HomeMy WebLinkAbout1998-09-28 98-383 ORDERCOUNCIL ACTION
Dow: September 28. 1998 Item No.: 98-383
ORDER:
Item/Subject AWARD OF RID FOR DAVIS BROOK SEWER SYSTEM UPGRADE PRMCT ON
PATTEN STREET
Responsible Department: Engineering
Commentary:
Tbis order would award a contract for the Pollen Street Sewer project. This project is part of the
Combined Sewer Overflow Program and will upgrade du existing line of Patten Street, provide
greater capacity, and alleviate a chronic problem of basement flooding on Walter Street. Ile
low bid of $355,546.53 submitted by Campbell Construction compares favorably with our
engineering estimate of $375,015. Campbell bas completed marry similar project for the City of
Bangor with excellent results. A copy of the bid tabulation is attached.
An
D-
Managels comments: I a
d u� p4.ove9, ae ��ne..,cc
Associated lnformationn
t
Budget Approval:
F4meeDWuw
Legal Approval:
caysdmnm.
Introduced For: 6mm
Passage
First Reading
Referral Page of
98-383
Mupadlo Counellor Farnham September 28, 1998
CITY OF BANGOR
AWARD OF BW POR DAVIS BROOK SEWER SYSTEM UPGRADE
(TITLE) UUM
By the City Cou"a Of the 0BYWBo*oa*:
ORDERED.
TBIS
award of bid is hereby made to Campbell Construction of Brewer, Maine for the
Davis Brook Sewer System upgrade project on patten Sued in the amowt of
$355,546.53.
IN CITY COUNCIL
September 28, 1998
Passed
= LEM
98- 383
0 R D I R
T18e, Award of Bid fox Davis Brad
Brook Sewer System Upgrade Pro3est on
Patten Street
......................................
............ Iq ..................
�GA/A)�ALC U.fICM^�
Avip�ed b
Cmuntl3man
98-383
CITY OF BANGOR
AWARD RECQAfUZ DAT7ON
BID ITEM{S): Davis Brook Sewer System Upgrade - Patten Street
DEPARTMENT: Brunneering
BUDGET REFERENCE:
Requisition No.: None Account Number: 806841008900
Budgeted Amount $ 360,000.00 Available Balance: $ PY99 CSO Borrowing
Total Amount of Award Recommended: S 355546.53
Vendor Recommended: Campbell Communtion Company
Number of Bids Sent 7 Number of Bids Received: 2
Date Advertised: September 1, 1998 Bid Opening Date: September 16,1996
Past Experience with Vendor: X Excellent_ Good_ Fair_ Poor_ No prior experience
If no experience, references checked or other method of vendor reliability established _
OTHER COMMENTS:
Award the contract for the Davis Brook Sewer System Upgrade on Patten Street to Campbell
Construction Company oflirewer, the low bidder at $355,546.53. This p jest is pan ofthe City's
ongoing Combined Sewer Curfews (CSO) program.
This award is contingent upon City Council Approval as nine 100,000.00.
Vy 0�
Purclrasws Aga
APPROVALS
CITYC0UNC1LF1 C COMI TTEE: C
!�( 1 �a.P� c�
Date: September 21, 1998
CITY OF BANGOR Page 1 of 1
BID TABULATION Bid Opening: September 16, 1998
DAVIS BROOK SEWER SYSTEM UPGRADE - PATTEN STREET
ITEM DESCRIPTION QTY UNIT
Campbell Construction
Brewer, Maine
Unit Total
Price Price
Lau Silver, Inc.
Orono, Maine
Unit Total
Price Pow
1a. 36" Class 51 Cement Unetl Ductile Iron Pi
714
H
231.00
1.64,934.00
295.00
210,630.00
1b. 42" Class 51 Cement Unetl Ductile Iran Pie
_ _
246
If
243.00
_ _
59,778.00
308.00
15,788.00
2a. PVC Pipe 6" Senile Sewer Service Connections
470
It
52.00
_
24,440.00
_
60.00
28,200.00
2b. PVC Pipe 12" Catch Basin Connections
65
If
82.0
5,330.00
70.00
_
_ 4,550.00
3a. 6' Precast Concrete Manholes
56
vF
348.00
19,488.00
500.00
28,000.00
3b. Precast Concrete Catch Basins
12
of
286.00
_
3,432.00
275.00
_
-_
3o. Sanity Sewer Manhole Frames B Covers
7
ea
414.00
2,898.00
_ _
500.00
_ _ _ _3,300.00
3,500.00
4. Cast in Piece Reinforced Concrete
Structures
40
2
cy
as
300.00
484.00
12 000.00
928.00
-.
800.00
1,000.00
32,000.00
2,000.00
5. Reconstruct Folding Catch Basins
Be. I Bituminous Concrete Pavement, Trench, Temporary
1,750
sy
7.00
12,250.00
18.00
6b. Bituminous Concrete Pavement, Trench,
1,550
9.50
_
13.00
_23.250.00
_ 28,250.00
6c. Bituminous Concrete Pavement, Read Widening
650
s
18.00
10,725.00
10,400.00
28.00
18,200.00
Bituminous Concrete Pavement, Surface Course
a Coon
3625
1,350
160
65
sy_
If
sy
sy
sy
4.00
2.25
1600
14.00
9.00
0.01
14,100.00
3,037.50
2560.00
910.00
10.00
3.00
15.00
15.00
35,250.00
4,050.00
2,400.00
7.
7. Bituminous Concrete Curbing
e. Bituminous Concrete Sidewalk
9a. Bituminous Concrete Driveway Repair
9b. Repair, Gravel
65
585.00
0.25
8.00
200.00
_ _ _975.00
520.00
5,000.00
10. Rods Excavation
B e& E
25
11. Sury
75
as
_
0.01
0]5
50.00
3,750.00
TrenchE &Backfill Belay Normal Grade
12. Trench
25
30.06
750.00
20.00
500.00
13a. Dust Control, Weler
Coned, at
50,000
,�_
al
0.06
_
3000.00
0.10
_
5,000.00
13b Dust Control, Calcium Chloride
3
ton
0.01
0.03
500.00
1,500.00
TOTAL AMOUNT BID
5546.53
__
_ $519843..