HomeMy WebLinkAbout1996-11-25 97-19 ORDERCOUNCIL ACTION
Item No. 97-19
Date 11-25-1996
IL Subject: OMER: Application for Utility Location Permit- Bangor Nydrd-Electric
Company - Old,Puabaw Road
Responsible Depastmenti City Clerk
Application for Utility Location Permit:
OLD PUSNAW ROAD.beginning approximately 1613 feet northeasterly
from the junction of Pinson Road, two poles over a total distance
of 202 feet.
NO PUBLIC NOTICE OF THIS APPLICATION TO BE BADE
Oe ti Head
Manager's Comments:
u.
City Manager.
Associated Information: ORDER. application 6 permit
Budget Approval:
Finance Director -
Legal Approval:
Coenri6� TYlrr hAS n
cmA11"Ct OA
City Solicitor
Intruded For �_ Firset Reading
Referral Page of
9)-19
Assigned to Cowcilw ealdacci November 25, 1996
CITY OF BANGOR
(TI�'.) (Onppu ti for, Otissty Location. Pecalt Old en hav Road -
Mager Hydro -electric company
-.-......:_.... .......... _........... __. _... .............
By the My Ce%% 1i of the LSty ofBanper:
ORDERED,
TWT that the attached application for utility location permit is
hereby granted.
Nate: Following ate the public streets and highways referred to.
Old Pushaw Mad, beginning approximately 1613 feet northeasterly free
the junction of PInson Road. two poles over a total distance of 202 feet.
No public Notice of. this application tobe made.
IN CITY COUNCIL
November 25, 1996
Passed
Councilor r Abstained
cj ITT C
9I-19
ORDER
Title, Application for Utility Location
Permit - Old Pusbav Road - Bangor Nydroi
Electric Company
......................................
9L4i . ......
Councilman
9J-19
IEMMR6080
UTILITY LOCATION PERMIT
PLAN # 2175
the application of BANGOR HYDRO -ELECTRIC COMPANY dated
8, 1996, requesting permission to locate certain of its
hereinafter described upon, along, over and across certain
my to locate, construct, maintain and operate certain of
ities hereinafter described upon, along, over and across
.c ways situated insaid municipality as hereinafter set
permit is granted subject to the provisions that any per
objection to state the c of the abjection and to be served by
delivery in hand or by registered or certified mail.
LOCATION:
OLD PUSHAN RD, beginning approximately 1613 feet northeasterly from
the junction of PINSON ROM, two pole over a total distance of 202
feet.
DESCRIPTION:
The facilities will consist of a line composed of word poles and
supports therefor, crosearms, wires and/or cables together with
associated appurtenances. The minimum clearance of the wires and/or
cables, other than guy wireswill be at least eighteen feet over
the public way. The poles will be set within the limits of the public
way, but outside the part thereof customarily used for travel by
vehicles. The initial operation of the facilities will be at 7200
volts., single phase; the voltage dill be increased as occasion
therefore requires for the operation not in excess of 20 Nn to ground.
Authorizing signature(s)
Received and Recorded in
Book ,Page Dated at ,M,
on T
Attest: This Day of ,19_
uierx o
w-19
FORM 432A SBANGOR6080
APPLICATION FOR UTILITY LOCATION PERMIT PLAN p 2175
TO: Bangor City Council - City of Bangor
BANGOR HYDRO -ELECTRIC COMPANY, a Maine corporation being duly
authorizedpursuant to the laws of the State of Maine to generate,
sell, distribute and supply electricity in the City of Bangor,
County of Penobscot, State aforesaid, hereby applies for a permit to
authorize it to locate, construct, maintain and operate certain of its
facilities hereinafter described upon, along, over and across certain
public ways situated in Said City of Bangor.
No public noticef this application will be made in accordance
with the terms and conditions o£ Title 35-A, Section 2503, MRSA as
amended.
LOCATION:
OLD PUSHAW RD, beginning approximately 1613 feet northeasterly from
the junction of FINSON ROAD, two pole over a total distance of 202
feet.
DESCRIPTION:
The facilities will consist of a line composed of wood poles and
supports therefor, crossarms, wires and/or cables together with
associated appurtenances. The minimum clearance of the wires and/or
cables, other than guywires, willbeleast eighteen feet over
the public way. The poles will be Set within the limits of the public
way, but outside the part thereof customarily used for travel by
vehicles. The initial operation of the facilities will be at 7200
volts, single phase; the voltage will be increased as occasion
therefore requires for the operation not in excess of 20 Rv to ground.
Dated at Bangor, Maine BANGOR HYDRO -ELECTRIC COMPANY
on November 8, 1996. By: \'��!Aol h-`u,L;.A{\'\
ary B.,,Jac son
Transmi'esicn and Distribution
Job Coordinator
i
i
MvHsrid .. _
i
\ C
# NVId
9coaa jM 19NNNI AN 7Z. 3Sb'Hd—�
U,,i utlN-5T3
'9N3 NVId ifHcg3d 1dd
-Dr,31Va
T30T39vd