Loading...
HomeMy WebLinkAbout1998-10-26 98-419 ORDERCOUNCIL ACTION Date: /0-4(-fr Item No.: 98-419 Item/Subject: Authorizing Award ofBid-Penobscot River Bulkhead Reconstruction Basponsible Department Engineering Commwtary: As the Coumil is aware, the wood cribbing bulkhead on the waterfront is rapidly deterioreting. The attached Council Order approves the bid for reconslcucfiov of the worst section of bulkhead. The low bid submitted by Construction Divers, Inc. of Gorham represents a cost of $1,372.80 per linear foot, which compares very favandly with =her estimates ($2,000/L.Ff) and other bids received. Several references were checked and all were very positive. A copy of the tabulation of bids received is anached. Ci q, artmuo Head Manager's Comments: Arf1 440A Associated InfortW ion: Budget Approval: FimmeD xW Legal Approval: ry lzitw Introduced For: /�,,.�y ® Passage lOI1X/il First Reading Referral Page of 98-419 Amapa to fqn McBean Mtobet 26, 1998 CITY OF BANGOR (TITLE.) (Orberr ............. Authorizing Award of Bid Penobscot River Bulkhead Reconstruction By da City Coattail of as City ofBai wr: ORDERED. THAT award of bid to Construction Divers, fee. of Gorham, Maine is hereby approved in the meant of $168,854.71 for the reconstruction of a portion of the Penobscot River Bulkhead in the vicinity of City Dock No. 4. IN CITY COUNCIL 98-419 October 26, 1998 O R D E R Passed Title, Authorizing Award of Bid - Pen- obscot River Bulkhead Reconetructlon ITY 18RR ,...................................... ...................................... Aeeegnd to CCfm ..................................... Councilman MR ' CITY OF BANGOR AWARD RE(,'OMMENDATION BID ITEM(S): Penobscot Rive Bulkhead Reconstruction - Dock 4 DEPARTMENT: Engineerma Requisition No.: None Account Number: Account Number has vet m be assigned Badgered Amount: $ Available Balance: $ FY9913ond Issue Tend Amount of Award Recommended: $168,854.71 Vendor Recommended: Construction Divers Inc. Number of Bids Sent: Il Number of Bids Received: 6 Date Adverdsed: October2.1998 Bid Opening Date: October 14 1998 Past Experience with Vendor: _Excellent_Good_Fwr_Pom_Nopnore,ryenence If no experience, references checked or other method of vendor reliability established X OTHER COMMENTS: Award the contract for the Penobscot River Bulkhead Reconstruction - Dock 4 to Construction Divers, Inc. of Gorham the low bidder at$168,854.71. This award is contingent upon City Council approval as it is over $100,000.00. CIPYOFBANGOR BID TABULATION PENOBSCOTRNERBUI - -- -- --- Corset riven, Inc Lo^9's Marine Sem'ws Omtlem. Metre 'n ten. Melte end &Reed Inc. Wc01rAd1 Mahe ITEM DESCRIPTION QTY UNIT Unit Pace Total Unit Tool Price Price Price Unit Price Told Price Exiatinglhrerpluaen 1.600 134.0 1900 19.00 26,000.00 14.0021000.00 1 _ Fumisa& lnelall meant Piling 123 It 784.7 98,526.71 629.02 101,969.0 925.00 113.775.00 2- S_Mpp Repiace&Comeau E; ling_Overouncem _ 1500 ry _ _ 8.00 12 o.00 12.10 16,150.00 8.00 12.000.00 9_ _%are&C: Remove EUMingTm6m Ct3Maa _ 2FA 50.00 15,000.00 2.60 8,000.00 30.80 7,]0000 25.00 6,2504.0 4. a Fil Material 1.000 fi9B.o9 6.00 9000.00 12.10 1&,150,00 11.00 16151 5. FumOM1 Greacar Fill 6100.00 WO 8,000.60 6.00 31250.00 20.35 10,1]500 L00 3500.00 6. Fumtah& lnarall Tie -hada no B 25.66 ],698.00 11.3] 3,411.00 SOBS 15.0000D _ 7. Fum& B Install Bulk Concrete 8 462.50 5]W.Oo 459.25 3,8]4.00 4]5.00 3.00000 8. Fumi5M1 Is Install 4 1,275.00 5,100.00 1,01825 4073.00. 1000.00 4000.00 9. Famish& Install Dock suo� 2 e 3,200.03_ Bp00.00 2,513.50 5,02700 4.6CO.M 9,600 CU 10 Fumah&I tall Ramp Suppo^_ _ _1_I 9,500.03 2130.00 2,130.00 5,000.00 5,01 11. Rsmo Replace, Famish 816411 Chain Link Fema 1 s 12. FTopsail arrah&SeardWal - 1,660 sy 13. Futmsh&Ins411 Filter Fehnc 200 sy TOTAL _AMOUNT BID _ _ ],600.60 088 1.50 _ __9500.00 _ 6_0000 3.060.00 380.00 _ -] _ , --- _ 3500._00 3500_.0_0_ 2.84 264000 3.00 34.0000 _600.00 30000 _10.00 2,000.00 166&54.71 ell,1]& _ 4.00 BOo.00 98 .03 ---- -- - - ---caryEellCuuJtuvtlon DESCRIPTION Ott UNIT Fum h A Ina4Y Shad Plling_ 123 II Brrvrer, Main.WClrnmone, Unit Tr_.._. Pfice PrPeke 111300 13800 lnc. an&gmpewA Maine uML- Told -_._.-unit Pfice Brescia Cms4ctlm Combat, Name TotalITEM Pfice Rice1 1250.00 153]50.00 1ADD.00 18200.SMerftep4re&ComGed Exiatinglhrerpluaen 1.600 134.0 1900 19.00 26,000.00 14.0021000.00 9 5. Remw E.s" TIMer Cnbhng Pace& Compact FYI Matmal Furnish Granular Fill 200 1600 WO ry cy 9.DD 1100 7.00 600 1600 300 30.00 ]500.00 85.00C 13.00 19.500.00 15.00 22500.00 9.00 4,500.00 14.00 1,o00.OD6. ]. 8 9 10. 11. Furrier&Items TWbeds Farrah& Inside Bulk Concrete Fum h&I 48"N"PBng Fumufi&I dM Rack Support Fumlah& ImmNRampish&In Topsc e, Replete Furnish&Insmll penin LMk Fence Famish&saea Fumlah&Ina4Y Filler Fablc AMOUNT BID 300 8 t 2 1 1 1,000 200 H cy ea ea Is la sy sy ADDS 1WOo sW.1io 504000 612000 500000 260 1.00 . 1200 50.00 15,000.00 W.00 15,000.00 1o0 500.00 4000.00 150.00 1,2110.00 zoe 1o99.a9 4000.00 fi9B.o9 z4o9oe 10.00 5.00 2m ____2oo Bo ,MR3.00 6,000.00 12.000.00 3.]OD.W ],40000 S,W9,W 5,000.0 6100.00 5,100.00 8,000.60 4poo.00 4,400.0012. 4250.00 4.25 4250.00 4.00 40000013. _.4_00____300.00_ 284800.00 400800.00TOTAL _�278250.OU