HomeMy WebLinkAbout1983-12-12 84-50 ORDER�LUcdcwi ea-sc Introduced by Cwmilox Cavia; oecember 12, 19e3 CITY OF BANGOR (TITLE.) VnKI}RTx........ Accepting City Engineer's,Report - Final Cost o£.... Haskell Rom Construction By the MY Coundd oftA 04 of Baw -- ORDERED, THAT the attached report of the City Engineer showing the actual costs and recommended assessments for the construction of Haskell Road extending east from Hogan Road to the land of Sohn S. Davis, including the installation of a sanitary sewer, be and hereby is accepted$ and be it further ORDERED] THAT those property owners who contributed a prepayment of the estimated assessment for construction be proportionately reimbursed from the balance of funds remaining, as outlined in said report. -1- In City- Council December 12,1983 Refeved to Finance Comuittee Consider neat regular meeting Councilor Dais Abstained traduced by C secilor Jordan city Cle / 1 n City Council December 28,1983 Passed Councilor Davis Abstained i City QAerx 84-50 ORDER Title,. Acu clog cicy engineec�e Report . P...... .... .... Final Coat of Haskell Road Construction I—ntroduced and Filed by CITY OF BANGOR, MAIM Engineering Department December S. 1983 To the Municipal Officers Reference is made to City Council Order No. 81-166 passed May 277 1981, which authorized the construction of Haskell Road, including theinstallation of a sanitary sewer, extending east from Rogan Road to the property of John J. Davis. All work has been completed, and a pending claim for additional damages as a result of right-of-way acquisition has been dropped, so that the final coats of the project have been determined. The roadway construction consisted of a 24 -foot wide paved travel way with 8 -foot gravel shoulders extending in an easterly direction for a distance of approximately 435 feet from Bogan Road, and thence in a northerly direction for a distance of approximately 1,110 feet to the property of John J. Davis. Is addition, an 8 -inch sanitary sewer was installed along the new roadway for a distance of 1,071 feet, including the installation of 4 manholes. The total actual cost of the roadway construction was $82$508.00, including right-of-way acquisition and engineering and the total actual cost of the sewer construction was $15 692.00, includengineering, for a total project cost of $98,200.(10. The City s share of the road and sewer construction is fifty percent, or $41,254.00 for the road and $7,846.00 for the sewer, and the remaining amounts are to be assessed against the property owners in proportion to the amount of acreage benefitted, as follows: -2- Road Sewer property Area =stimated Area —=atimated Owner Benefitted Assessment Benefitted Assessment Mary Jens Helfrich (Linesmen Ford Sales) 2.21 as. $3,688.10 1.10 as. $ 734.54 Ralph Dyer, Inc. 2.33 ac. 3$886.47 2.33 ac. 1$555.84 John B. Dyer and ' Roselle Neely Dyer 5.38 as. 10,647.38 4.92 as. 3,285.30 Robert BaRoss 2.71 so. 4$522.68 2.71 as. 1,809.84 John J. Davis 11.09 as. 18.507.37 0.69 as. 460.48 Totals - $419254.00 $ 71846.00 -2- The actual construction cost was less then the original estimate by approximately fifteen percent. Since the property owners originally, prepaid their assessments based upon the estimated cost of coustruction, partial refunds am in order, as follows: Road Sewer Paid "efund Paid—Tefund Mary Jena Helfrich. $ 4,405.25 $ 717.15 $ 781.75 $ 47.21 Ralph Dyer, Inc. 129717.42 21070.04 31496.34 211.04 John B. Dyer and Roselle Neely Dyer 49644.45 755.98 1,655.79 99.95 Robert BaRoss 51401.90 879.22 1,926.10 116.26 John J. Davis 22.105.98 3,598.61 490.02 29.54 Totals $49,275.00 $81021.00 68,350.00 $504.00 It is recommended that refunds be made to the participating property owners as noted above. Plans showing the road and sewer construction are on file in the Office of the City Engineer. Respectfully submitted, JohnT. Frawley, City En Fr City Engineer -3-