HomeMy WebLinkAbout2010-04-26 10-150 ORDERCOUNCIL ACTION
Item No. i A 1 5 0
Date: April 26, 2010
Item/Subject: ORDER, Authorizing Contract Award for Ohio Street Resurfacing Improvements II
Responsible Department: Engineering
Commentary:
On April 7, 2010 the City received one bid for improvements to Ohio Street. The bid price was
$486,319 - see attached bid tabulation.
The Finance Committee will meet to review staff recommendation to award the contract to Lane
Construction in the amount of $486,319 prior to tonight's Council meeting.
This is an MDOT BACTS project that is locally administered. This project will be funded 90% by
the State and the City will provide the required 10% local match.
The contract award recommendation must be reviewed approved by the City Council as it is over
$50,000.
Department Head
Manager's Comments:
-�,r AnC rm"Aw
�ll�ft''U ✓�Iil� i'���GY Gl 1`� til �Grl/Gr� .
Interim City Manager
Associated Information: Order, Bid Tabulation
Budget Approval:
Legal Approval:
Introduced for
X Passage
First Reading
Referral
nce Director
Page _ of _
1.0 150
Assigned to Councilor - Weston April 26, 2010
CITY OF BANGOR
(TITLE.) Order, Authorizing Contract Award for Ohio Street Resurfacing Improvements II
By the City Council of the City of Bangor:
ORDERED,
THAT, Deborah Cyr, Finance Director is hereby authorized to execute a contract
with Lane Construction, in the amount of $486,319 for improvements to Ohio
Street.
IN CITY COUNCIL
April 26, 2010
(TITLE,)-A„thnrj 7A nZ Contract Award for
Ob4Q etgeet- RPS„rfaring Taprovements II
Assigned to Councilor bl�
City of Bangor
Bid Tabulation - Ohio Street Resurfacing Improvements II
Bid Opening: 04/07/10
Lane Construction
Ban or, Me
Item
Description
Qty.
Unit
Unit
Price
Total
Price
1
202.202 Removing Pavement Surface
23480
SY
2.05
48,134.
2
202.203 Pavement Butt Joints
175
SY
17.00
2,975.00
3
203.20 Common Excavation
300
CY
90.00
27 000.00
4
304.08 Aggregate Base Course - Gravel
200
CY
155.00
31 000.00
5
403.207 3/4" 19mm HMA
50
TON
140.00
7,000.00
6
403.210 3/8" 9.5mm HMA
2180
TON
76.00
165 680.00
7
403.209 3/8" 9.5mm HMA sidewalks
290
TON
150.00
43 500.00
8
403.211 HMA Shim
100
TON
97.00
9,700.00
9
409.15 Bituminous Tack Coat Applied
1150
GAL
6.00
6,900.00
10
604.092 Catch Basin Type B1 -C
1
EA 1
5,100.00
5,100.00
11
604.164 Rebuild Catch Basin
2
EA
4,200.00
-8,40-0.00
12
604.167 Alter Catch Basin
7
EA
840.00
5,880.00
13
604.18 Adjust MH and CD to Grade
2
EA
750.00
1,500.00
14
609.21 Curb Type 2 - Concrete
5800
LF
7.35
42 630.00
15
615.07 Loam
200
CY
83.00
16 600.00
16
618.13 Seeding Method No. 1
30
UNIT
16.50
495.00
17
619.12 Mulch
30
UNIT
16.50
495.00
18
627.7114" White Yellow Pavement Line
16460
LF
0.16
2,633.60
19
627.75 White Yellow Pavement Curb Marking
224
SF
1.10
246.40
20
629.05 Hand Labor
10
MH
42.00
420.00
21
631.12 All Purpose Excavator
10
MH
154.00
1,540.00
22
631.172 Turck - Large
10
MH
89.00
890.00
23
652.36 Maintenance of Traffic
1
LS
21 000.00
21 000.00
24
652.38 Flagger
800
MH
17.00
13 600.00
25
659.10 Mobilization
1
LS
23 000.00
23 000.00
Total Project Bi
1 486 319.00