CITY OF BANGOR
(nTLf.) V11X21PT,—Accepting. Ci ty,Engrneer's,,,Repert, Estimated Cost of,
Roadway Construction East of Hogan. Road
Bq W car emoaid of me qty of2a -.
OBDEMMs
THAT the attached report of the City Engineer showing the
estimated coat and possible assessments for the construction of
a commercial roadway extending east from Hogan Road to the land
of John J. Davis, including the installation of sanitary sewer
service, be and hereby is accepted, and be it 'further
ORDERED,
THAT said roadway and sewer be constructed upon receipt of
payment of the. estimated assessments from the property owners to
be benefitted, and be it further
ORDERED,
THAT the sum of Fourteen Thousand Six Hundred Dollars
($14,600.00) be transferred from the Reserve for Future
Construction - Sewer Account to cover the City's share of
the sanitary sewer construction, and that the sum of Twenty-
five Thousand Dollars ($25,000.00) be appropriated from the
proposed 1981 Capital Improvement Account for Subdivision
Construction.
la city COueeil May 11,1981 81-166
ORDER
Referm':to Finaeeo ca.nxt� '81 MAY-7 P3:15
Eoacidor, next Maetiag Titl
..
Accepting City engi eerb lieport. CITY Of LERK
_ ........ c;ir CLERK
aatimatea coat of goadvep cxaetvotwn�
tMe seat oe it$en M.
Cit9 Cimk
Int oduced file
h city Cwnoil May 2791981 :
Pesaed ••C•
I
i
CITY OF BANGOR, MAINE
Engineering Department
May 6, 1981
To the Municipal Officers:
Reference is made to City Council Order No. 156 -AG passed
February 13, 1979, directing the City Engineer to determine the
cost of constructing a new roadway extending east from Hogan'
Road to the property of John J. Davie. Surveys, Plans and Cast
Estimates have been completed, which would provide for the
following:
The roadway would consist of a 24 -foot wide paved travel
waywith8-foot gravel shoulders, extending in an easterly
direction for a distance of approximately 435 feet from Hogan
Road, and thence in a northerly direction for a distance of
approximately 1,110 feet to the Davis property. In addition,
an 8 -inch sanitary sewer would be installed, extending from
the existing sewer on Hogan Road along the new roadway for a
total distance of 1,071 feet, and would include the installation
of 4 man]aoles.
The total estimated cost of the road is $107,800.00. Of
this amount, the City would pay 50%, and the remaining
$53,900.00 would be assessed against the properties benefitted.
The total -estimated cost of the sanitary sewer is
$29,200.00. Of this amount, the City would pay 50% and the
remaining $14,600.00 would also be assessed against the prop-
erties benefitted. A breakdown of the estimated assessments
is as follows:
ROAD SEWER
Area—7stimated - Area—7atimated
Property Owner Benefitted/Assessment Benefitted/Assessment
Sullivan Ford 2.21 Acres $ 4819.00 1.10 Acres S 1,367.00
Ralph Dyer, Inc.
East Side 6.38 Acres 13,911.00 4.92 Acres 6,113.00
Ralph Dyer, Inc.
West Side 2.33 Acres 59080.00 2.33 Acres 29896.00
Robert Races 2.71 Acres 5,909.00 -2.71 Acres 3,367.00
John J. Davis
West Side 0.69 Acres 1,505.00 0.69 Acres 857.00
John J. Davis
North End 10.40 Acres 22.676.00 0 0
Total 24.72 Acres $53,900.00 11.75 Acres $14,600.00
-1-
All of the above property owners have agreed to the estimated
assessments and are in favor of the roadway construction. It has
previously been recommended that the roadway be constructed with
the exception of paving, loaming and seeding, to be completed
next year. It has further been recommended by the Finance
Committee that the property owners be required to pay their
estimated share of both the road and sewer assessments prior
to the award of a construction contract.
It is recommended that the roadway and the sewer be con
structed, subject to the above mentioned conditions.
Plana showing the proposed construction are on file in the
Office of the City Engineer.
Respectfully submitted,
S Frawley,
City Engineer