HomeMy WebLinkAbout2008-08-11 08-264 ORDERGate: August 11, 2008
"'m ""A 08 264
Item/Subject: Order, Granting Utility L.oration Permit to Bangor Gas, LLC for Installation of Gas Main
Lines on State Sneet from York SlR2t to Adams.
ResponsibleDepart nCBngineedng
Theattached OrderwlllgranatttilityL mPermitw Bangor Gasforlro llationof PE2906,2'mWmlgm
line and 1" sery line an State Street, from York Street to Adams for a distance of 425 f
All work is to be done in amordance calf applicable Ory Code, Ordinances, and airy additional requirements
of the City Engineer.
MOTE: Ro separate public mass of M5 application is to be made.
Departinen Head
Manager's Comments:
Recommend approval. /
AR (.tty Manager
Assocle0ed Information: Order and on permit Application
m ,m
passage
First Reading page—of—
Referral
age_o!_Referral
August 11, 20M
Assigned to Councilor Farrington
CITY OF BANGOR U8 264
Ift
(TITLE.) Order, Granting Utility Lor mon Permit to Bangor Gas, LLC far Installation of Gas Main
Lines on State Street from York Street to Adams.
By the City Counal of the aty of Bangor
ORDERED,
THAT, a Utility Location Permit is hereby granted to Bangor Gas for the installation
of 2" main line and 1" service line on State Street from York Street to Adams for a
distance of 425 feet as described in the attached permit application; and
BE IT FURTHER ORDERED THAT all work be done in accordance with the City's
Street Opening Regulations and other requirements of the City Engineer.
NOTE: No separate public notice of this application to be made.
IN CIlY 11. 200 1, 2WL
(wgust 8
sxese y OB -266
-�� aim I.
un ML
mII o ( matin¢ ptl N[a lnwtlm Phe t
to or ra, lac vm Tp,t IUti!
6.m
mw '.
� .nw�p�N�a Coaneibr
I
I i �
I I
�a
Bangor 'Gas G8 264
The Natural Choice
LOCATION PERMIT APPLICATION
FOR
BURIED NATURAL GAS PIPELINE
To the Bangor City Council
Bangor Gas Company, LLC respectively requests permission to place and maintain buried pipes, valves,
caps, valve boxes, manholes, tracer Wires, warning tapes other fixtures in, aloh& "der and across
portions of the statute of the public streets and bighways as farther described in the attached table tided
"Location Permit Request"
The above referenced pipes and other fixtures will be placed in accordance with the enclosed plan
sheets. The. plans are prepared on Base Maps generated from aerial phonography, The aerial
photo® phywas takm on November.18,1998.
to conjunction with this location application, Bangor Gas Company, LLC also request permission to
place and maintain the previously described pipes and other fixtures in, along under and across the
above intersecting public ways for the purpose of making connections with such other portions of the
natural gas distribution system and buildings as may be desired for the purpose of distributing natural
gas.
Respectively submitted by:
Patrick Tubbs
Bangor Gas Company, LLC
July 3, 2008
City of B angor Location Permit Approval
Date:
k eaom.g,,, rso,M oaacxooeo.. av,e: lean W ws95. rw: con 9420101
'fpp ighl&1" 2l Nam nrvv besecb o, eJQll
Bangor = Gas A 264
The Natural Choice
LOCATION PERMIT REQUEST
FOR THE
INSTALLATION OF NATURAL GAS DISTRUBUTION MAINS
WITHIN THE ROAD AND STREET RIGHT-OF-WAYS
OF THE
CITY OF BANGOR
As an integral part of the development of the natural gas distribution system for the
City of Bangor, Bangor Cas proposes to install polyethylene natural gas system
piping within the rued and street right-opwayu. The pipe material will be P132906,
medium density polyethylene gas pipe. The pipe color will be yellow, in
compliance with the national color code standards for utilities. The pipe will be
installed by benchless ami comentional open cut -ditch methods. All gas mains
will be installed at a minimum depth of three feet bellow finished surface gads.
Ref to the attached plans and table below for details of the proposed construction.
Proposed Location Summary Table
Location
From
To
Linear
Feet
Adams Inmet
TheTmrt osennaawon Yuh
Sheet up the lett side ofAdms
StrM
163 Shin Street
380
40 am 990. 6W, Nora,, 04,02098n Prue'. 120)19419595. fax Red 9420101
ro ore�m9sl dd�::zl nbmsl�.e�.eor rxw a6ol
&nggr Gas 08 265
.The Natural Choice
21 Main Street, Bangor, ME 04401
Phone: (207) 941-9,595 Fax: (207) 942 0101
City of Bangor, Maine
Application for Street Opening Permit
Location of Work: 143 State Street
Description of Work: Install 2" Main Line and 1" Service Line
Proposed Start Date: 7/30/08
Anticipated Completion Date: 8/30/08
Customer Name: B. Calvin Bubar III
Contact Person: Alex Tetreault
Fee: Annual
Location
Excavation
Size
Length
Pipe Size
Trench
(FT)
(IN)
Sidewalk, Street,
Working
Attempt HDD
380
2
Shoulder, Private
from York
Bore or 12"
Property
Street up
Trench Width
West side of
Adams to 143
State Street
Shoulder,
Working
Attempt HDD
45
1
Sidewalk Private
from West
Bore or 12'
Property
side of
Trench Width
Adams Street
to left side of
building.
08 264
(DIG SAFE SYSTEM, INC. MA) 07/14/2008 08:43:19
-AE .BH 10 -BN BNGRGS -L1
-NA -MX _ON -OT
-RT -D2.
-------------------------------------------------------------------------
* INTERNET TICKET *.
+++++ REGULAR *
TIM9..08:43 DATE..07/14/3008
REQUEST NO... 20082900792 -
STATE ......... MINE
MUNICIPALITY.. BANGOR
ADDRESS..143
STREET... STATE STREET
NEAREST CROSS STREET 1..ADAMS STREET
.. NEAREST CROSS STREET 2. GROVE STREET
WORKING FROM SOUTH END OF ADAMS STREET AND CONTINUING NORTH
ACROSS YORK STREET OP ADAMS STREET AND ACROSS ADAMS STREET-------------------------------------------------------------------------.
NATURE OF WORK.. INSTALLING NATURAL GAS MAIN AND SERVICE LING
EXTENT OF WORK
SHOULDER, SIDEWALK, STREET, PRIVATE PROPERTY
AREA IS PREMARKRD.. YES
_._.________________________________________________________________________
START DATE...... 09/19/2008 START TIME..09:00
CALLER.......... ALEX TETREAULT
TITLE........... ENGINEER
RETURN CALL.....
PHONE W .... ..... 207-941-9595
FAX #........... 209-942-0101
ALT. PHONE #....207-478-2130
EMAIL ADDRESS... ATETREAULTWBANGURGAS.COM
CONTRACTOR...... BANGOR GAS COHPANY
ADDRESS ......... 21 MAIN STREET
CITY............ BANGOR
STATE........... ME
ZIP ............. 04401
EXCAVATOR GOING WORK.. BANGOR GAS COMPANY
4
Bangor Gm 08 264
The Nataml Choice
21 Main Street, Bangor, ME 04401
Phone: (207) 941-9595 Fax: (207)942-0101
City of Bangor, Maine
Application for Street Opening Peewit
Location of Work: 17 Adams Street
Description of Work: Install l" Service Line
Proposed Start Date: 7/30/08
Anticipated Completion Date: 8/30/08
Customer Name: Nancy Whitney
Contact Person: Alex Tetreault
Fee: Annual
Location
Excavation
Size
Trench
Length
Pipe Size
(IN)
shoulder,
street,
Sidewalk, and
Private
Property
Working from
West side of
Adams &rat
and continuing
to left side of
building
Attempt Ban
Bore or 12^
Trench Width
30
1
(DIG SAFE SYSTEM,
INC. - MA)
09/14/2008 08:46:51
08
264
-EH
12 -DN
BNGRGS -L1
-MA
-EX
--------------------------------------------------------------------------
-ON
-RJ
-U2
+ INTERNET TICKET +*+
+++++ REGUTAE +:+++
TIME..08:47 DATE..09/14/2008
REQUEST NO... 20082900783
STATE......... MAINE
MUNICIPALITY.. BANGOR
ADDRESS..17
STREET... ADANS STREET
NEAREST CROSS STREET 1..STATE STREET
NEAREST CROSS STREET 2..YORK STREET
WORKING ON NEAR SIDE OF ADAMS STREET AND CONTINUING TO
THE LEFT SIDE OF THE HOUSE.
----------------------------------------------------------------
NATURE OF WORK.. INSTALLING NATURAL GAS MAIN AND SERVICE LINE
EXTENT OF WORK
SHOULDER, SIDEWALK, STREET, PRIVATE PROPERTY
AREA IS PREMARKED..YEB.
--------------------------------------
START DATE ...... 07/19/2008 START TIME..09:00
CALLER.......... ALEX TETREAULT
TITLE........... ENGINEER
RETURN CALL.....
PHONE q......... 207-941-9595
FAX k........... 207-942-0101
ALT. PHONE #....207-478-2130
EMAIL ADDRESS... ATETREAULTOBANGORGAS.COM
CONTRACTOR...... BANGOR GAS COMPANY
ADDRESS......... 21 MAIN STREET
CITY............ BANGOR
STATE........... WE
ZIP ............. 04401
EXCAVATOR MING WORK.. BANGOR GAS COMPANY
` D
ef�y7
Bangortj Go
The Naturai Choice
21 Main Street, Bangor, M 04401
Phone: (207) 941-9595 Fax: (207) 942-0101
City of Bangor, Maine
Application for Street Opening Perrin[
Location of Work: 20 Adams Street
Description of Work: Install P' Service Line
Proposed Start Date: 7/30/08
Anticipated Completion Date: 8/30/08
Customer Name: B. Calvin Dollar III
Contact Person: Alex Tetreault
Fee: Annual
08 264
Location
Excavation
Size
Trench
Length
(FT)
Pipe Size
(IN)
Shoulder,
sidewalk,
Private
Property
Working from
West side of
Adams Street
and continuing
across Bre street
to left side of
building
Attempt HDD
Bore or 12"
Trench Width
70
1
(DIG SAFE SYSTEM, INC. - NA) 07/14/200
-EH 11 -EN BNGRGS
-NIX -ON.
+ INTERNET TICKET +
***** REGULAR ***
TIME..08:45 DATE..09/14/2008
REQUEST N0...20082900776
STATE......... MAINE
MUNICIPALITY.. BANGOR
8 08:44:58
08 264
MA
U2
---------------
ADDRESS..20
STREET... ADAMS STREET
NEAREST CROSS STREET 1..STATE STREET
NEAREST CROSS STREET 2..YORK STREET
WORKING FROM FAR SIDE OF ADAMS STREET AND CONTINUING
ACROSS THE STREET TO THE LEFT SIDE OF THE HOUSE
------------------------------------------------------------
NATURE OF WORK.. INSTALLING NATURAL GAS MAIN. AND SERVICE LINE
EXTENT OF WORK
SHOULDER, SIDEWALK, STREET, PRIVATE PROPERTY
AREA IS PREMARKED.. YES
START DATE...... 09/17/2008 START TIME..09:00
CALLER..........
ALEX TETREADLT
TITLE...........
ENGINEER
RETURN CALL.....
PHONE #.........
207-941-9595
FAX 0 ...... .....
207-942-0101
ALT. PHONE 0....207-478-2130
EMAIL ADDRESS...
ATETREAULTOBANG0RGAE.COM
CONTRACTOR......
BANGOR GAS COMPANY
ADDRESS.........
21 MAIN STREET
CITY. ...... .....BANGOR
STATE...........
ME
ZIP .............
04401
EXCAVATOR MIING
WORK. . BANGOR GAS COMPANY
m
Pn MR is
2" PE
xs<msnr.
COMM
0/1 VVV
CNEM
52
\D9
P
\39
\�%
F
PE
um
v
P
w
i
fr
pF�i�s
�
$
e
66
TMm MR
N,
pf
g
64�{Yp,NON10
C
NOpV
�OIL
,
y
_
orO
Ba Gas
e
_
O
�
_
m
7-71
ZZ =�REUW
r