HomeMy WebLinkAbout1985-05-13 85-179 ORDER85-179 Introduced by Councilor Cox, lfay 13, 1985 CITY OF BANGOR (TITLE.) (@rb T Authorising Construction of Phase I and11, Rpads_._and �__.... 1111. Sewers - Pine Meadows Subdivision .1..__1__ 11..--I---I.... -.1111.._ 11 11 ......... _1111 By lU as; Ca ueil of Ow My of Beeler: ORDERED, THAT the attached report of the City Engineer showing the estimated cost of the construction of the roads and sewers in - phase I and II of the Pine Meadows Subdivision on Finson Road be and hereby is accepted; and be it further ORDERED, THAT construction begin on said roads and sewers as soon as passible{ and be it further ORDERED, ?: THAT the sum of One Hundred Forty-three Thousand.. One Hundred Dollars ($143,100.00) be transferred from the Reserve for Future Construction - Sewer Fund to cover the cost of the sewers forr said project, and the sum of Eighty-one.Thousind Fifty Dollars ($81,050.00), be transferred from the Reserve for Future Construction - General Fund for the construction of the roads; and be it further ORDERED, THAT the assessments for the Developer's share of said improve- ments be levied as the lots are sold, with a minimum of six lot assessments to be levied each year, for the first three years, and the remaining assessments to be levied at the end of three years, as more fully explained in said report. 'S: 85-1]9 ORDER -85 MAY-9 P3:1Oxiue, In City Council May 13,1985 vote for passage BYea, lswac• Authorizing c nstzUction Of. Vwse. I "and.II voting Yes Bra n,cox CItY of ii.. �G•.. ............. Wvis,PraMel,Gass,Mc cagyNpGLEO ,Roads and Sewers Finer meadows subdivision - wbeeler,Willey voting No Tilley ' Ci [y Clerktr'oodby � onncilman. y .. .. CITY OF EAMCOR, MAIMS Engineering Department April 181 1985 To the Municipal Officers: Reference is made to City Council Order No. 85-122 passed February 25, 1985 directing the City Engineer to do a study to determine the cost of constructing the roads and sewers in the Fine Meadows Subdivision, which was recently approved by the Planning Board. Plans and Cost Estimates have been completed. Wich would indicate the following: The Pine Meadows Subdivision is located on the easterly side of Finson Road and the northerly side of Pushaw Road, and would involve the construction of three streets: Shepherd Drive, Airedale Kees and Vizsla Avenue. These streets would serve a total of 75 single family house lots}} primarily intended for manufactured housing: said lots varysng in size from 9:000 to approximately 27,000 square feet. Seventeen of the lots will front on existing streets, Pinson Road and Pushaw Road. In addition to the street construction, the plans would require .,the installation of storm and sanitary sewer systems as well as water under a separate agreement with the Bangor Hater District. The Developer proposes to construct the project in three phases. The first phase would develop 15 of the lots which front on either Finson Road or Pashaw Road, and would involve ditch line modification of those streets, together with the installation of storm and sanitary sewer systems. The second phase would involve the construction of Shepherd Drive and Airedale Place, including storm and sanitary sewers, which would serve an additional 31 lots. The final phase would consist of the construction of Vizsla Avenue, together with storm and sanitary sewers, and would serve the remaining 29 lots. A more specific description, and a breakdown of the cost of each phase is as follows: PHASE I This phase would involve filling in the ditch along Pushaw Road, and installing a storm sewer with two catch basins, extended to the existing drainage ditch which lies in the field to the south of the development; the extension of an eight inch sanitary sewer and six manholes, connected into the existing sanitary sewer located near the above-mentioned drainage ditch: and the instal- lation of four inch sanitary sewer laterals to each lot line. Since Pushaw Road is presently an accepted street, the City would pay two-thirds of the work attendant to the filling in of the ditch and paving the edge. of the road; the remaining sewer work would be fifty percent assessable, except that the Developer would Dave to pay the entire cost of the sewer laterals to each lot. -1- II This phasewould include the construction of Shepherd Drive between Finson Road and Pushaw Road; the construction of Airedale The estimated costs of Phase I are as follows; including eight catch basins; and the installation of City - Developer Total Road $ 71600. $ 3,800. $11,400. Storm Sewer 9,800. 9,800. 19,600. Sanitary Sewer 19,500. $34v9OG.$31,100 17.500. 3355�000. $6�i�bIIO. Developer Total Road (Finson) $ 29680. $ 1,340. Sewer Laterals Road ((Shephard & 0. ;•50� o0.. Airedale) 1500'$ 5.75 8,625. 57,005. $ , $69, Lots Served 1-131 26 & 27 = 15 Sanitary Sewer �18� $47,855. 18 200. 6 RIM: Assessment per Lot $34,600 t 15 - $2,310. II This phasewould include the construction of Shepherd Drive between Finson Road and Pushaw Road; the construction of Airedale Place; the installation of a storm sewer system, including eight catch basins; and the installation of an eight inch sanitary sewer with six manholes. Sewer laterals would also be installed to each lot. The City's share of the mad construction would be $5.75 per foot, and we would pay fifty percent of the storm and sanitary sewers, except the .laterals. The estimated coats of Phase I1 are as follows: City Developer Total Road (Finson) $ 29680. $ 1,340. 8 4,020. Road ((Shephard & Airedale) 1500'$ 5.75 8,625. 57,005. 65,630. storm Sewer 18050. 18,350. 36,700. Sanitary Sewer �18� $47,855. 18 200. 6 RIM: ��. 400. $142;756. Sewer Laterals 11 $ ll ,... 5. Lots Served 14-25, 28-30, 49-64 . 31 Assessment per Lot $106,795 -' 31 = $3,445. III This phase would include the construction of vissla Avenue; the installation of approximately 200 feet of storm sewer and two catch basins; and the installationofan eight inch sanitary sewer and six manboles. Service laterals would be installed to each lot. The City's share of the mad construction would be $5.25per foot, and the City would pay fifty percent of the storm and sanitary sewers, except,. the sewer laterals. -2- The estimated coats of Phase III are as follows Lots Served 31-48, 65-75 = 29 Assessment per Lot $80,290 s 29 - $2,770. It is the Developer's desire to schedule the construction of Phase I and Phase II during the 1985 construction season, deferring the construction of Phase III until the demand for additional lots dictates. Therefore, the current project would. utilize Finson Hoed and Puahaw Road, and would require the construction of Shepherd Drive and Airedale Place, with all appurtenant store and sanitary sewers. A total of 46 lots would be made available at a total estimated cost to the City of $82,755.00, a total cost to the Developer of $141,395.00, and a total project cost for Phases I and II in the amount of $224,150.00. The average assessment to the Developer would be $3,074.00 per lot. :COST / BENEFIT ANALYSIS The property in its presently undeveloped state has "a valuation of $27,800.00, and thus generates taxes of approximately $900.00 per year; the area encompassed by the 46 lots in Phase I and Phase II would generate approximately $550.00 per year. The City Assessor has indicated that once the streets and utilities are installed and the lots are ready for sale, than the value of each lot will increase to approximately $6,000.00, so that the area encompassed by the 46 lots in Phases I and II will generate $8,830.00, or an annual increase of almost $8,300.00. CITY COST It has been the City's policy during recent years to pay the initial cost of the construction of residential subdivisions, levying the assessments as lots ere sold, with all outstanding assessments to be paid within three years; oris does not include the development of the subdivision Plan, preliminary engineering, and the installation of water, which the Developer must pay for at his own expense. It is anticipated that the City would use funds from the General Reserve and the Sewer Reserve funds to cover the costs of the roads and sewers. Assuming that the City initially paid -3- Cit -7 Developer Total Road (Vizala) 1510% 5.25 $ 70930. $461710. $54,640. Storm Sewer 3,680. 3,680. 7,360. Sanitary Sewer 18.300. $ 910 18.300. $11 6� $ 8,600. Hexer Laterals 11 600. 11 600C-80. Lots Served 31-48, 65-75 = 29 Assessment per Lot $80,290 s 29 - $2,770. It is the Developer's desire to schedule the construction of Phase I and Phase II during the 1985 construction season, deferring the construction of Phase III until the demand for additional lots dictates. Therefore, the current project would. utilize Finson Hoed and Puahaw Road, and would require the construction of Shepherd Drive and Airedale Place, with all appurtenant store and sanitary sewers. A total of 46 lots would be made available at a total estimated cost to the City of $82,755.00, a total cost to the Developer of $141,395.00, and a total project cost for Phases I and II in the amount of $224,150.00. The average assessment to the Developer would be $3,074.00 per lot. :COST / BENEFIT ANALYSIS The property in its presently undeveloped state has "a valuation of $27,800.00, and thus generates taxes of approximately $900.00 per year; the area encompassed by the 46 lots in Phase I and Phase II would generate approximately $550.00 per year. The City Assessor has indicated that once the streets and utilities are installed and the lots are ready for sale, than the value of each lot will increase to approximately $6,000.00, so that the area encompassed by the 46 lots in Phases I and II will generate $8,830.00, or an annual increase of almost $8,300.00. CITY COST It has been the City's policy during recent years to pay the initial cost of the construction of residential subdivisions, levying the assessments as lots ere sold, with all outstanding assessments to be paid within three years; oris does not include the development of the subdivision Plan, preliminary engineering, and the installation of water, which the Developer must pay for at his own expense. It is anticipated that the City would use funds from the General Reserve and the Sewer Reserve funds to cover the costs of the roads and sewers. Assuming that the City initially paid -3- the total cost of 8224,150.00, then the estimated annual loss of interest on the money used would be $23.500.00. In addition, an additional $500.00 per year would be expended for plowing, salting and maintaining the new roads, making a total annual cost to the City of $24 000.00. Since the tax revenue would be increased a minimum o£8,000.00, the net cost to the City would be $16,000.00 per year. An mentioned previous i9 the outstanding assessment on each lot would be approximately $$3,0%4.00, so that if six lots were sold each year then the assessments received, plus the increased taxes, would more than offset the City's annual cost. It should also be pointed out that the installation of a manufactured housing unit or the construction of a single family home will further sub- stantially increase the taxes received amounting to an estimated $500.00 additional increase per lot. �he 46 lots will eventually generate approximately $35,000.00 annual taxes when fully developed. At the end of the first three years, it is proposed that any outstanding assessments be levied. The payment of these assessments might be in the form of annual payments plus a fixed interest per- centage, depending upon the amount of the outstanding assessment. EDUCATION & PUBLIC SAFETY 005TE Additional costa will be realised for required police and £ire protection, and for the education of school age children within the project area. Recent studies indicate that manufactured housing unite generate an average of .64 students per two or three bedroom unit, which is almost identical to the average for two and three bedroom single family homes. It cannot be determined how many of these units will be occupied b9 new families who are not presently in the Bangor school system; generally speaking, Bangor's population has not increased for a number of years, so there may be no additional impact. Recant statistics furnished by the School Department indicate an average annual cost of education per student to be $1,850.00, or an average cost per household of $1,185.00. This amount is obviously in excess of the taxes that would be generated, based upon an average value of $309000.00 per property. The cost of police and fire protection attributed to residential service is not clear; however, assuming a coat of approximately $190.00 per household, then the total cost of City services would be approximately $1 800.00, which would require a fair market value per lot in excess oY $80,000.00. Since a majority of the residential single family pro$erties in Bangor do not have such value, than it is clear that residential taxes do not generally cover the cost of City services. It should also be pointed out that the actual cost of education may not increase as a result of the construction of new households, but instead, the cost of education per student may be lowered if a certain number of additional students are added to the school system. This is assuming that there is a certain amount of addi- tional capacity in the present school system. -4- It should be noted that all of the above-mentioned costs apply to all housing units constructed in the City, and not only to the subject project. The same impact would be felt for every single family house constructed, whether it be part of this development, an existing subdivision, or an individual house lot; consequently, it is felt that this project should not be singled out except for the cost of the new roads and utilities. RSOCPII4EffiIATIOH It is recommended that Phases I and II of the subject project be constructed, with the initial expense of the road and sewers in the estimated amount of $224,150.00 to be paid by the City out of the General and Sewer Reserve funds. It is further recommended that the assessments, estimated at $3.074.00 per lot, be assessed as each lot is sold, subject to the receipt of an acceptable Sub- ordinate Agreement from the Developer, with a minimum of six lot assessments to be levied each year, and further provided that all remaining assessments for the lots in Phases I and II be levied at the end of three years from the data of the completion of construc- tion and the submission of a final report to the City Council. Respectfully submitted, "Wt_ -7 T '-c�-11( JTF:jkp John T. Frawley, City'Thgineer -5-