Introduced by Councilor erountas, Mnmh 26, 1979
CITY OF BANGOR
(TITLE.)Bip...... Accepting. city Fhgineer's_Eeport Final Coat of
-Griffin Road _Kenduskeag Arprogs.SaNe& ....... _...... .......
By the CRY CoawU qft G1ty ofAxagOr. .
ORDERED.
THAT the attached Report of the City Ragineer showing
the final cost of the sanitary sewer installation on Griffin
Road and&enduskeag Avenue to the Eastern Maine Orphans Home
be and hereby is accepted, and be it further
ORDERED, that the assessments be levied or deferredr as
recommended a said Report.
IN CITY COUNCIL MARCH 26,1979
reconsidered vote 9yes voting
yesBrountes�Naldecci�Gasa�
Merceaen:30 v.war�antniwssley.
Wood, zend,ian
Hefeeed to FinenceQnNittee
Consider Net Besting Public
Hearing to Be held at nextmating
198 AG
ORDER
Title,
.. ACCEPTING. CITY. NNGINNER &RNPCRT.. FINAL
COST OF GRIFFIN ROAD EENDUSREAG AVENUE
SEWER
Introduced and filed by
CClerk .. .. .......................
Councilinan
IN CITY COUNCIL APP.IL %19'19 In City Co0ne11 Bqv 14r1979
REPER5D TO FINANCE COMMITTEE Passed -
CONSIDER NEXT MEETING FUMIC -
NEARING
I
d i y Clark
aaC1a(
IN CITY COUNCIL APRIL 23.1999 _
REFIFED TO FINANCE COEHITTEE
CONSII&R NEXT NNETING
CITY CLERIC
CITY OF BANGOR, MAINE
Engineering Department
March 20, 1979
To the Municipal Officers:
Reference is made to City Council Order No. 223 AE passed
May 23, 19779 authorizing the installation of a sanitary sewer
on Griffin Road from the Renduskeag Interceptor to Aenduskeag
Avenue, and to City Council Order No. 361 AE passed August 22,
1977 authorizing the extension of the sanitary sewer on Aendus-
keag Avenue from Griffin Road to the Eastern Maine Orphans Home.
All work has been completed, and the final costa have been dater -
mined, as follows:
The installation consisted of 3,375 feet of 8 inch pipe
and 10 manholes. The total complete project cost, including
engineering, was $93,723.79, which was considerably in excess
of the original estimate of $64,866.00. Most of the overrun
was encountered on the %enduskeag Avenue portion of the project,
being 48.9M higher than the original estimate.
The reasons for the cost overrun were (1) high initial
construction bid received, and (2) an extreme overrun in ledge
excavation. The sewer was originally installed under emergency
conditions to correct a serious septic taxAc problem at 8t.
Michael's Home; it was necessary to advertise the project
for bids late in the fall, and the low bid received was approxi-
mately 60% higher than our usual cost for performing this work
with public Works crews. The lateness of the season and other
commitments prevented us from using Public Works to perform the
work, and necessitated the acceptance of the high bid. The
original estimate of ledge was 100 cubic yards, and the actual
quantity removed was 438 cubic yards, resulting in an overrun
of $135520.00.
Based upon the actual completed cost, which is normally
50Y assessable, the front foot assessment would be $8.47 per
foot as opposed to assessments of between $3.75 and $4.00 per
foot for similar projects performed by Public Works. For this
reason, it is recommended that the assessable amount be limited
to $75,000.00,with the overrun to be charged to the Sewer Fund.
This Will still result in assessment overcome of approximately
1996 to the people on Renduakeag Avenue.
The following list indicates the assessments based upon
(1) the original estimate given to the property owners, (2)
assessments basad on the actual total coat, and (3) assessments
based upon a project cost of $759000-00-
-I-
-2-
Original
Actual
Recommended
Property Owner
Frontage
Estimate
Cost
Assessment
Demmonq, Walter E.
& Doris C.,
_
49 Griffin, Road
135'
$ 922.05
$19143.80
$ 915.30
Hutchinson, Albert
J. & Miriam P.
43 Griffin Road
230'
19570.90
19948.70
1,559.39
Closson, Nellie M.
25 Griffin Road
101`
689.83
855.73
684.78
Legassie, Leon &
Avis A.
15 Griffin Road
88`
601.04
745.59
596.64
Wentworth, Leslie
W. & Rachael A.
891 Kenduskeag Ave.
150'
1,024.50
11270.89
ltO17.00
Morton, Diana J.
30 Griffin Road
192.5'
19314.78
11630.97
1305.14
Whitney, Everett
_
R. & Mildred I.
16 Griffin Road
150'
19024.50
19270.89
19017.00
City of Bangor
(Non -assessable)
82'
560.06
694.75
555.96
Wentworth, Leslie
W. & Rachael A.
891 Kenduskeag Ave.
160
19092.80
1355.61
1084.79
Stafford, Gail R.
& Colleen S.
938 Kenduskeag Ave.
647'
39691.06
5,481.77
4t386.64
Grant, Florence H.
58 East Longrale Park
650'
3,708.18
51507.18
41406.98
Noddin, Cornelius A.
& Edna M.
952 Kenduskeag Ave.
138'
787.27
1169.22
935.64
Green, Charles R.
& Florence E.
960 Kenduskeag Ave.
138'
787.27
1169.22
935.64
Purge, Galen G. &
Barbara J.
970 Kenduskeag Ave.
82'
467.80
694.75
555.96
-2-
(Continued)
Original
Actual
Recommended
Property Owner
Frontage
Estimate
Cost
Assessment
Nutter, Lewis J.
& Grace T.
986 Kenduskeag Ave.
209'
$1,192.32
$1,770.77
$1,417.01
Campbell, Elsie
1000 Kenduskeag Ave.
199'
19135.27
19686.05
19349.21
Grants Associates
& Kern Feeney
562 Union street
1,020'
5,618.99
89642.04
6,915.57
Harmon, Vivian G.
1026 Kenduskeag, Ave.
340'
1,939.66
2$880.68
21305.19
Hunter, Dana J., Jr.
& Linda J.
1025 Kenduskeag Ave.
289.5'
19651.57
2,452.81
19962.80
Small Anna D.
1040 Kenduskeag Ave.
230'
19312.12
19948.70
19559.39
Eastern Maine Orphans
Home
1066 Kenduskeag Ave.
300'
19140.98
2,541.78
2,033.97
Totals: $32,432.95 469861.90 37,500.00
It should be noted that the assessment as recommended is
approximately $6.78 per foot, which is still substantially
higher than all other recently campleted sewer projects. It
should also be noted that only 61% o£ the property owners were
originally in favor of the sewer installation, including the
Orphanage, and it is doubtful that even a majority would have
been in favor if the higher cost had been known.
It is recommended that theassessmentsbe levied as noted
above for a project cost of $75,000.00.
Plans showing the actual sewer installation are on file
is the office of the City Engineer.
Respectffuuvlly submitted,
D 1
Sohn T. Frawley,
City Engineer
-3-
rvxq
all cak
NOTICE OF PWLIC HLARINn
April 11, 1979
Notice is hereby given that there will be a public hearing
on Council Order 198 AG - Accepting City :siainc_e s [cport -
Final Cost of Griffin Reed - Renduskeli Avenue lower.
Pudic Hearing will be held in Council C1lar",11 at Luregular
scheduled meeting of April 23, 1979,
Copy of Order enclosed.
A* i,4„
SITY CIEIv
HSN/db
ST. MICHAEL'S CENTER 10R
James H. Clark. M. S. W. Executive Director
April X, 1979
Mr. Russell McKenna
City Clerk
City Hall
Bangor: Maine 0"I
Dear Mr. McKenna:
� you for your notice dated 4/11/79 of the public Matting to be
hold on 4/23/79 concerned with accepting the City Engineer's Report —
Final Ccst of (Tiffin Road—&mduskeag Avenue sewer.
Your notice and the City Msgineer's Report were brought to the atten-
tion of the �t Michael's Center Ward of Directors at the Ward
meeting held on 4/19/79•
After a review of the sewer project as it related to Saint Michaels
Center, the Ward of Directors agreed that the recommeeded assessment of
$2,033.97 was fair and reasonable.
Accordingly, this is to d OS you that the Board of Directors have no
objection to the assessment amount as recomsehoed in the City Engineer's
Report of 3/20/79•
S]ncerely,
A.
Martyr A. Vickers, M.D.
Chairman, Wand of mrectora
.Jr.r,..,. u Ue t
James H. Clark
Executive Director
JHC/nY