HomeMy WebLinkAbout1997-08-25 97-357 ORDERRen m. 97-357
Cele A:aoet 25 1997
Iter/suoiect: Applicaticn foz Mility location Pexndt - 86.4IX HITBET
e� Hgixo-Electric Ce
Resiree a Depe nt: aty Clerk
Applicatim for I lily location Pexeft -
=K SIFEET, ore pole to b lccat on t nortlfexly
side apprmdnetely 31 feet soul ly Exon t center of
CHIFKH P.QAD.
w P lc Nll'fC8 m "1fH9 A Immw 1 m !AL£ /j2
D xl'nGnt HeO
Ment is Cmnents:
City F9repex
Aseociafed InformUon: Appllcatfon, Po t
A
ID� for
X Paas
First Pnadiy
Referral Pt --L-of 1
9)-35)
Amkp to Gra am Woodcock August 25, 1997
CITY OF BANGOR
�p Applicatr for Utility 1�' tim Pz t ESSES
(TITLE) Vt/Ti1Br, ..__ __... ..._...... ........... __..
STREET' - 9anpr %y -Kect C�
By tde City Cuu+ of Me tory o/Ban :
ORDERED,
TEAT ti:e atta applicatim for utility lxatim pemdt is
hereby granted.
Note: Pollwu are M pobl.ic streets and higf¢vays referred in:
mm STREET, oat Pb e in be located m the northerly side
approximately 31 feet scu h ly frau the center of CHURCH RdAU.
No Public Notice of rias applicatim to be nese
IN CITY COUNCIL
August 25,'1997 97-357
Passed -
Councilor Tyler Abstained 0 RDE R
Title, Application for Utility Location
TY LERK Permit - BASES STREET Bangor Hydro-
_ Ulec[zic Company
Assigned to ,
Councilman
UTILITY LOCATION PERMIT
Upon the application of BANGOR HYDRO -EL
"t 13, 1997, requesting permission to to
ities hereinafter described upon, along
c ways in the City of Bangor, County of
of Maine, all as set forth in its appl
cation having been made by applicant in
.cation, permission is hereby given to a
ny to locate, construct, maintain and o
ities hereinafter described upon along
Cays situated nu
said municipality as
permit is granted subjectto thevi
or corporation owning property within
abuts the applicable way may file a wr
.sing authority within ninety (90) days
e facilities described in said appplicat
tion to state the cause of the oblectio
any in hand or by registered or certifi
iBANGOR7076
PLAN H 2289
ZANY dated
n of its
across certain
cerra
n set sforth.
served by
LOCATION:
ESSEX STREET, one pole to be located on the northerly side
approximately 31 feet southerly from the center of CHURCH ROAD.
DESCRIPTION:
The facilities will consist of a line composed of wood poles and
supports therefor, c and/or cables together with
associated appurtenances. Thwems
m clearance of the w and/or
cables, other than guy wires, will ibeat least eighteen feet over
the public way. The poles will be set within the limits of thepublic
way, but outside the part thereof customarily used for travel by
vehicles. The initial operation of the facilities will be at 9200
volts, single phase; the voltage will be increased a
thereforerequiresfor the operation not in excess of 20eXvlto ground.
Authorizing signature(s)
Received and Recorded in
Book ,Page Dated at IPOI
on
9_
Attest: This Day of ,19_
97-357
FORM 432A 13ANGOR7076
APPLICATION FOR UTILITY LOCATION PERMIT PLAN N 2284
TO: Bangor City Council - City of Bangor
BANGOR HYDRO -ELECTRIC COMPANY, a Maine corporation being duly
authorized pursuant to the laws of the State of Maine to generate,
sell, distribute and supply electricity in the City of Bangor,
County of Penobscot, state aforesaid, hereby applies for a permit to
uthorize it to locate, construct, maintain and operate certain of its
facilities hereinafter described upon, .along, over and across certain
public ways situated in
said City of Bangor.
NO public notice of this application will be made in accordance
with the terms and conditions of Title 35-A, Section 2503, MRSA as
amended.
LOCATION:
ESSEX STREET, one pole to be located on the northerly side
approximately 31 feet southerly from the center of CHURCH ROAD.
DESCRIPTION
The facilities will consist
ist of a line composed of wood Qolea and
supports therefor, crossa sand/or cables together with
crated appurtenances. Thw
The minimum m clearance of the wires and/or
cables, other than guywires, will beuat least eighteen feet over
the public way. The poles will be set within the limits of the public
way, but outside the part thereof customarily used for travel by
vehicles. The initial operation of the facilities will be at 7200
volts, single phase; the voltage will be increased as occasion
therefore requires for the operation not in excess of 20 KV to ground.
Dated at Bangor, Maine BANGOR HYDRO -ELECTRIC COMPANY
On August 13, 1997. By: ��"M: �. �•lilb 1O1
V Mary Jac son
Transmission and Distribution
Job Coordinator
POLE PERMIT PLAN PAGE 1 OF 1
�f
1! DATE: 7112197
1 PHASE %.2 KV ENG, CR CAD Cg_
#
JMNU1BANGOR7076
PLAN11 szxi