HomeMy WebLinkAbout1998-08-24 98-331 ORDERCOUNCIL ACTION
Item NO. 98-331
Date August 29 1998
Item/Subject: ORDER: Application for Utility Location Permit -
Bangor Hydro-ElectiC Company - BROADWAY
Responsible Department: City Clerk
Application for Utility Location Permit
BROADWAY, Beginning approximately 2817 feet
northerly from the intersection of BAR (INv1283),
three poles over a total distance of 590 feet
NO PUBLIC NOTICE OF THIS APPLICATION TO BE MADE
Deg rtment ad
Manager's Comments: ` M�
'I IN
/l � I1•/
Associated Information: ORDER, application & permit
Finance Director
Legal Approval: ('cuacllnr%le/ AMC(0L'15 inl VP a ron %c)
E
city salacator
Introduced for
A Passage
First Reading
Referral Page 1 of 1
98-331
A groat to CouncJor Lezu August 24, 1998
CITY OF BANGOR
(TITLE) V1 rbert APP i c t ion for Utility Locap on Permit -
NxO wAY Bangor x __-- --
9 ydro Elecdric Company
By MY of MY waaw.:
ORDERED.
MT the attached application for Utility Location Permit
is hereby granted
Note: Following a e the public streets and highways
referred for
BROADWAY, beginning approximately 2837 feet northerly from the
intersection of SA9 (TNV1287), three poles over a total distance
of 540 feet
No Public Notice of This application to be made
IN CITY COUNCIL
August 24, 1998
Passed
CI CLERK
98-331
ORDER
Title, Application for Utility Location
Permit - Broadway - Bangor Hydro -Electric
ComFany ..............................
................/....................
.................
Councilman
FORM
432A
1BMGOR8075
APPLICATION
FOR
UTILITY
LOCATION
PERMIT
PLAN $ 2423
TO: Bangor City Council - City of Bangor
BANGOR HYDRO -ELECTRIC COMPANY, a Maine corporation being duly
authorized pursuant to the laws of the State of Maine to generate,
sell, distribute and supply electricity in the City of Bangor,
County of Penobscot, State aforesaid, hereby applies for a permit to
authorize it to locate, construct, maintain and operate certain of its
facilities hereinafter described upon, along, over and across certain
public ways situated in said City of Bangor.
No public notice of this application will be made in accordance
with the terms and conditions of Title 35-A, Section 2503, MRSA a8
amended.
LOCATION:
BROADWAY, beginning approximately 2817 feet northerly from the
intersection of 8WINV1287), three poles over a total distance of
540 feet.
DESCRIPTION:
The facilities will consist of a line co sed o£ wood pales and
supports therefor, croeearms, w and/or cab es together with
associated appurtenances. The minimum clearance of the wires and/or
cables, other than guywires, will be at least eighteen feet over
the public way. The poles will be set within the limits of the public
way, but outside the part thereof customarily used for travel by
vehicles. The initial operation of the facilities will be at 7200
volts, three phase; the voltage will be increased as occasion
therefore requires for the operation not in excess of 20 Rv to ground.
Dated at Bangor, Maine BANGOR ppH\Yl"DO-ELECTRIC COMPANY
on August 12, 1998. By: {��1(" PtlW
Mary O� $ac eon
Transmission and Distribution
Sob Coordinator
1BA WR0075
UTILITY LOCATION PERMIT
PLAN N 2423
the aoolication of
across certain
my to locate, construct, maintain and operate certain of its
.ities hereinafter described ualong, over and across certain
.c ways situated in said municipality as hereinafter set forth.
permit is granted subject to the provisions that any person,
or coroor tion owning orooerty within the subiect municipality
by
in hand or by registered or
LOCATION:
BROADWAY, beginning approximately 2817 feet northerly from the
intersection of SWINV1287), three poles over a total distance of
540 feet.
DESCRIPTION:
The facilities will consist of a line composed of wood poles and
supports therefor, crossarms, wires and/or cables together with
associated appurtenances. The minimum clearance of the wires and/or
cables, other than guy irewill be at least eighteen feet over
the public way. The poles will be set within the limits of the public
ay but outside the part thereof customarilyy used for travel by
vehicles. The initial operation of the facilities will be at 7200
volts, three phase; the voltage will be increased as occasion
therefore requires for the operation not in excess of 20" to ground.
Authorizing signature(s)
Received and Recorded in
Book ,Page Dated at ,ME,
on 19
Attest: This Day of ,19
Clerk
BOnQOA
F
POLE
ERMIT PLAN
ENG-Pe--CAD oD
rE
Flt
PHASE 9. 2 K V
p / Bo $Op 2H23
S ,
L
-
y
89j
.937
���'4303
SiO 9G'G�'
Sh ?91
af /s
w 41'
4
U
v
V
k
a
wA