HomeMy WebLinkAbout1997-07-14 97-325 ORDER'OONCIL ACTION Item No W-325 Dale: 7-14-99 IteMSubject ORDER: Authorizing Award of Bid for Fountain Street Area Sewer Separation Project Resportible Department: Eogiveering Commentary: On July 2, 1997, bids were received for the Fountains Street area sewer separation project This project is a continuation of sewer sepaation in the "Meadowbrook" drainage subsection as required in the Citys CSO control program. The low bid of$726,834 submitted by Campbell Construction of Brewer, Maine is well within ourproject budget and our experience with this contractor on several previous CSO projects bas been excellent. The Finance Committee has reviewed this anent and recommends a contract award to Campbe6 Con Ruction. A copy of the bid tabulation is attached to the Council Order. Department entH Manager's Comment: e f CityMa ager Associated Information: Order, Bid Tab, Memorandum Budget Approval: Finance Director Legal Approval: city �gj�fv� yJ�M6r Introduced for ✓ Pasage _First Reading PW—Of— Belong 9)-325 M gnedto Co mor Sullivan July 14. 1997 :r CITY OF BANGOR (TITLE.) Wrb¢rr .... A'thonzmg award of std for Fountain street Area sewer By W City oourieit of Wu CUM of8apor: ORDERED, T"T the award of bid is hereby made to Campbell Construction for the Fountain Shen area sewer separationproject in the amount of $726,834. IN CITY COUNCIL July 14., 1997 Passed CITY BRR I 9]-325 O ROER Title, AutTorizing Award of Bid for Fountain Street Area Sewer Separation "'I ant Aepigned tp - Su(liu�n ...........................:u n c i..... Councilmen CITY OF BANGOR BID TABULATION FOUNTAIN STREET SEWER Page 1 of 2 Bid Opening: July 2, 1997 Campbell Construction Brewer, Maine Brescia Construction Sinton Maine ITEM DECRIPTION OTY UNIT Unit Price Total Price Total Price 1. Trench & Structural Rock Excavation 725 50.00 36,250.00 83,375.00 2. Pre -Blast Surveys 200 as 50.00 10000.00 10,000.00 3. Miso Excavation&Replacement Backfill 20 20.00 4W.00 240.00 4. Excavation Below Normal Grade 20 25.00 500.00 i6O.W 400.00 5. Test Pits 120 se 195.00 23,400.00 6,000.00 6. 8" PVC Sanity Sewer Pi 3,155 M 41.00 129,355.00 154,595.00 7. 10" PVC Sanity Sewer Pi 437 H 41.00 17,917.00 22 724.00 6. 12" PVC Sande Sewer PI 408 If 43.00 17,544.00 22 848.00 U. 15"PVC Sanaa Sewer Pi 506 K 46.00 23276.00 31,372.00 10. 6"PVC House Service Latenals 2,570 1 37.00 95,090.00 128,500.W 11. 10" Catch Basis Leads 13 ea 740.00 9,620.00 1100.W 14 300.00 12, 12" PVC Storm Drain Pipe 350 If 39.00 14,040.00 60.W 21 600.00 13. 15" PVC Stonn Drain Pie 233 H 47.00 10,951.00 64.00 14,912.00 14, 21" PVC Stonn Drain Pie 422 If 64.00 27 006.00 73.00 30,806.00 15. 24" PVC Storm Drain Pipe 415 If 72.00 29,880.00 80.00 33 200.00 16. 27" PVC Storm Drain Pipe 557 d 79.0) 44,0t2.00 89.00 49,573.00 TT 4Sewer Manholes 159 of 200.00 31,800.03 260.00 41,340.00 18. 4' Drain Manholes 25 of 200.00 50)0.00 260.00 6,500.00 19. 5'Drain Manholes 24 of 350.00 8,40).0) 370.00 8,880.00 20. 4' Catch Basins 4 as 1600.00 6,403.0) 2100.00 8,400.00 21, Manhole Frames & Covers 32 as 400.001 12,800.00 WO.001 12,800.00 22. Catch Basin Frames&Grates 4 ea 400.00 1,600.00 410.00 1,640.00 23. Temporary Trench Pavement 8,000 s 5.50 44,000.00 5.00 40,000.0) 24. Permanent Trench Pavement 7,150 s 12.00 85,800.00 77.00 78,650.00 25. Permanent Trench Pavement driv S. etc. 650 5 14.00 9,100.00 22.00 14.3001 26. Calaum Chloride Dust Control 20 ton 400.00 9,200.00 000.00 12,0001 27. Water Dust Control 100,000 al 0.10 10,000.00 0.08 B,DOOW 28. - 1-MoliNzaborl 1 1 Is 13500.00 13,500.0015000.00 15000.00 TOTAL AMOUNT BID 726834.00 871955.00 9]-325 July 3,199.1 T0: David N. Pellegrino, Purchasing Agent FR: James D. Ring, City Engineer SUBIECT: Bid Award- Fountain Street Area Sewer Separation Project As you know the low bid for the above - referenced project was submitted by Campbell Construmion of Brewer, Maine in the amount of $726,834. We have a total budget for this project of $900,000, which includes design, inspection, administration, etc. as well as construction. Campbell's bid for construction is within am budget. Campbell has previously completed a number of am sewer separation projects for the City, and our experience with this contractor has been excellent. I recommend that the Fountain Steel Contract be awarded to Campbell Construction in the amount of $726,834.00. Please let me know if you need further information. - Ilgll 97-325 CITY OF BANGOR _ AWA D RFS NDATIt7N Bra ITEM(S): Fountain Street Area Sewer Sep a fion Pro'ect DEPARTMENT: Engineering BUDGET REFERENCE: Requisition No.: 50138 Account Number: 8076-91008700 Budgeted Amount: $ Available Balance: $ pending sale ofbonds Total Amount of Award Recommended: $72683400 Vendor Recommended: Camobell Connmction Number of Bids Sent 6 Number of Bids Received: 2 Date Advertiscd: June 131999 Bid Opening Date: July 21997 Past Experience with Vendor: X Excellent_ food —Fair— Poor —No prior experience If no experience, references checked or other method of vendor reliability established OTHER COMMENTS: Award the contract for the Fountain Street area sew" separation project to Campbell Construction Company the low bidder at $726,934,00, The engineer's estimate win $ 908,594.00. This award is contingent upon City Council Approval since the project is over $100,00000. Pur A APPROVALS CITY COUNCB, FPIANC�F CA fffTEG: late: PAY 7. 1997