Loading...
HomeMy WebLinkAbout1997-07-28 97-333 ORDERCOIRVCIL ACTION Daze: Instable.: 97-333 Item/Subject Authorizing Award of Bid for Ntiftemth Street Ares Sewer Separation Project Responsible Department Engineering Commesu r : On July 16,1997, bids were received for the Fifteenth Street area sewer separation project. 71us is a continuation of sewer separation in the "Cemetery" drainage subsection as required in the City's CSO control program. The low bid of $564,313.85 submitted by Lou Silver, Inc. of Orono, Maine is well widen our projet budget and our experience with this contractor on several previous projects has been very satisfactory. The Finance Committee has reviewed this matter and recommends a contract award to Lou Silver, Inc. A copy of the bid tabulation is attached 0 the Council Order. D, Managers Comments: +q M'C awger Associated Information: Budget Approval: Finwce Dim(w Legal Approval: �L +ry sd�uw Irrcrod For: Passage F7 First Reading Ref al Page of 97-333 Aeeigned to Councilor Leen July 28, 1997 _4 CITY OF BANGOR (TITLE.) (Orbe% Author®ug Award of Sid for Fl@eath Strest Are I a Sewer Separation Project BY the City Council of the City Oft a sor: ORDERED, TR4T the award of bid is hemby made to Lou Silver,1 i . for the Fifteenth Street area sewer separation project in the amount of $564,313.85. IN Gin COUNCIL July 28, 1997 Passed EM 9I-333 O ROER Title, Authorizing Award of Bid for Pifteea[T Street Area Sewer Separation project ...................................... ..........�........................... ../ 6' Moped to ..... ..... .... ������ �� �� Councilman V^W4 .s'..`„ � 97-333 CITY OF BANGOR Mu AWARD RRCOMMENDAMO BID ITEM(S): Fifteenth Shed Area Sewer Separation DEPARTMENT: Eneimaing BUDGET RERERENCR: Requisition No.: 50140 Account Number: 807691NS700 Budgeted Amount: $_ Available Balance: $ pending We ofbonds Total Amount of Award Recommended: $564.31385 Vendor Recommended: Lou Silver, Inc. Number of Bids Seat: 9 Number of Bids Received: 4 Date Advertised: lune 30 1997 Bid Opening Date: July 16, 1997 Past Experience with Vendor: _Excellent X Good —Pair Poor_ No primexperimce If no experienm references checked or other method of vendor reliability established OTHER COMMENTS: Awmd the contract for the FiHemN Sheet area sewer separation project to Lou Silver, fnc. the low bidder at $564,313.85. The engimax's estimate was 568,907.00. This award is contingent upon City Co lin 3' the jec[ia ovm$100,000.00. Purchasing Agee APPROVALS CITY COUNCIL FINANCE COMMITTP.B: Date: lulu 21. 1997 COY OF BANGOR P Ial BOTABUTAnON - BM OpmNm: July 16, lm FlFTEEXTN ETAREIBEYIEILBEPRM1gN MIRE I- �IMWUMMM MUM 97-333 July 18, 1997 TO: David N. Pellegrino, Purchasing Agent FR: James D. Ring, City Engineer RE: Bid Award- Fifteenth Street Sewer Sepaimion Project On July 16, 1997, four bids were received for the Fifteenth Street Sewer Separation Project This project is a continuation of our ongoing efforts to separate storm and sanitary flows in this part of the City. The low bid of $564,313.85 submitted by Lou Silver, Inc. compares favorably with our Engineer's estimate of $568,907.00. Silver bas successfully completed similar City projects previously. Acwrdingly, bid award to Lon Sdvef, Inc. is recommended.