Loading...
HomeMy WebLinkAbout1982-11-08 83-12 ORDER83-.12 Introduced by Councilor Brawn, November 8, 1982 CITY OF BANGOR (TITLF.) te/rbgrg.... Authorizing the Extension. of the Coffey Street Roadway - Seventy-five Feet Westerly ......._._.. ................. __... _.:_ _. By the City Caonit of City of Bangor: ORDERED, THAT.the attached report of the City Engineer showing the estimated cost and recommended assessment for the extension of the Coffey Street roadway in a westerly direction for a distance of seventy-five (75) feet be and hereby is accepted, and be it further ORDERED, THAT said roadway be constructed upon receipt of the private share of the construction, and be it further ORDERED, TEAT.the sum of One Thousand Two Hundred Fifty Dollars ($1,250.00) be transferred from the Reserve for Future Construction - General Account to cover the City's share of the roadway extension. In city council November 6,1983 Passed councilor Jordan Abstained 83-13 Q RNER Title', ity Ci C C cy Cie AufM1o[ix.n.. ....tens... of cM1. Coffey sebee[ Medway seveNty five feet westerly Introduced and /filed by -' Councilman CITY O BANGOR, MAINE Engineering Department November 1, 1982 To the Municipal Officers: Reference is made to a petition received from Maine Distributors requesting that the existing travel way of Coffey Street be extended for a distance of 75 Seat in a westerly direction, so as to permit the Petitioner to construct a retail addition to the westerly end of their existing building, which requires vehicle access which is separated from their existing commercial entrance. The area has been examined, and an estimate prepared for the roadway extension, as follows: The proposed extension would consist of a 24 foot wide travel way having a 24 inch gravel base and 3 inch bituminous Cost of the extension 18 02,500.00. Of this amount, the City wouid pay fifty percent, and in accordance with Chapter XII, Artcle 12, Section 1.6.2 of the Yaws and Ordinances of the City of Berger, the remaining fifty percent would be assessed against the properties benefitted. Inasmuch as Maine Distributors owns the land on both sides of Coffey Street in that location, their estimated share would be $1,250.00. The Petitioner has been advised of the estimated cost, and made aware that the prepayment of the estimated private share will be required prior to the start of construction, and is in favor of the Project. Accordingly, inasmuch as the proposed roadway exten- sion will result in further property development, it is recom- mended that the construction be undertaken as soon as possible, and that the necessary funds to cover the City's share be appropriated. Respectfully submitted, of hn T, ra ley, City Engineer