allocation affects jh�
external W menesi areof tie building
"Substantial Damalg--m ma damage of any origin sustained by a structure
wbereby ft amst of counting fee structure to its raredarnmic condition would
equal or exceed 5M of An make[ value of the structure before the damage
occurred.
-5.. "Substantial lmprovemmt"-means any repair, reconstruction, m1gibil'atipn
addition. or other improvement of a s[meare, the value ofwhich equals or
FZ:
Em
listine maintained by toe DvurrUnent of Interior) or prglimburriLy
historic district or a district Mlimirermly dererninexi by the
Secretary of ffimo Interior to qualify w a regigered himoric district
Oe Secretary of the histone diaWM
cert fj� either
2) Directly by 6e Secretary of t1re Intenor in states Mffio
D.
"Mean Sea Level"
"New Construction"- means structures for which the "start of construction"
commenced on or after the effective date of die 0oodphun management
regulations adopted by aconvnunity and includes any subsequent improverneros
mMa alructuxes
"100.year Floud" ...
5
96-221
96-221
R "])evelopment"- means my change caused by individuals or entities to improved
or unimproved real estate, including but not limited to the construction of
buildings or other structures; the construction of additions or substantial
improvements to buildings or other strucnues; mining, dredging, filling, grading,
paving,excavation, or drilling operations, or storage of communal or meter alt
and the storage, deposition, or extraction of materials, public or private sewage
disposal systems or water supply facilities.
94 "Elevated Buildings"...
i -t "Elevation Certificate" -An official form (FEMA Form 81-31, SEP 83 UM, as
amended) that (i)ie issued to verify compliance with the floodplain management
regulations of the National Flood Insurance Program; and (ii) is required as a
condition fin purchasing flood'msurmce.
42 "Flood"...
}} "Flood Elevation Study"...
+4 "Flood Insurance Rate Map"...
1§. "Flood Insurance Study"...
K "Floodplain"...
IA "Floodplain Management" ...
f8: "Floodplain Management Regulations"- means noting ordinances, subdivision
regulations, building codes, health regulations, special purpose ordinances (such
as a floodplain ordinance, grading eminence, and erosion control ordinance) and
other applications of police power. The term describes such site or local
regulations in my combination thereof, which provide standards lie fpr the
purpose of flood damage prevention and reduction.
d9: "Flood Proofing"....
iR "Floodway"...
"Floodway Encroachment Lines"...
"Freeboard"...
43-. "Functionally Dependent Use"...
4
96-221
THAT the Floodplain Management Ordinance - Chapter MR, Article IX, F, 3, be amended as
follows:
F. 3. the applicant agrees in writing that the applicant is fully aware of all the
reales dalga inherent in the use of Intel subject to Reading....
THAT the Floodplain Management Ordinance- Chapter MR, Article X, B, be amended as
follows:
B. The penalties contained in 39 P-M6h§-096630-A MRSA 6 4432 shall apply to
my violation of this Ordinance.
THAT the Floodplain Management Ordinance - Chapter XIII, Article MR, be amended as
follows:
T: "AdjacentGrade"- meansthe mtural elevation of the ground surface prior to
construction next to the proposed wells wells of a structure.
?, "Area of Shallow Flooding"...
3 "Area of Special Flood Hazard"...
4 "Base Flood"...
fi "Basement"...
fr. "Board of Appeals"...
Tmkaway WaW - means a wall that is art hear of she struchual n of the
building and is intencled throuab its design and construction to under
sWeific lateral treating forces. without n d et eehwated parom of
the badd'ne or supoorting foundation system
&
"Building"...
4 "Certificate of Compliance"...
& "Code Enforcement Office'...
n
96-221
erncmachmeMs, including fill, new construction, substantial improvement,
and other development shall not be permitted unless a technical evaluation
certified by a tegiaerd professional engineer is provided meeting the
requirements of cle VI, paragraph - .11
THAT the Floodplain Management Ordinance - Chapter XIII, Article VI, 1, be amended as
follows:
Recreational Vebicles locatedwithin:
& Be on the site for fewer than lgo consecutive days
THAT the Floodplain Management Ordinance - Chapter XIB, Arficle VIII, B, be amended as
follows:
@AD p0lic ufilifiea md fwalilka mh as sewer see electrical and water systems
ar goe located and constructed to minimize or eliminate Flood damage.
THAT the Floodplain Managemev Ordinance- Chapter XIII, Article IX, D, 1, be =ended as
follows:
D. 1. other criteria of Article IX and Article Y VII -d we met; and,
IN CITY CCOMCIL
May 13, 1996
First Reading
Referred to Community
b Economic Development
Committee
CLE
CITY COUNCIL
May 29, 1996
Passed
Vote: 8 yes, 1 absent
Councilors voting yea:
Ealdaccl, Blanchette, Frankel,
Leen, Soucy, Sullivan, Tyler d
Woodcock.
�Councilor bsenu Popper
CITY CLE
96-221
ONOINANCE
( TITLE,) Amending the Floodplain
Management Ordinance - Chapter %III,
Article V,B, Article VI,J; Article VI,I;
Article VI, new eece on i; Lt c e 7=,B;
Article %,E. and Article XIII
l . @