Loading...
HomeMy WebLinkAbout2004-10-13 04-316 ORDERCOUNCIL ACTION Item No. 04-316 Date: October 13, 2004 Item/Subject: ORDER -Contract award for construction of a Bus storage Addition to the Recycling Facility Responsible Department: BAT, Engineering R Purchasing Commentary: The attached Council Order authorizes contract award to 1. M. Brown of Hampden for the construction of a bus storage addition to the City's Recycling Facility. The original bid of $656,126 was well over the City's available funds of $407,687. By reducing the size of the building by two bays (56 feet or enough room for four buses) and by re-deagning or substituting many of the original features of the building, the contractor was able to propose a building that is acceptable to staff and within budget. On October 4, 2004 the Finance Committee reviewed and approved the above recommendation to award the contract to J. M. Brown in the amount of $407,000. Department Head r Associated Information: (3d %N(� i3rw/ �tuxci Rsco+.rirtnq�.%., Budget Approval: LCF-inance Director City Solicitor Introduced for _ Passage _ First Reading Page _ of Referral 06-316 .. Assigned to Cowci or Farrington October 13. 2006 CITY OF BANGOR (TM -E.) Order, Authorizing Contract Award for the Construction of a Bus Storage Addition to the City's Recycling Center By Bre Qty Cbmx r/ ofthe City ofBangor. ORDEREd,.. THAT, David N. Pellegrino, Purchasing Agent is hereby authorized to execute a contract with J. M. Brown General Contractor, Inc. in the amount of $407,000 for the construction of a bus storage addition to the City's Rec/ding Center. IN CITZ COUNCIL October 13. 2004 Nation Made and secovded for Hasaage x 04-316 O HDNN (TITLE.) Contract award for construction of a Hunt rage Addition o c cyc n Mg Facility Assigned to CouncilorFll A)14A CITY OF BANGOR BIO TABULATION BH Opening: 09115/04 BUS STORAGE ADDITION Pape 1 of 1 J.M. Brown Hamlbm, ME The Shandan GhT. FaiRieln, ME Ganneslon quOvsU, M DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE UNIT TOTAL PRICE PRICE UNITREM PRICE1Bus Sio2eA ltpon 1 LS 655,126.00 656126.00 fi99 W000 699000.So 920,W10.00 21,00 TOTAL AMOJM BIP. S 656128M 5 699,00O.W Pape 1 of 1 r. CITYOFEANGOR G4 -s16 \Y AWARD RECOMMENDATION BID ITEM(Sl: Bus Stemge Faulty DEPARTMENT: Engineering BUDGETREFERENCE: Requisition No.: N/ALAccount Number: 7509-91000.700 Budgeted Amount: $ 457 000 Available Balance: $ 407,687 Total Amount of Award Recommended: $407.000 Vendors Recommended; I.M. Brown G.C. Number of Bids Sent: 5 Number of Bids Received: ] Date Advertised: Auoust 25, 2009 Bid Opening Data: 5eotember 15 2004 Past Experience with Vendor: % Excellent_ Good Fair Poor No Prior Experience If no experience, references chocked W other method of vendor reliability established OTHER COMMENT& Award the contract to I. M. Brown of Hampden, the low bidder with a negotiated price of $40],000. The original bid of $656,126 was well over the City's available funds of $407,687. By reducing the size of the building by two bays (56 feet or enough mom for four buses) and by redesigning or substituting many of the original features of the building, the contractor was able to propose a building that is acceptable to staff and wM1hin budget. This contract al recommendation must be reviewed and approved by the City Council as It is over $100,000. P aMn t *«***«««*«««************** APPROVALB*********** *z**xw«««w« CITY COUNCIL FINANCE CO E: Date: /G�/•-