Loading...
HomeMy WebLinkAbout1998-06-22 98-270 ORDERRem No__56_up Date: 622-98 lom/Subjeca ORDER: Authorizing Approval of an ApplicationforUtitityLocationPermit- Portions of Broadway, Falvey Street, and Heaven Avenue- Bangor Gas Company Rspomible Department: Engineering Commentary: As the Council is aware, Bar par Ges Company is planning to install normal gas disuibution lines in areas where other construction activity is undertaken in order to avoid separate future excavation. Council Order 98-234, approved on 529/98 granted a utility location penoit for installation of gas lines at the lower end of the ongoing Broadway widening project. The coached Council order would anhodze installation ofps lines in the remaining mea included in the Broadway widening project The new gas lines will be installed in sidewalk areas where sufficient space is available. Detailed location and construction plans have been submitted to and approved by the City Engineer and we available for review. 4DT � Head Manager's t:ommeab: City Manager Associated In Immation: Order Budget Approval: Plasmas Direcw Legal ®Approval: CpJn[i �ar T lir OwId Ob5�Gie' n &4t a(15C0551domNl odj/i5 do f1'15 Ul jfflYl. / City Somm favemwd for Plump _ Find Reading page—of- - age—of_ Relarral Amignwi to Councaor Farnham June 22, 1998 CITY OF BANGOR (TITLE.) VOTbBTf APPhcationf._UtlhtyLocation Panty-PonlonsofBroadway,Falvey ................ . Sheet, and Hussun Avenue -Bangor Gas Company, LLC . ............... ........_.— _.. ....... _ _.. BY W Cay Caunail of W My ofBarpw: ORDERED, THAT the attached applicatlon for a utility location paardt submitted by Bangor Gas Company, LLC for the installation and maintenance ofundargrmmd natural gas distribution lines is beneby approved, Provided that A work is done in accoNance with City of Bangor Street Opening Regulations and any additexud requirements of Me City Engineer. NOTE: Following are the public streets referred to: Broadway, from approximately 1100 feet north of Mary Snow School to approximately 200 feet north of Human Avenue. Falvey Street at Broadway. Hassan Avenue 9 Broadway. NO SEPARATE PUBLIC NOTICE OF TRIS APPLICATION TO BE MARE. IN CITY COUNCIL Tune 22,1998 Passed Councilor Tyler Abstained cx reek 98-270 O NUee Title, Application for Utility Location Permit - Portions of Broadway, Falvey. Street and Guests Avenue - Bangor Gas compeby, - LLC......................... .....-....(.........�............................ it 311AAZ Nom.(aa Q. ........... Councilmen LOCATION PERMIT APPLICATION FOR BURIED NATURAL GAS PIPELINE To the Bangor City Council: Bangor Gas Company, LLC respectfully requests permission to place and maintain buried pipes, valves, caps, valve boxes, manholes, tracer wires, warning tapes and other fixtures in, along, under and across portions of the surface of the following public strums and highways: Broadway (Route 15), Falvey Street, Hopson Avenue The above -referenced pipes and other fixtures will be placed in accordance with attached plans (Stare of Maine Department of Transportation -Bangor, Route 15: Gas Main added by RK&K, May 1998) and the attached "Description of Proposed Work For Bangor Gas 6' Steel High Pressure Gas Main & 6" Polyethylene Intermediate Pressure Gds Main on Broadway, Route I5'. Also for permission to piece and maintain the previously described pipes arta other fixtures in, along, under and across the above or intersecting public ways for the propose of making connections with such other portions of dm normal gas distribution system and buildings as may be desired for distributing purposes. Respectfully submitted by: Bangor Gas Company, LLC 8 June 1998 City of Bangor Location Permit Approval Dam: Description ofProposed Work For Bangor Gas 6" Steel High pressure Gas Main 6" Polyethylene Intermediate Pressure Gas Main On Broadway, Route 15 As depicted on the enclosed set of construction plans, need] 40 meters (131.2 feet) of parallel 6" steel high pressure gas main (ST He GM) and 6" polyethylene intermediate pressure gas main (PE IF GM) antler the existing sidewalk beginning 7.90 meters (25.92 feet) right of Broadway center line survey station 10+038. Offset dimensions in this narrative are provided to the centerline of the ST GM only. Refer m the plans for offset dimensions to the PE GM. Install approximately 64.0 metas (210.0 feet) of parallel main order the proposed sidewalk to 12.20 meters (40.03 feet) right of Broadway centerline survey station 10+141. Install approximately 4.0 meters (13.1 feet) of pamllel main to 15.05 meters (49.38 feet) right of Broadway emtatiae survey station 10+143.7 to make crossing of I-95 north bound on and off ramps. Cross 1-95 ramps with approximately 37.0 meters (121.4 feet) of parallel gas main. histall 2.5 meters (8.2 fee[) of parallel gas main to 2.60 meters (41.34 feet) right of Broadway centerline survey station 10+182.5. Install approximately 46.0 meters (150.9 feet) ofparallel gas main under the sidewalk along the wolfhound lanes of Broadway to station I0+228.5 where the 6" PE will tie in to the 4" PE installed across Broadway. frotall approximately 57.5 metes (188.6 feet) of pampel gas main under the proposed sidewalk along the Broadway north board lanes to 9.20 meters (30.19 fear) right of Broadway centerline survey station 10+286. Wtal approximately 4.5 meters (14.8 feet) ofpamllel gas main to transition the main to under the proposed north beard lane to 5.90 meters (19.36 feet) right of Broadway centerline survey station 10+289. Proceed for approximately 179.0 meters (587.3 feet) at 5.90 meters (19.36 fee[) right of the Broadway centerline to station 10+46695. Enttall a 1" PE gas service live aeross Broadway at station 10+340.5. To msidon approximately 4.5 meters (14.8 fee[) of parallel gins mains to underneath proposed sidewalk 0 9.15 meters (30.02 feet) right of Broadway centerhne survey station 10+470. Install approximately 295.0 metas (967.8 feet) of parallel gas mains underneath the proposed sidewalk adjacent W the northbound lava of Broadway from stations 10+470 W 10+763. -As proposed ST gas main will lie between 8.60 meters (28.22 feet) and 9.55 meters (31.33 feet) right of the Broadway centerline. Install approximately 29 70 meters (97.4 feet) of CPE IP GM across Broadway to me south side of Falvey Street a station 10+576.75. Install approximately 2.5 metas (8.202 feet) of parallel gas main transitioning from underneath the proposed sidewalk W underneath the proposed roadway 7.70 meters (25.26 feet) right of Broadway centerline station 10+765. Install approximately 30 meters (98.4 feet) of parallel gas main 7.70 meters (25.26 feet) right of Broadway centerline to station 10+795 to toss the divided parking lot entrance. Install approximately 3.0 meters (9.8 feet) of parallel gas main to hamsition to undemeath the proposed sidewalk 9.70 metas (31.83 fen) right ofBmadway centerline station 10+797. Install approximately 269.5 meters (884.2 feet) of parallel gas main underneath the proposed sidewalk from 9.70 meWrs (31.83 feet) to 8.75 meters (28.71 feet) right of Broadway centerline to station 11+064]5. I tall approximately 3.0 meters (9.8 feet) of pamtlel gas main transitioning to underneath the proposed northbound inside has to 6.20 meters (20.34 feet) right of Bmadway cedterlme to station 11+067 at School Sheet. Install approximately 168.5 metes (552.8 feet) of parallel gas main underneath the roadway A 6.20 meters (20.34 feet) right of the Broadway centerline to avoid AT&T telecommunications cable. One -inch PE ger service lines will be installed at stations 11+099, t I+130, 11+160, and l l+190 in order W reduce the possibility of having W excavate the pavement in the future. At station 11+231 approximately 33.5 mesas (109.9 fat) of 4" PE GM will be installed across Broadway to Husson Avenue. Install approximately 3.0 meters (9.8 feet) of parallel gas main from tmdemeath the roadway pavement to underneath the proposed sidewalk 8.75 meters (28.71 fee[) right of the Broadway comedies to station 11+235 at Husson Avenue. Install approximately 82.0 meters (269.0 fceQ of parallel gas man underneath the proposed sidevolk at 8.75 meters (28.71 feet) right of the Bmsdway centerline to the project end at station 11+317.5. All PE gas mains shall be installed at a minimum depth of finished cover of 3 feet. Gas mans may be installed by conventional trenching or dvectional-drilling techniques as determined appmpriate by the command. All gas mans shall be pigged, capped and tested to 100 psig with clean, dry air for four (4) hours. Road and sidewalk surfaces shalt be replaced with atone and temporary asphalt as shown on the plan details.