Loading...
HomeMy WebLinkAbout2008-08-11 08-268 ORDERItem No, 08 268 Date: August 11, 2808 Item/Subject Order, Granting Utility Location Permit to Bangor Gas, LLC for Installation of Gas Main lines on Union Street and Hudson Street Responsible Department: Engineering Commentary: The attached Order will grant a Utility Location Permit to Bangor Gas for installation of V PE main lines and 1"service lines along Union and Hudson Streets for a distance of 685 linear feet to provide service to Bangor City buildings. All wortcis to be done in aamdarcn with applicable City title, Ordinances, and anyadditional requirements of the City Engineer. NOTE: No separate public notice of this application R to be made. V Department Head Manager's Comments: Recommend approval Aim fl City Manager Associated Information: Order and Location Penult Application Budget Approval: Finance Director Legal Approval: Ci olicitor Introduced for X Passage _ First Reading Page _ of _ Referral nrsi August 11. 30M geed to Cowcitur 4Yatvick CITY OF BANGOR i8 268 fTITLE.) Order, Granting Utility Location Permit to Bangor Gas, LLC for Installation of Gas Main Lines on Union Street and Hudson Street By the dty cwwl9fthe Gty, ofseryor.- THAT, a Ublky Location Permit is hereby granted to Bargor Gas for the installation of 4" main lines and 1" service lines along Union Street and Hudson Street for a distance of 685 linear feet as described in the attached permit application; and BE IT FURTHER ORDERED THAT all Work be done in accordance with the Citys Street Opening Regulations and other requirements of the City Engineer. NOTE: No separate public notice of this application to be made. I cin cooecn AuB st 11, 2008 Pae �d Ciel 0®6H I ITCl'i&) Sue ill 1 r Pernik Co 8auzoi Cae.LLC £oi IveGILClw o£ G'ne M iu 11nea on uul:.... Street a Aww,aI ip CmOulo� lSJ /C Bangor; Gas 08 268 The Natural Choice LOCATION PERMIT APPLICATION FOR BURIED NATURAL GAS PIPELINE To the Bangor City Council Bangor Gas Company, LLC respectively requests permission to place and maintain buried pipes, valves, caps, valve boxes, manholes, tracer wires, warning tapes other fixtures in, along, under and across famous of the surface of the public streets and highways as figther described in the attached table titled `Location Pemrit Request'. The above referenced pipes and other fixtures will be placed in accordance with the enclosed phm sheets. The plans are prepared on Base Maps generated from aerial photography. The aerial photogmphywas taken on November 18,1998. In conjunction with this location application, Bangor Gas Company, LLC also request permission to place and maintain the previously described pipes and other fixtures in, along under and across the above intersecting public ways for the purpose of making connections with such other portions of the natural gas disaibution system and buildings as may be desired for the purpose of distributing natural SAS. Respectively submitted by: 1,t Patrick Tubbs Bangor Gas Company, LLC August 1, 2008 City of Bangor Location Permit Approval Date: ro an eao.myy hb�re- 0440209¢). mo,,, pea 94w595. fm:. hon 9420101 Few ghr 34My21 aow Musa 04401 Bangor, Gas U8 268 The Natural Choice LOCATION PERMIT REQUEST FOR THE INSTALLATION OF NATURAL GAS DISTRUBUTION MAINS WITHIN THE ROAD AND STREET RIGHT-OF-WAYS OF THE CITY OF BANGOR M an integral part of the development of the annual We; distribution system for the City of Bangor, Bangor Gas proposes to install polyethylene natural gas system piping within the mad and street right -o& -ways. The pipe material will be PE 2406, medium densily polyethylene gas pipe. The pipe color will be yellow, in compliance wild the national color code standards for utilities. The pipe will be installed by Wenchless and/or conventional open cutditch methods. All gas mains will be installed al a minimum depth of flares ress bellow finished surface grade. Refer to the Winched plans and table below for details of the proposed construction. Proposed Location Summary Table Location From - TO Lineae' Fact Urtionso-et The West side ofUviov Smin 299 Union Strett 525 from the Union Street A ui=Huducn Stmet The inwxcdon arHudwu 16 Burson 160 9lreu and Uviw Shett 9deet oo fhe Sombeide 40 Wt990-� ,w 0440cwW ilwve n0o 44)9595 Re, 20]1942o'01 h m,,.qh adl`nY. 1t AMm slw e,.9w, oo r, o4lOr Bangy, OGas 08 268 The Natural Choice 21 Main Street, Bangaq ME 04401 Phone: (207) 941-9595 Fax: (20'n 942-0101 City of Bangor, Maine Application for Street Opening Permit Location of Work: 263 Union Street Description of Work: Installing 4" Natural Gas Main Line from 251 Union Street to Hudson Street and 1" Natural Gas Service Line to 263 Union Street Proposed Start Date: 8/1/08 Anticipated Completion Date: 9/1/08 Customer Name: Ken Kimball Contact Person: Alex Tetreault Fee: Annual Location Excavation Size Length Pipe Size Trench (FT) (IN) Shoulder, Working on Attempt HAD 200 D 4" PE pipe Sidewalk and West side of Bore or 12" Private Union Street Trench Property and continuing Width up the sidewalkto Hudson Sheet. Sidewalk and Worklog from Attempt HDD 36 it I" PE pipe Private West side of Bore or 12" Property Union Street Trench to the right Width side of the house BangorGas u8 268 The Natural Choke 21 Main Street, Hangor, ME 04401 Phone: (207) 941-9595 Fax: (207) 942-0101 City of Bangor. Maine Application for Street Opening Permit Location of Work: 5, 7, and 17 Hudson Street Description of Work: Installing 4" PE Natural Gas Main Line and (2) I" PE Natural Gas Service Lines Proposed Start Date: 8/1/08 Anticipated Completion Date: 9/1/08 Customer Name: Ronald Harriman Contact Person: Alex Tetreault Fee: Annual Location Excavation Size Leng Pipe Size Trench th (IN) .Shoulder, Working on South side of Attempt 160 n 1 4" PE pipe Sidewalk Hudson Street and HDD Bore or and moaning up the 12"Tress ch Private sidewalk to 16 Hodson Width Property Street. Shoulder, Working from South side Attempt 115ft 1"PE pipe Sidewalk. of Hudson Street and HDD Bore or Street, and rontinuing North across 12" Trench Private Hudson Street to Me Width Property right side of the house to the right side of the house Shoulder, Working from North side Attempt Inft l"PEpipe Sidewalk, of Hudson Street and HDD Bore or and continuing east down the. 12"Trench Private sidewalk up to Me right WOM Property side of the house. BangorOGas 08 268 The Natural Choice 21 Main Street Bangor, ME 04401 Phone: (207) 941-9595. Fm: (207) 942-0101 City of Bangor, Maine Application for Street Opening Permit Location of Work: 299 Union Street Description of Work: Installing 4" Natural Gas Main Line from North side of Hudson Street to 299 Union Street V Natural Gas Service Line to 299 Union Street Proposed Start Date: 8/l/08 Anticipated Completion Date: 9/1/08 Customer Name: FCiley and Foley Funeral Home Contact Person: Alex Tetreault Fee: Annual Location Excavation Size Length Pipe Size Trench (FT) (IN) Shoulder, Working on West Attempt 325 it 4" PE pipe Sidewalk and side of Union Street HDD Bom Private from Hudson Street or 12" Property and continuing up the Treach sidewalk to 299 Union Width Street. Sidewalk and Working from West Attempt 32ft I" PE pipe Private side of Union Street HDD Bore Property to the right side of the or 12" house Treach Width AREA IS PREMRKED.. YES 08 2 68 (DIG SAFE SYSTEM, INC. - MA) 07/09/2008 05:12:12 TITLE........... -AB -BB 2 -BN ENGRGS -D1O1 -L1 -LA -M101 -M102 FAX 1) ........... MA -NX -ON -RJ -TS -U2 PTUBBS®BANGORGAB. CUM CONTRACTOR...... -------------------------------------------------------------------------- * INTERNET TICKET +*+ ADDRESS......... 21 MAIN STREET **+*+ REDDLAR ***** BANGOR STATE........... TIME..18:59 DATE..07/08/2008 ZIP ............. 04401 REQUEST NO... 20082805405 WORK.. BANGOR GAS CO. STATE......... MAINE MUNICIPALITY..EANGOR ADDRESS..263 STREET... ONION STREET NEAREST CROSS STREET 1.. HUDSON STREET NEAREST MOSS STREET 2..HAKNOND STREET WORKING IN THE SHOULDER AND SIDEWALK AREA FROM THE INTERSECTION OF UNION AND HANMND STREET TO THE INTERSECTION OF UNION AND HUDSON STREET. -------------------------------------------------------------------------- NATURE OF WORK.. INSTALLING NATURAL GAS MAIN AND SERVICE LINE EXTENT OF WORK SHOULDER, SIDEWALK AND PRIVATE PROPERTY AREA IS PREMRKED.. YES - - - - - - - - - - - - - - - START DATE...... - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 07/14/2008 START TIME..07:00 CALLER.......... PATRICK TUHHS TITLE........... ENGINEER RETURN CALL.... PHONE #......... 207-941-9595 FAX 1) ........... 207-942-0101 ALT. PHONE #....207-852-2322 SNAIL ADDRESS... PTUBBS®BANGORGAB. CUM CONTRACTOR...... BANGOR GAS CO, ADDRESS......... 21 MAIN STREET CITY............ BANGOR STATE........... ME ZIP ............. 04401 EXCAVATOR DOING WORK.. BANGOR GAS CO. A 268 (DIG SAFE SYSTEM, INC. - MA) 07/09/2008 05:12:20 -BH 3 -BN ENGRGS -D101 -L1 MA -ON -RG -------------------------------------------------------- + INTERNET TICKET +++ +++.+ REGDLAR +++++ TINE..19:10 DATE..07/08/2008 REQUEST NO... 20082805416 STATE......... MAINE NNNICIPALITY.. RANDLE ADDRESS. .17 STREET... HUDSON STREET NEAREST CROSS STREET 1. .UNION STREET NEAREST CROSS STREET 2..OHIO STREET WORKING IN THE SHOULDER AND SIDEWALK AREA FROM THE INTERSECTION OF UNION AND HUDSON ST. AND CONT. NORTH ON HUDSON ST. AND THEN CROSSING HUDSON ST ------------------------------- ___-- NATURE OF WORK.. INSTALLING NATURAL GAS MAIN AND SERVICE LINE EXTENT OF WORK STREET, SHOULDER, SIDEWALK AND PRIVATE PROPERTY AREA IS PREMARX6D.. YES' ---------------------------------------------- START DATE...... 07/14/2008 'START TIME:.07:00 CALLER.......... PATRICK TUBES TITLE........... ENGINEER ASTERN CALL..... PHONE #......... 207-941-9595 FAX #........ ...207-942-0101 ALT. PHONE #....207-852-2322 EMAIL ADDRESS...PTOBB30BANGOROAS. C0N CONTRACTOR....:: BANGOR GAS CO. ADDRESS......... 21 MAIN STREET CITY............ BANGOR STATE........... NE ZIP .............. 04401 EXCAVATOR DOING WORK.. BANGOR GAS CO. 6y`r 08 268 (DIG SAFE SYSTEN, INC. - MA) 08/01/2008 15:04:45 -AB -EH 11 -NN EGGING -D101 -L1 -LA -M101 -M102 -MA _NX -ON -RU.` -TS -U2 ------------------------------------------------------------------------ * INTERNET TICKET *+* + + REGULAR +++*: TIME..15:05 DATE,.08/01/2008 REQUEST NO... 20083110921 STATE......... MAINE MUNICIPALITY.. BANGOR ADDRESS..299 STREET... UNION STREET NEAREST CROSS STREET 1..HUDSON STREET NEAREST CROSS STREET 2..POND STREET WORKING FROM NORTH SIDE OF HUDSON STREET AND CONTINUING NORTH UP THE WEST SIDE OF ONION STREET TO THE RIGHT SIDE OF 299 ONION STREET. -------------------------------------------------------------------------- NATURE OF WORK.. INSTALLING NATURAL GAS MAIN AND SERVICE LINE INTENT OF WORK SHOULDER, SIDEWALK, STREET, AND PRIVATE PROPERTY �! START DATE...... 08/06/2008 START TIME..16:00 CALLER.......... ALEX TETREAULT TITLE........... ENGINEER RETURN CALL..... PHONE #......... 209-941-9595 FAX #........... 209-942-0101 ALT. PRONE #.... SNAIL ADDRESS... ATETRMILTOBANGORGAS. COM CONTRACTOR...... BANGOR GAS COMPANY ADDRESS ....... ..21 MAIN STREET CITY............ BANGOR STATE........... ME SIP .............. 04401 EXCAVATOR DOING WORK.. BANGOR GAS COMPANy FLI Ma AND HUMD IF PMMENT o,aU�W „ 2 UNION WOOD OF 01 Or T.. e SIM NO S 0 �o as o 073EI 'y t, Sq. B �� w2 3 w Pf �/ 2 R DUCER25gtl a OS _— p e d �rerx�202F� / PONT Bw OGas 01 MR 124 SEE a E i o zssV AS WHO V/O � M" 9 e a E TseREM zs c ,K _ DIVREMON Brv�nr(}G8S EE STREFT WN En f2