CITY COUNCIL ACTION 09/25/2017 17-342
Council Meeting Date: 09/25/2017
Item No: 17-342
Responsible Dept: Engineering
Requested Action: Order Map/Lot: N/A
Authorizing Execution of Contract with Eastwood Contractors in the Amount of $1,983,295 for the French,
State and Exchange Street Utility Project
Summary
On Friday, September 15, 2017, the City receive five (5) bids ranging from $1,983,295 to $2,972,062
for the French, State and Exchange Street Utility Project.
This bid included Bangor Water District work as well, the City cost of this project is $1,248,345. The
project includes the replacement and separation of sewer and stormwater (only French Street will
remain a combined system due to limitations of space). The French Street portion of the project will
begin this fall, and it as well as the balance of the project will be completed in 2018. The French
Street portion of the work will be from State Street to Somerset. The State Street portion of the
work will be from Broadway to Exchange (the Water District work will include the replacement of a
the State Street line from Exchange to the Kenduskeag bridge). The Exchange Street portion of the
work will be from State Street to
Committee Action
Committee: Finance Committee
Action: Recommend for passage
Staff Comments & Approvals
City Manager
Introduced for: New Business
York Street.
Meeting Date: 09/18/2017
For: 5 Against: 0
City Solicitor
P -1--L 11--� -
Finance Director
CITY OF BANGOR ORDER
Date: 09/25/2017
Item No: 17-342
Assigned to Councilor: Sprague
09/25/2017 17-342
Authorizing Execution of Contract with Eastwood Contractors in the Amount of $1,983,295 for the French,
State and Exchange Street Utility Project
Be it Ordered by the City Council of the City of Bangor that,
The Finance Director is hereby authorized to execute a contract with Eastwood Contractors in the
amount of $1,983,295 for the French, State and Exchange Street Utility Project.
City of Bangor Bid Tabulation
Bid: French, State, Exchange Street Utility Project
Bid No. P18-022
Bid Opening: September 15, 2017
R.F. Jordan and Sons
Ranger Contracting, Inc. Eastwood Contractors, Inc.S.E. MacMillan Company, Inc. Sargent Corporation Corporation, Inc.
Fairfield, MEBrewer, MEBangor, MEStillwater, MEEllsworth, ME
ItemDescriptionEstQtyUnit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price
1Traffic Control1Lump Sum300,704.20 3 00,704.20 30,000.003 0,000.00 100,000.001 00,000.00 93,000.009 3,000.00 56,000.005 6,000.00
2Flagging Hour7,500Per Hour0 .01 7 5.002 1.001 57,500.000 .01 7 5.000 .01 7 5.003 5.002 62,500.00
3Mobilization1Lump Sum71,595.00 7 1,595.00 55,000.005 5,000.00 60,000.00 6 0,000.00 89,000.008 9,000.00 74,950.007 4,950.00
4Rock Removal 175Cubic Yd 171.503 0,012.505 0.008 ,750.001 .00 1 75.00 200.003 5,000.00 325.005 6,875.00
5Test Pits20Each 379.007 ,580.00 500.001 0,000.00 2,000.00 4 0,000.00 1,000.002 0,000.00 1,200.002 4,000.00
6Rodent Control1Lump Sum34,840.00 3 4,840.00 1,500.001 ,500.00 100.00 100.00 15,000.001 5,000.00 50,000.005 0,000.00
Maintenance of Sewer Flows
71Lump Sum132,217.00 1 32,217.00 60,000.006 0,000.00 200,000.002 00,000.00 98,000.009 8,000.00 50,000.005 0,000.00
812” Ø PVC Storm Drain or Sewer Main86Linear Ft
8 2.507 ,095.004 5.003 ,870.00 100.00 8 ,600.00 144.001 2,384.007 6.006 ,536.00
Linear Ft
918” Ø PVC Sewer Main709 2.506 ,475.005 0.003 ,500.00160.00 1 1,200.00 160.001 1,200.008 8.006 ,160.00
Linear Ft
1024” Ø PVC Sewer Main1,900 157.502 99,250.00 170.003 23,000.00 200.003 80,000.00 210.003 99,000.00 166.503 16,350.00
Linear Ft
116” Ø Sewer Lateral1,0505 8.006 0,900.00 100.001 05,000.005 0.00 5 2,500.00 160.001 68,000.00 107.001 12,350.00
128” Ø Sewer Lateral150Linear Ft5 0.507 ,575.00 110.001 6,500.005 0.00 7 ,500.00 160.002 4,000.00 138.002 0,700.00
1312” Ø HDPE Storm Drain1,450Linear Ft8 3.001 20,350.004 0.005 8,000.00 100.001 45,000.00 144.002 08,800.005 0.007 2,500.00
143’ Ø Catch Basin with Curb Inlet and Solid Cover26Vertical Ft364.50 9 ,477.00 500.001 3,000.001 .00 26.00 850.002 2,100.00 329.008 ,554.00
153’ Ø Standard Catch Basin with Trap35Vertical Ft320.50 1 1,217.50 500.001 7,500.00 600.00 2 1,000.00 650.002 2,750.00 270.009 ,450.00
164’ Ø Standard Catch Basin with Trap102Vertical Ft382.00 3 8,964.00 500.005 1,000.00 600.00 6 1,200.00 900.009 1,800.00 490.004 9,980.00
174’ Ø Standard Drain Manhole21Vertical Ft414.50 8 ,704.50 500.001 0,500.00 600.00 1 2,600.00 800.001 6,800.00 396.008 ,316.00
184’ Ø Standard Sanitary Sewer Manhole50Vertical Ft377.00 1 8,850.00600.003 0,000.00 600.00 3 0,000.00 825.004 1,250.00 323.001 6,150.00
196’ Ø Standard Sanitary Sewer Manhole45Vertical Ft713.00 3 2,085.00 900.004 0,500.00 900.00 4 0,500.00 1,250.005 6,250.00 611.002 7,495.00
2” Rigid Insulation
20500Square Ft3 .501 ,750.002 .001 ,000.004 .00 2 ,000.003 .001 ,500.003 .501 ,750.00
21Flowable Fill 1,000Cubic Yd 100.001 00,000.004 0.004 0,000.000 .01 1 0.00 200.002 00,000.00 120.001 20,000.00
224” Schedule 80 PVC Electrical Conduit970Linear Ft1 3.501 3,095.002 5.002 4,250.001 8.00 1 7,460.003 4.003 2,980.004 2.004 0,740.00
23Installation of Communication Handhole4Each 616.002 ,464.00 1,200.004 ,800.00 1,000.00 4,000.00 6,000.002 4,000.00 388.001 ,552.00
24Curb Ramp Detectable Warning Field170Square Ft6 0.001 0,200.008 0.001 3,600.007 0.00 1 1,900.008 0.001 3,600.006 7.001 1,390.00
25Common Excavation4,100Cubic Yd1 3.005 3,300.001 0.004 1,000.000 .01 4 1.002 4.009 8,400.001 7.006 9,700.00
26Remove Pavement Surface3,420Square Yd1 .003 ,420.005 .001 7,100.003 .001 0,260.006 .002 0,520.009 .003 0,780.00
27Aggregate Base Course – Type A1,500Cubic Yd2 5.503 8,250.0015.002 2,500.000 .01 1 5.003 4.005 1,000.004 2.006 3,000.00
28Aggregate Sub Base Course – Type D2,000Cubic Yd1 8.503 7,000.001 5.003 0,000.000 .01 2 0.002 6.005 2,000.003 0.006 0,000.00
29H.M.A. Pavement 9.5 mm (sidewalks, drives, & incidentals)305Ton 125.003 8,125.00 135.004 1,175.00 150.00 4 5,750.00 160.004 8,800.00
139.004 2,395.00
30H.M.A. Pavement 9.5 mm (wearing course)597Ton 120.007 1,640.00 135.008 0,595.00 300.001 79,100.00 125.007 4,625.00 133.007 9,401.00
31H.M.A. Pavement 19 mm (binder & base course)520Ton 120.006 2,400.00 135.007 0,200.00 300.001 56,000.00 115.005 9,800.00 133.006 9,160.00
32Slipform Concrete Curb1,300Linear Ft9 .501 2,350.009 .001 1,700.008 .001 0,400.001 0.001 3,000.009 .501 2,350.00
33Remove/Reset Exist. Granite Curb1,275Linear Ft2 7.503 5,062.502 0.002 5,500.002 0.00 25,500.002 4.003 0,600.002 3.002 9,325.00
34Rebuild 4” Concrete Sidewalk4,565Square Ft9 .504 3,367.507 .003 1,955.001 6.00 7 3,040.001 0.004 5,650.001 1.005 0,215.00
35Reset Existing Sign35Each9 7.503 ,412.507 0.002 ,450.001 .00 3 5.00 150.005 ,250.008 5.002 ,975.00
36Remove Exist. Tree 1Each 5,904.005 ,904.00 1,000.001 ,000.001,000.00 1 ,000.001,000.001 ,000.00500.00 5 00.00
37Loam, Seed, and Mulch290Square Yd1 3.003 ,770.001 5.004 ,350.002 1.00 6 ,090.008 .002 ,320.007 .002 ,030.00
38Erosion and Sediment Control1Lump Sum86,209.00 8 6,209.00 3,000.003 ,000.00 10,000.00 1 0,000.00 43,000.004 3,000.00 30,000.003 0,000.00
394” White or Yellow Pavement Marking Line3,000Linear Ft0 .702 ,100.000 .501 ,500.001 .00 3 ,000.001 .003 ,000.000 .401 ,200.00
40White or Yellow Pavement Marking 3,000Square Ft1 .504 ,500.001 .504 ,500.002 .00 6 ,000.002 .006 ,000.001 .404 ,200.00
4116” CLDI Water Main235Linear Ft 171.504 0,302.50 150.003 5,250.00 200.00 47,000.00 220.005 1,700.00 294.506 9,207.50
4212” CLDI Water Main883Linear Ft9 2.508 1,677.50 110.009 7,130.00 130.001 14,790.00 172.001 51,876.00 170.001 50,110.00
438” CLDI Water Main1,350Linear Ft 158.502 13,975.009 0.001 21,500.00 100.001 35,000.00 142.001 91,700.009 4.001 26,900.00
446” CLDI Water Main347Linear Ft8 3.002 8,801.00 100.003 4,700.00 100.00 3 4,700.00 140.004 8,580.00 127.004 4,069.00
454” CLDI Water Main74Linear Ft8 4.506 ,253.00 100.007 ,400.00 100.00 7 ,400.00 130.009,620.00130.009 ,620.00
4616” Butterfly Valve Supplied by BWD1Each 1,491.001 ,491.00 2,500.002 ,500.00 2,000.00 2 ,000.00 2,000.002 ,000.00 1,800.001 ,800.00
4712” Gate Valve w/ Box6Each 2,778.001 6,668.00 3,000.001 8,000.00 2,000.00 1 2,000.00 4,500.002 7,000.00 2,500.001 5,000.00
488” Gate Valve w/ Box6Each 1,534.009 ,204.00 2,500.001 5,000.00 2,000.00 1 2,000.00 3,000.001 8,000.00 1,400.008 ,400.00
496” Gate Valve w/ Box16Each 1,206.501 9,304.00 2,000.003 2,000.00 1,500.00 2 4,000.00 2,250.003 6,000.00 900.001 4,400.00
504” Gate Valve w/ Box4Each 1,045.004 ,180.00 2,000.008 ,000.00 1,500.00 6,000.00 1,500.006 ,000.00 800.003 ,200.00
51Hydrant Assembly New4Each 4,829.501 9,318.00 3,000.001 2,000.00 6,500.00 2 6,000.00 6,000.002 4,000.00 3,000.001 2,000.00
52Remove Hydrant Assembly4Each 1,005.004 ,020.00 1,000.004 ,000.00 1,000.00 4 ,000.00 1,400.005 ,600.00 2,700.001 0,800.00
5316” Cut and Cap1Each 2,470.502 ,470.50 1,800.001 ,800.00 3,000.00 3 ,000.00 2,000.002 ,000.00 3,200.003 ,200.00
5412” Cut and Cap1Each 1,869.501 ,869.50 1,500.001 ,500.00 2,000.00 2 ,000.00 2,000.002 ,000.002,900.002 ,900.00
558” Cut and Cap2Each 1,694.503 ,389.00 1,000.002 ,000.00 1,500.00 3 ,000.00 1,500.003 ,000.00 950.001 ,900.00
566” Cut and Cap1Each 1,659.001 ,659.00 1,000.001 ,000.00 1,000.00 1 ,000.00 1,500.001 ,500.00 2,700.002 ,700.00
571” Dia. Type K Copper667Linear Ft4 0.502 7,013.507 5.005 0,025.00 100.00 6 6,700.007 8.005 2,026.004 2.002 8,014.00
581 ¼ ” Dia. Type K Copper107Linear Ft4 5.504 ,868.508 5.009 ,095.00 110.00 1 1,770.008 0.008 ,560.004 0.004 ,280.00
591 1/2 ” Dia. Type K Copper153Linear Ft4 9.507 ,573.50 100.001 5,300.00 120.00 18,360.008 2.001 2,546.005 0.007 ,650.00
602” Dia. Type K Copper50Linear Ft5 0.002 ,500.00 100.005 ,000.00 140.00 7 ,000.008 5.004 ,250.006 5.003 ,250.00
611” Dia. Corporation28Each 146.004 ,088.00 300.008 ,400.00 200.00 5 ,600.00 250.007 ,000.00 160.004 ,480.00
621 ¼” Dia. Corporation3Each 173.50 5 20.50 500.001 ,500.00 400.00 1 ,200.00 350.001 ,050.00 200.00 6 00.00
631 1/2” Dia. Corporation4Each 407.501 ,630.00 1,500.006 ,000.00 500.00 2 ,000.00 425.001 ,700.00 460.001 ,840.00
642” Dia. Corporation2Each 521.001 ,042.00 1,500.003 ,000.00 600.00 1 ,200.00 450.00 9 00.00 600.001 ,200.00
651” Curb Stop, Box, and Rod28Each 388.001 0,864.00 300.008 ,400.00 200.00 5 ,600.00550.001 5,400.00 300.008 ,400.00
661 ¼” Curb Stop, Box, and Rod3Each 519.001 ,557.00 500.001 ,500.00 400.00 1 ,200.00 650.001 ,950.00 400.001 ,200.00
671 1/2” Curb Stop, Box, and Rod4Each 576.002 ,304.00 1,500.006 ,000.00 600.00 2 ,400.00 725.002 ,900.00 600.002 ,400.00
682” Curb Stop, Box, and Rod2Each 625.001 ,250.00 1,500.003 ,000.00 800.00 1,600.00 875.001 ,750.00 700.001 ,400.00
69DOT Approach Slab Repair1Lump Sum40,431.00 4 0,431.00 5,000.005 ,000.00 10,000.00 1 0,000.00 30,000.003 0,000.00 7,500.007 ,500.00
Total$ 2,386,510.20$ 1,983,295.00$ 2,300,617.00$ 2,972,062.00$ 2,499,949.50
IN CITY COUNCIL
SEPTEMBER 25, 2017
CO 17-342
MOTION MADE AND SECONDED FOR PASSAGE
PASSED