HomeMy WebLinkAbout1998-07-13 98-302 ORDERCOUNCIL ACTION
Date:
M07W hem Ne:99-302
Itenn/Subject Authorizing Award of Bid for 1998 Street Paving and Rehabilitation Contract
Responsible Department Engineering
Commentary.
On July 1, 1998, bids were received for am =us] streed paving and rehabilitation contract.
Lae Finance Committee met on July 8tb,
1998 and has reviewed flus matter and recommends
contract award to Lane Construction.
Attached is a tabulation ofbids received and
also a Use of streets to be paved Unss\year .
•pMnmtt Hr�
M gee(��r'�'s
�Co�mments:
lZlan—
RSS1 Cirymarmge.
Assodated lvfoumaaon:
k) O)AA" )&j S��L
Budget Approval:
Finance Director
Legal Approval:
ciysatmua.
Introduced For:
Passage
First Reading
Referral
Page of
sImdm
Aeeipred to Cwa,cilw Tylet July 13, 1998
CITY OF BANGOR
Aothonang Award of Bid for 1998 Street Paving and Rehabbttafion Conhact
By W My Cnnaml of CW MBaaaw:
ORDSBBD,
MT this award of bid is hereby made to Lane Construction for the 1998 street Paving
and rehabilitation contract in the amount ofS01,373.00.
IN CITY COUNCIL
98-302
dulY13. 1998
O R D E R
Motion for passage made 6
seconded
Passed
Title, Authorising Award of Bid for
1998 5treet Paving and Rehabilitation
Contract
esa
A gp�w/d to
T% ................................
Councilman
CITY OF BANGOR Page 1 of 7
BID TABULATION Bid Opening: July 1, 1998
�--'Coa
or, Meine
Inter ort, Maine
-- --Unit
DESCRIPTION
QTY
UNIT
Price
Total
Price
Unit
Price
Total
Price
MMUNITY DEVELOPMENTuminous
Concrete
7078
tons-
24.20
26,039.20
28.00
30,128.0uminous
_ _
Tack
290
al
2.00
580.00
2.27
668.30
EC�oncre�
TY OF BANGOR STREETSuminous
Concrete
11,774
tons
23.20
273,156.80
28.00
329,672.0minous
Concrete su rpav�_
4,000
tons
23.20
92,800.00
30.00
120,000.00
ld Planin Pavement
2,506
s
2.00
5,012.00
2.00
5,012.00
tuminous Tack
5,000
al
2.00
10,000.00
2.27
11,350.00
_ _
'ust Catch Basins
20
ea
460.00
9,000.00
300.00
6,000.00
e Iastic Directional Arrows
800
sf
4.75
3,800.00
__9.OD
7,200.00
e Iastic Center Line
1,000
H
0.48
480.00
2.00.
2,000.00
erm Iastic Sto Bars
2000
H
3.651
7,300.00
5.75
11,600.00
11.
4" Painted Lines -White _ _ _
4" Peinled Lines - Yellow
PARKING LOTS....
1,000
If
0.75
150.00
__ 300.00
12.
- 4,000
If
0.13
520.00
_ _0.30
0.30
_
1,200.00
13.
Bituminous Concrete
1,625
tons
31.80
51,675.00
28.00
45,500.00
15.
_
Bituminous Tack
430
el
2.00
860.00
2.27
976.10
TOTAL AMOUNT BID
487 373.00
1571A96.40
98-302
If no experleseq references checked or other method of vendor reliability established
OTHER COMMENTS:
Award the contract for paving City sheets to Lane Construction Company of Bangor the low
biddernt $661,373.00. ($23.20/ton and $21.20/ton for CommunityDevelopment).
Last year the City's paving cost was $29.00hon and 530.60/ton fa Community Development.
This award is contingent upon City Council approval as it is over $100,000.00.
Par Agevt
APPROVALS
CITY COUNCIL FINANMvIITiEE
, H
Dae: July 6, 1998
ARD
CITY OF BANGOR
REC MM M d MN
BID ITEM(S): Paving CN
Sweets
DEPARTMENT: Engineering
BUDGET REFERENCE:
Requisition No.: None
Account Number:
Budgeted Amount $ 575 000.00
Available Balance: FY" Budget
Total Amount of Award Recommended: $681.373.00
Vendor Recommended: Lane Construction Company
Number of Bide Sent: 6
Number of Bids Received: 2
Daft Advertised: _
Bid Opening Date: July 11998
Past Experlencewith Vendor: X
Fs ilent_Good_Fa _Poor_Noprioreaper=e
If no experleseq references checked or other method of vendor reliability established
OTHER COMMENTS:
Award the contract for paving City sheets to Lane Construction Company of Bangor the low
biddernt $661,373.00. ($23.20/ton and $21.20/ton for CommunityDevelopment).
Last year the City's paving cost was $29.00hon and 530.60/ton fa Community Development.
This award is contingent upon City Council approval as it is over $100,000.00.
Par Agevt
APPROVALS
CITY COUNCIL FINANMvIITiEE
, H
Dae: July 6, 1998
98-302
SCHEDULEA
Bangor Community Development Projects
(Subject to Federal Labor Standards Provisions)
WORK FST.
STREET SECTION LENGTH INCLUDED QUANTTTY
Carroll Street
Third W Fifth
730'
SK"
O.L.
167 T
Fourth Street
Warren to Union
1,850'
11"O.L.
645T
Second Sweet
Union to Cedar
655'
11"O.L.
264T
ScheduleATond 1,076Tons
1998 Paving B-8
98-302
SCHEDULES
East Side Paving
1998 Paving B-9
WORK
EBT.
STREET
SECEION
LENGTH
MCLDDED
QUANTITY
lµ
1130' South from Compact
1130'
IK"
O.L.
295 T
Broadway
Line
Church Road
3800'Ean from Pushaw
3800'
1'k"0.L.
868T
Darling Parke Dr.
Entire
900'
1"
O.L.
225 T
Pam Street
600'south Ram aft, Hope
600'
1E"
O.L.
243 T
Garland Street
Belleveueto Howard
410'
IA"
0.L.
116T
Garland Street
Pearlto Binh
570'
ca.ovunma
1773 S.Y.
I4e"
O.L.
174 T
Griffin Road
Bridge to Kend. Ave.,
615'
1'A"
O.L.
261 T
Header Road
Entire
1162'
IS"O.L.
354T
Howard Street
Garland to Mt Hope
1980'
1'/."
0.L:
561 T
Kenduskeag Ave.
Hasson to Griffin
3200'
1W
O.L.
900T
Kenduskeag Ave.
3000' North form Griffin
3000'
1'h"
O.L.
785 T
Maple Street
Garland to Mt Hope
1415'
1'h"
O.L.
801 T
Milford Street EM.
Essex to School
800'
1"0
L.
160 T
Nash Street
Brewster d Lowen
300'
P
O.L.
65T
Norfolk Street
Montgomery in Linden
987'
1 :"
O.L.
290 T
Oak Street
York to Hancock
400'
1pa"
O.L.
226T
Palm Strait
Garland to Stilhvater
2588'
1'8"
O.L.
807 T
Roger Street
Entire
671'
114"
O.L.
19D
Shady Lane
Entire
' 628'
I"
O.L.
145T
Somerset Street
Center to Bmadwav
600'
I'h'O.L.
261T
State Street Ave.
Entire
379
1"
O.L.
49 T
Stillwater Avenue
Forestto Palm
40V
I&"OL.
157T
Thomson Road
1150' North from Roger
1150'
1'S'
O.L.
338 T
1998 Paving B-9
98-302
SCHEDULEB
1997 East Side Sewer Project
Overlays:
1998 PAVING Bd0
WORK
EST.
STREET
SECTION
LENGTH
INCLUDED
QUANTITY
Blackstone Street
Fountain to Leighton
210'
1"O.L.
39T
Center Street
100'@ Garland
100'
1"O.L.
25 T
Congress Street
Fountain to Leighton
210'
1"O.L.
60 T
Division Street
Jefferson to Kenduskeag
1085'
1"O.L.
2n T
Fountain Street
Jefferson to 150' Yonb of
1590'
1"O.L.
440T
Montgomery
French Sonat
Garland to 200' South
200'
1"O.L.
4]T
Garland Street
Center to Pine
121P
I"O.L.
222T
Leighton Street
Madison to Montgomery
810'
1"O.L.
189T
Market Street
South Pink to Division
285'
1" O.L.
72 T
Prentiss Street
Division w Jefferson
380'
1"01.
76 T
1998 PAVING Bd0
98-302
SCDEDULEB
West Side Paving
1998 Paving a-11
WORK
EST.
STREET
SECTION
LENGTH
1NCLMED
QUANTITY
Bald Mm Drive
Fhison to Moosehead
800'
1-O.L.
199T
Charles Street
Highland to Ohio
212'
111O.L.
84 T
Comment Road
Silver Road to Tum
400'
1'H'O.L.
131T
Davis Road
Union to Tam
1441'
11/2" O.L.
329T
Dean Sweet
Entire
560'
1"O.L.
126T
Dowd Road
Cul -De San
1331'
Ph"O.L+
400T
smmse>awas
erg
First Street
Union to Cedar
655'
1"O.L.
184T
Fort Knox Ave.
Moosehead to Deer his
565'
PO.L.
113 T
Hammond Street
Union to Fifth
tatV
1'k"O.L.
300T
Union Sr Intersection
150'
mid suwi^s
733 S.Y.
High Street
Hammond to Middle
525'
1'h" O.L.
222 T
Lane Street
Entire
530'
1.O.L.
115T
Larkin Street
Third to Seventh
2656'
1"O.L.
616T
May Street
Summer to RR. Tracks
390'
1)A"OL.
127T
North Street
Entire
420'
1"O.L.
70T
Pond Street
Entire
650'
1"O.L.
166T
Mirmal Street
Main to Summer
140'
1'h"01.
85 T
Savage Street
Webster to Vernon
348'
1"O.L.
104T
Savage Street
W. Broadway to Seventh
491'
1"O.L.
146 T
Silver Roel
Webmr to Graham
225'
1Sl- O.L
423T
Smith Street
Entire
1125'
1"0.L.
145T
Smith Swett Ave
Entire
430'
VO.L.
68 T
Sunny Hollow
Entire
1695'
VO.L.
421T
Yankee Ave.
Entire
1563'
1"CLL.
389T
1998 Paving a-11
98-392
ScheduleBTonds: Paring--15,774Tow
Cold Paving - 2,506S.Y.
1998 PAVING H-12
SCHEDULES
1997 West Side Sewer Project
Overlays:
wom
EST.
STREET
SECTION LENGTH
TsCLUOEN
QUANTITY
Allen Stre t
Fourteenth to Dead End 990'
1"0L.
190 T
Brookline Aw.
Ralph to 190' Santa 190'
1"O.L.
32 T
Falifex Street
Dead End to I I W had of 530'
1"O.L.
97T
Fifteenth Street
Fifteenth Street
Allen to 60 Notth of Union 2580'
1"O.L.
591 T
Fourteenth Sneet
Allen oe Fairfax 360'
VOL.
90T
Ralph Stteet
Brookline to 150'East of 450'
1.0.1,.
95T
Fifteenth Street
ScheduleBTonds: Paring--15,774Tow
Cold Paving - 2,506S.Y.
1998 PAVING H-12
98-302
SCHEDULE
Parking Lots
LOCA130N DESCRIPTION OF WORK MT. OTY,
Fourteenth Street Teacher's Parking Lot and 157 T
School Adjacent Drive(Southwest
Side of Building) --
V 0.1,
Paved Area Behind School 145 T
1 -In" O.L.
Vine Steel School Area Between Wings STI'
on Fifth Street Side
1-1/2" O.L.
End and Back of Lower Wing 28T
t" O.L.
Larkin Street Side of Lower 75T
Wine and Area Between Wings
(City to open fence for access if me)
1-ln" O.L.
Area by Cafeteria(Larkin St Side) 50T
1 -In" O.L.
Fairmount School Paved Playground behind School
215T
and area between Nonlinear Side
of School and Fence
1 -In" O.L.
Teacher's Parking Lot
127T
I-1/2" O.L.
Downeast School C, Wing Fire lane
42T
14/2" O.L
'C -D' Wing Playground
120T
1 -In" O.L.
I:DkI
PAVE9000OC
98-302
^-'
LOCATION
SCHEDULE C
Parking Lots continued
DESCRIPTION OF WORK
EST, OTY,
Abraham Lincoln
Teaches Parking Lot
175T
School
and Drive on Parkview Ave Side
1-12" O.L.
Wary Show School
Teachees Parking Lot and
69T
Adjacent Walk
1-12"O.L.
Handicap Parking Area and
45T
End of Building
1.1/2" O.L.
Central Fire Station Parking and Drive Areas 320T
including approximately
606 SYof2" Binder plus approx -
3075 BY of Shim and
I" O.L.
PAHKING LOT TOTAL 1625T
NOTES: I. Estimated QuanUtres include approximately 15%
for shim ninr as necessary.
2. All school paving must be completed up later than
Augur 21 1998
RISE!
Pwns9sC.000