HomeMy WebLinkAbout1997-02-24 97-120 ORDERilii �dZo�,
Iter M. 97-120'
Moe FeDnvry 24. 199'1
Ite /S>trlect: tl :-Awli.oat for utili[ 1,ocaeirn -Fem tr _. _.
Hlldr Street and Coffey Sf t - Bon Hydro-
. ele c Ca:Qany
A�iUe Lipa nt: City Cletk
Application for Utility L tion p t -
Coffey Street, one pole to b located appra ately 237 feet nor -
easterly fm ti:e interaett = of Coffey/Hlldr Streets.
HildretL St t, one pole to to located approximately 1565 feet
soul ly frai t junction of Hmnmd Street.
f
Nei[ Head
Associated mfometion: aP81t, Application, F t
Finance Director
Legal Approval: d r°AF/rcl.
u
City eolfcitor
mcxoauc aror
x Passage
exec P.eeding
PeEerral Page 1 of I
9]-120
Awnp ad tO Ceendke Aube Pebmary 24, 1997
CITY OF
(TITLE.) MrDTrt _application for utility r aticn Fen:d.1. t
Coffey R:d Hildreth Streets - norwr Hydro-Kectric
cm
Bs the My Cousw offhe City of Seaver:
ORDERED,
TUT the attached application for utility location permit is
hereby !Ranted
Nota: P011owirg ere the public streets Rid higlnmys re£arred tO:
Coffey Street, one pole to ba located app seely 23'1
feet northeasterly tress the intersection Of Coffey/sildreth
Stream -
Hildreth Street, one pole to be located app mately 1565
fast scutbaTly fran the junetica Of xaen®d Street
No Public Notice Of this application to be nose.
IN CITY COUNCIL
February 24, 1997
Passed
Councilor T or Abstained
CL
9)-120
ORDER
Title, Application for utility Location f
Permit - Coffey and Hildreth Streets -
Bavgo[ Nyd[O-E1BCttiC Company 1
Assigned
eigned to
1
_ Councilmen
UTILITY LOCATION PERMIT
ways
permit
to state i
a hand or
97-120
1BANOOR7011
PLAN k 2207
1RIC COMPANY dated
eatercertain-of—its—
over and across certai.
-enobscot,
ration, n wspaper
:onnection with said
d Bangor Hydro-Electri
rate certain of its
over and across
ertai.
ereinafterset forth.
ins that any person,
subject municipality
Sr
en objection with th1.
Iter the installation
,n, said written
and to be served by
LOCATION:
COFFEY STREET, one pole to be located approximately 237 feet
northeasterly from the intersection of COFFEY/HILDRETH STREETS.
HILDRETH STREET, one pole to be located approximately 1565 feet
southerly from the junction of HAMMOND STREET.
DESCRIPTION:
The facilities will consist of a line composed of wood poles and
supports therefor, crossarms, wires and/or cables together with
associated appurtenances. The minimum
s
clearance of the w and/or
e
cables, other than guy w will rbeat least eighteen feet over
the public way. The poles will be set within the limits of the public
way, but outside the part thereof customarily used for travel by
vehicles. The initial operation of the facilities will be at 7200
volts, threephase; the voltage will be increased a occasion
therefore. requires. for the operation not in excess of 20 KV to ground.
Authorizing signature(s)
Received and Recorded in
Book ,Page Dated at ,ME,
on 19
Attes This Day of ,19_
97-120
FORM 432A - 1BANCAR7011
APPLICATION FOR UTILITY LOCATION PERMIT PLAN 4 2207
Bangor City- ouncal -City of Ba'ngor.--_.__..
BANGOR HYDRO -ELECTRIC COMPANY, a Maine corporation being duly
authorized pursuant to the laws of the State of Maine to generate,
sell, distribute and supply electricity in the City of Bangor,
County of Penobscot, State aforesaid, hereby applies for a permit to
authorize it to locate, construct, maintain and operate certain of its
facilities hereinafter described upon, along, over and across certain
Public ways situated in said City of Bangor.
No public notice of this application will be made in accordance
with the terms and conditions of Title 35-A, Section 2503, MRSA as
amended.
LOCATION:
COFFEY STREET, one pole to be located approximately 237 feet
northeasterly from the intersection of COFFEY/HILDRETH STREETS.
HILDRETH STREET, one pole to be located approximately 1565 feet
southerly from the junction of HA6IMOND STREET.
The facilities will consist of a line composed of wood poles and
supports therefor, crossarms, wires and/or cables together with
associated appurtenances. The minimum clearance of the wires and/or
cables, other than guywires, will be at least eighteen feet over
the public way. The poles will be set within the limits of the public
way, but outside the part thereof customarily used for travel by
vehicles. The initial operation of the facilities will be at 7200
volts, three phase; the voltage will be increased a
therefore requires for the operation not in excess of 20KVto ground.
Dated at Bangor, Mains B OCR HYDR ELECTRIC COMPANY
on February 14, 1997. By: IIylV'Ii k)AU110
Mary Jvo sol[
Trane n and Distribution
Job Coordinator
POLE PERMIT PLAN
3 PHASE z KV
aLAaLE<f
' f Hkoz5 rN
� y �
PL Parr' 7&
JMW
PLAN p +an]